Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000259/200900230 April 2009IR 05000259-09-002, 05000260-09-002 and 05000296-09-002, on 01/01/2009 - 03/31/2009, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Surveillance Testing, Identification and Resolution of Problems, and Event Follow-upSafe Shutdown
Reactor Vessel Water Level
Packing leak
Fire Barrier
Weld Overlay
Nondestructive Examination
Condition Adverse to Quality
Corrosion bonding
Significance Determination Process
Pressure boundary leak
Through Wall Leak
Downpower
Unidentified leakage
IR 05000259/200940227 April 2009NRC Security Inspection Report 05000259/2009402, 05000260/2009402 & 05000296/2009402Affidavit
ML08086012917 April 2009August 2007-301 Exam Draft Written Outlines & ES-401-6
ML0901307181 April 2009Schedule Update for the Extended Power Uprate Amendment Requests (TAC Nos. MD5262 and MD5263) (TS-431 and TS-418)
ML0907110772 April 2009Safety Evaluation for Relief Request 1-ISI-18 Associated with Inspection and Testing of SnubbersIncorporated by reference
ML0907701623 June 2009TVA, Presentation Slides for Browns Ferry, Unit 1
ML0909300432 April 2009Notice of Category 1 Public Meeting with Tennessee Valley Authority, Browns Ferry, Units 1, 2 & 3, to Discuss Nrc'S Reactor Oversight Process Annual Assessment
ML0909302851 April 2009Watts Barr (WBN) Nuclear Plants - Insurance Status
ML0909600736 April 2009Brown Ferry, Unit 2 - Notification of Inspection and Request for InformationNondestructive Examination
ML09100005110 April 2009Notification of Insp. & Request for Info. for Problem Identification & Resolution Inspection.Browns Ferry - Notification of Inspection. & Request for Info. for Problem Identification & Resolution InspectionProbabilistic Risk Assessment
Operator Manual Action
Maintenance Rule Program
ML09100028322 April 2009Public Letter and RAI - Request for Additional Information for Extended Power Uprate-Round 23 (TAC Nos. MD5262 and MD5263) (TS-431 and TS-418)Safe Shutdown
Reactor Vessel Water Level
Operator Manual Action
ML0910002913 April 2009(BFN) - Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Response to Round 23 Request for Additional Information (RAI) EMCB.205 and EMCB.206
ML09104071722 April 2009Brown Ferry Nuclear Plant, Unit 1, 2, and 3 - Request for Withholding Information from Public Disclosure (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418)
ML09105070429 May 2009Issuance of Amendments 274, 301 and 260 Regarding Control Rod Notch Test Frequency (TS-462)Anticipated operational occurrence
Functionality Assessment
Fuel cladding
ML09106038110 April 2009Technical Specification (TS) Changes TS-431 & TS-418 - Extended Power Uprate (EPU) - Transmittal of Containment Parameters and Total Shutdown Power FractionsStroke time
Power Uprate
ML0911200324 June 2009G20090158/EDATS: OEDO-2009-0133 - March 18, 2009, ACRS Ltr on Using Containment Accident Pressure in Determining Available Net Positive Suction Head of Emergency Core Cooling System and Containment Heat Removal System Pumps
ML09120004016 June 2009Safety Evaluation for Relief Request 2-ISI-18R1 Associated with Inservice Inspection Examination CoverageWeld Overlay
Incorporated by reference
ML09120006224 April 2009(BFN) - Response for Additional Information Regarding Units 1, 2, and 3 - Technical Specifications (TS) Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force (TSTF) ...Safe Shutdown
ML09120006424 April 2009Technical Specifications Change 464 - Application for Technical Specification Improvement to Adopt Technical Specification Task Force TSTF-476, Rev. 1, Improved BPWS Control Rod Insertion ProcessIncorporated by reference
ML09120022630 April 2009Annual Radiological Environmental Operating Report for 2008Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Chernobyl
ML09125017729 April 2009(BFN) Units 1, 2, & 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Request for Information Regarding Containment Parameters for NRC Confirmatory Analysis.Safe Shutdown
ML09128026330 April 2009Submittal of Annual Radioactive Effluent Release Report - January Through December 2008Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
ML09128026430 April 2009Offsite Dose Calculation Manual 0-ODCM-001, Revision 0019Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML0913201828 May 2009Changes to Distribution Lists for TVA Dockets
ML0913201837 May 2009(Bfn), Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Response to Round 23 Request for Additional Information (RAI) EMCB.207
ML0913203667 May 2009Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Results of Revised Containment Overpressure Analyses for Appendix R - Drywell Coolers OperatingSafe Shutdown
ML09138007719 May 2009Project Manager and Backup Reassignments
ML0913805309 June 2009Request for Additional Information for Extended Power Uprate - Round 24 (TAC MD5262) (TS-431)
ML0913906314 June 2009ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, SlidesProbabilistic Risk Assessment
Nondestructive Examination
Cyber Security
Fuel cladding
ML09139064218 May 2009American Society of Mechanical Engineers Section XI, Inservice Inspection Program - Request for Relief 2-ISI-21, Revision 1 - Examination of Piping Weld OverlaysWeld Overlay
Nondestructive Examination
ML09141028518 May 2009American Society of Mechanical Engineers Section XI, Inservice Inspection Program for the Third Ten-Year Inspection Interval - Request for Relief 2-ISI-22Weld Overlay
Hydrostatic
VT-2
Through-Wall Leak
Through Wall Leak
Dissimilar Metal Weld
ML09147020822 May 2009American Society of Mechanical Engineers (ASME) Section Xl, Inservice Inspection Program for the Third Ten-Year Inspection Interval - Request for Relief 2-1Sl-21, Revision 1 - ResubmittalWeld Overlay
Nondestructive Examination
ML09147028321 May 2009Withdrawal of Proposed Request for Exemption from 10 CFR 50.55a, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Third Ten-Year Inspection Interval - Request for Relief 2-ISI-22Hydrostatic
ML0915205453 June 2009Summary of Meeting with the Tennessee Valley Authority Regarding Proposed Fuel Transition Amendment
ML09154001426 May 2009Response to Request for Additional Information Regarding Technical Specifications Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force Change Number - 448, Rev. 3.
ML09154001529 May 2009Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 24 Request for Additional Information (RAI) EMCB.209 Regarding Steam Dryer AnalysesFlow Induced Vibration
ML0915404168 May 2009Draft COP Position Paper Submitted by E-mailProbabilistic Risk Assessment
ML0915405308 May 2009Bertram Morris, E-mail Chart Table of COP That Have Been Granted to Other BWRs for EPU
ML09161049912 June 2009Verbal Relief Related to Instrument Line Weld Overlay (TAC No. ME1319) (2-ISI-21)Weld Overlay
Hydrostatic
Through-Wall Leak
ML09163074216 June 2009Notice of Meeting with the Tennessee Valley Authority (TVA) to Discuss Extended Power Uprate
ML09167004518 June 2009Status of Decommissioning Funding Assurance
ML09167007118 June 2009Status of Decommissioning Funding Assurance
ML09167008018 June 2009Status of Decommissioning Funding Assurance
ML09168014312 June 2009Core Operating Limits Report (COLR) for Cycle 16 OperationShutdown Margin
ML09173050622 June 2009Pant - Notification of Triennial Fire Protection Baseline Inspection While Transition to 10 CFR Part 50.48(c) Is in Progress (NRC Inspection Report No. 05000259-09-009, 05000260-09-009, and 05000296-09-009Safe Shutdown
Fitness for Duty
Fire Barrier
Fire impairment
Temporary Modification
Fire Protection Program
ML09174003222 June 2009Notification of Browns Ferry Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report 0500259-09-008, 05000260-09-008, and 05000296-09-008Probabilistic Risk Assessment
ML09175009519 June 2009Technical Specifications (TS) Change TS-466-T - Request for One-time Extensions of TS 3.8.1 Condition B Required Action B.4 Completion Time - Emergency Diesel Generators (Edgs) a, B, C, D, 3A, 3B, 3C, and 3DSafe Shutdown
ML09176026030 June 2009Corrections to Amendment Nos. 274, 301, and 260 Regarding Control Rod Notch Test Frequency
ML09177054026 June 2009Cancellation of Meeting Notice, Meeting with the Tennessee Valley Authority (TVA) to Discuss Extended Power Uprate at Browns Ferry
ML09180045329 June 2009Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development WorkshopLicense Renewal