April 3, 2006 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

KEWAUNEE POWER STATION-NOTIFICATION OF NRC SUPPLEMENTAL INSPECTION FOR WHITE AND YELLOW FINDINGS AND REQUEST FOR INFORMATION

Dear Mr. Christian:

This letter is to provide you with advanced information regarding materials needed to support our Inspection Procedure 95002 inspection. The inspection will focus on the root cause(s),

extent of condition, and corrective actions associated with the White auxiliary feedwater and Yellow turbine building flooding findings. The inspection is scheduled to begin on May 1, 2006, at your Kewaunee Power Station facility. Insofar as possible, this information should be provided electronically to the lead inspector. Any material not available electronically should be mailed to the addresses identified in the enclosure. We will review the requested material and identify those areas where more detailed information will be needed.

If you have any questions regarding our schedule or the material being requested, please contact Patricia Lougheed at (630) 829-9760. She may also be reached electronically at vpl@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by George Hausman Acting For/

Julio Lara, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-305 License No. DPR-43

Enclosure:

Requested Information to Support IP 95002 Inspection

Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

KEWAUNEE POWER STATION-NOTIFICATION OF NRC SUPPLEMENTAL INSPECTION FOR WHITE AND YELLOW FINDINGS AND REQUEST FOR INFORMATION

Dear Mr. Christian:

This letter is to provide you with advanced information regarding materials needed to support our Inspection Procedure 95002 inspection. The inspection will focus on the root cause(s),

extent of condition, and corrective actions associated with the white auxiliary feedwater and yellow turbine building flooding findings. The inspection is scheduled to begin on May 1, 2006, at your Kewaunee Power Station facility. Insofar as possible, this information should be provided electronically to the lead inspector. Any material not available electronically should be mailed to the addresses identified in the enclosure. We will review the requested material and identify those areas where more detailed information will be needed.

If you have any questions regarding our schedule or the material being requested, please contact Patricia Lougheed at (630) 829-9760. She may also be reached electronically at vpl@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Julio Lara, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-305 License No. DPR-43

Enclosure:

Requested Information to Support IP 95002 Inspection DOCUMENT NAME: G:\DRS\Monticello Input to Report 06-02 DRM1.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME PlougheedL: ls PLouden JLara DATE 04/03/06 04/03/06 04/03/06 OFFICIAL RECORD COPY

D. Christian cc w/encl: M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin

D. Christian ADAMS Distribution:

JLD JFS2 RidsNrrDirsIrib GEG KGO SXB3 CAA1 DRPIII DRSIII PLB1 JRK1

Requested Information to Support IP 95002 Inspection Please provide the following documents to the NRC by April 17, 2006. Preferably these documents should be sent electronically to the lead inspector, Patricia Lougheed. Her e-mail is vpl@nrc.gov. If the information cannot be sent electronically, it should be mailed in such a manner as to reach the following locations by April 17, 2006.

US Nuclear Regulatory Commission Attn: Patricia Lougheed 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 US Nuclear Regulatory Commission Attn: T. Steadham Resident Inspector, Fermi 6450 North Dixie Highway Newport, MI 48166-9726 INFORMATION TO BE MAILED OR ELECTRONICALLY SENT:

Procedures

  • The current procedure(s) governing the identification and resolution of problems.
  • The current procedure(s) governing root cause and apparent cause evaluations.
  • The current procedure(s) governing common cause assessments, effectiveness reviews, and self-assessments.
  • Previous revisions of the above items applicable to the station for the last three years.

Root Cause Reports

  • The Root Cause Investigation report for the AFW pump issue.
  • The Root Cause Investigation report for the flooding issue.
  • The Root Cause Investigation report for any combined investigation into common causes for the above two issues.

Assessments

  • Quality assurance (nuclear oversight) or self-assessment reports, applicable to the station, pertaining to engineering for the last three years excluding any self-assessment performed specifically for any NRC inspection, including this one.

Enclosure

  • Quality assurance (nuclear oversight) or self-assessment reports, applicable to the station, pertaining to the operating experience program for the last three years excluding any self-assessment performed specifically for any NRC inspection, including this one.
  • Quality assurance (nuclear oversight) or self-assessment reports, applicable to the station, pertaining to the corrective action program, including any assessment of corrective action effectiveness, for the last three years excluding any self-assessment performed specifically for any NRC inspection, including this one.

Corrective Action Program Sorts Note: The following sorts should be in numerical order by corrective action number.

  • A sort from the corrective action program of all documents, both open and closed, where a root cause investigation was performed in the last three years;
  • A sort from the corrective action program of all documents, both open and closed, where an apparent cause investigation was performed in the last three years;
  • A sort from the corrective action program of all documents, both open and closed, where an operability determination was performed in the last three years;
  • A sort from the corrective action program of all documents, both open and closed, where a common cause assessment was performed in the last three years;
  • A sort from the corrective action program of all documents currently open where the issue was determined to be a significant condition adverse to quality;
  • A sort from the corrective action program of all documents currently open where the issue was identified during an NRC inspection; and
  • A sort from the corrective action program of all documents currently open where the issue was discovered as a result of, a review of operating experience or generic information. Exclude any corrective action documents written to initiate an operating experience review.

INFORMATION TO BE AVAILABLE ON-SITE

  • Supporting documentation for the root cause reports.
  • Copies of any documents requested by the NRC as a result of reviewing the above information.
  • Corrective action document showing disposition of flooding issue when first discovered in 2003.

Enclosure

  • Corrective action document showing disposition of AFW discharge pressure switch issue in 1997.
  • Final disposition packages for any completed corrective actions or corrective actions to prevent recurrence from the root cause reports.
  • Schedules for completion for any open corrective actions or corrective actions to prevent recurrence from the root cause reports.
  • Effectiveness reviews performed for any completed corrective actions or corrective actions to prevent recurrence from the root cause reports.
  • Self-assessment prepared in advance of the inspection.

BACKGROUND INFORMATION TO SUPPORT THE INSPECTION

  • Technical Specifications
  • Site Procedures
  • Site Organization Charts
  • Site Contact List/ Phone Book Enclosure