Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML17048A1573 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 1, Introduction and General Description of the PlantSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Incorporated by reference
FLEX
Tornado Generated Missile
Earthquake
ML17048A1763 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 1 Figures, Introduction and General Description of the Plant
ML17048A1963 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 1 Drawings FSAR Figures 1.2 - 1 Through 1.2-48 Are Withheld Per Regulatory Issue Summary 2015-17
ML17048A4615 April 2017Final Safety Analysis Report, Revision OL-22, Chapter 2 Figures, Site CharacteristicsUltimate heat sink
Hydrostatic
Met Tower
Operating Basis Earthquake
Earthquake
ML17053A7215 April 2017Final Safety Analysis Report, Revision OL-22, Chapter 6 Figures, Engineered Safety Features
ML17060A5695 April 2017Final Safety Analysis Report, Revision OL-22, Chapter 2, Site CharacteristicsSafe Shutdown
High winds
Ultimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Design basis earthquake
Frazil ice
Earthquake
Accidental discharge
ML17061A1285 April 2017Final Safety Analysis Report, Revision OL-22, Chapter 9 Figures, Auxiliary Systems
ML17061A1575 April 2017Final Safety Analysis Report, Revision OL-22, Chapter 12, Radiation ProtectionSafe Shutdown
Boric Acid
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Coatings
Fuel cladding
Pressure Boundary Leakage
Scaffolding
ML17061A2045 April 2017Final Safety Analysis Report, Revision OL-22, Chapter 9Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Loop seal
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Emergency Lighting
Finite Element Analysis
B.5.b
Surveillance Frequency Control Program
Design basis earthquake
Excess Flow Check Valve
Earthquake
Control of Heavy Loads
Power-Operated Valves
Fuel cladding
Fire Protection Program
Power change
Siren
ML17061A3185 April 2017FSAR Revision OL-22, Chapter 12 Figures
ML17062A5878 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 13 Figures, Conduct of Operations
ML17065A0148 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 13, Conduct of OperationsBoric Acid
Fitness for Duty
Shutdown Margin
Non-Destructive Examination
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Safeguards Contingency Plan
ML17065A0908 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 15, Accident AnalysisSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Grab sample
Stroke time
Safe Shutdown Earthquake
Emergency Lighting
Design basis earthquake
Earthquake
Control of Heavy Loads
Fuel cladding
Coast down
ML17067A3608 March 2017Callaway Plant, Unit 1 - Final Safety Analysis Report, Revision OL-22, Chapter 3, Design of Structures, Components, Equipment and Systems
ML17069A14310 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 4 Reactor
ML17072A01513 March 2017Final Safety Analysis Report Text, Revision OL-22, Chapter 4, ReactorBoric Acid
Shutdown Margin
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Fuel cladding
Power change
Flow Induced Vibration
ML17074A23615 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 5, Reactor Coolant System and Connected SystemsSafe Shutdown
Boric Acid
Loop seal
Ultimate heat sink
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Past operability
Operating Basis Earthquake
Nondestructive Examination
Pressure and Temperature Limits Report
Power-Operated Valves
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Scaffolding
Power change
ML17075A14216 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Water Inventory Control
Met Tower
Earthquake
Fuel cladding
Power change
ML17075A16016 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 7 Figures, Instrumentation and Controls
ML17075A33720 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 15 Figures, Accident Analysis
ML17076A37517 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 8, Electric PowerSafe Shutdown
Boric Acid
Fire Barrier
Temporary Modification
Emergency Lighting
ML17076A37617 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 10 Figures, Steam and Power Conversion System
ML17079A01620 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 11, Radioactive Waste ManagementSafe Shutdown
Boric Acid
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Process Control Program
Fuel cladding
Pressure Boundary Leakage
ML17079A03720 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 11 Figures, Radioactive Waste Management
ML17079A20122 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 8 Figures, Electric PowerLoop seal
ML17086A04927 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 14, Initial Test Program
ML17088A16729 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 17, Quality Assurance
ML17089A40730 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 16 Figures, Technical Specifications
ML17090A16530 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 16, Technical SpecificationsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Probabilistic Risk Assessment
VT-2
Incorporated by reference
Missed surveillance
Tornado Missile Protection
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Earthquake
Power change
ML18207A54819 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 1.0, Introduction and General Description of the Plant
ML18207A54919 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 2.0, Figures 2.3-1 Through 2.5-7Hydrostatic
ML18207A55019 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 2.0, Site CharacteristicsEarthquake
ML18207A55119 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 3.0, Figures 3A-1 Through 3.8-130
ML18207A55519 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 4.0, Figures 4.2-1 Through 4.4-21
ML18207A55719 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 4.0, Reactor
ML18207A55819 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 5.0, Figures 5.1-1 Through 5.4-21
ML18207A55919 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System and Connected Systems
ML18207A56019 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 6.0, Figures 6.3-1 Through 6.2.6-1
ML18207A56119 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 6.0, Engineered Safety Features
ML18207A56219 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 7.0, Figures 7.1-1 Through 7.7-16
ML18207A56319 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls
ML18207A56519 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 8.0, Figures 8.3-1 Through 8.3-7Boric Acid
ML18207A56619 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 8.0, Electric Power
ML18207A56819 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 9, Auxiliary SystemsFire Protection Program
ML18207A57019 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 10, Figures
ML18207A57119 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML18207A57219 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 11, Figures
ML18207A57319 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML18207A58019 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 12, Figures
ML18207A58119 June 2018Revision OL-23 to Final Safety Analysis Report, Chapter 12, Radiation ProtectionSafe Shutdown
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Coatings
Fuel cladding
Pressure Boundary Leakage