Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
HCH-2006-045, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for August 200620 September 2006New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for August 2006NJPDES
LR-N05-0021, Revised Backup Stability Protection Evaluation Report12 January 2005Revised Backup Stability Protection Evaluation Report
LR-N05-0258, Request for License Amendment Extended Power Uprate7 November 2005Request for License Amendment Extended Power Uprate
LR-N05-0275, Supplemental Report of Changes, Tests, and Experiments, Hope Creek Generating Station13 May 2005Supplemental Report of Changes, Tests, and Experiments, Hope Creek Generating StationTurbine Missile
LR-N06-0413, Supplement to License Amendment Request for Extended Power Uprate10 October 2006Supplement to License Amendment Request for Extended Power UprateFinite Element Analysis
Flow Induced Vibration
LR-N07-0034, C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions.31 January 2007C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions.Flow Induced Vibration
LR-N07-0298, C.D.I. Report No. 04-09NP, Revision 6, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes.31 March 2005C.D.I. Report No. 04-09NP, Revision 6, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes.
LR-N08-0033, CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model.31 January 2008CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model.Finite Element Analysis
Liquid penetrant
Flow Induced Vibration
LR-N08-0123, C.D.I. Technical Note No. 07-29NP, Revision 2, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Hope Creek Unit 1.31 May 2008C.D.I. Technical Note No. 07-29NP, Revision 2, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Hope Creek Unit 1.Finite Element Analysis
LR-N08-0199, Attachment 4 - C.D.I. Technical Note No. 08-20NP, Rev. 1, Limit Curves with ACM Rev. 4 for 111.5% Power Level Basis at Hope Creek Unit 1.31 August 2008Attachment 4 - C.D.I. Technical Note No. 08-20NP, Rev. 1, Limit Curves with ACM Rev. 4 for 111.5% Power Level Basis at Hope Creek Unit 1.Finite Element Analysis
LR-N08-0199, Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions.31 August 2008Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions.Finite Element Analysis
Liquid penetrant
LR-N08-0224, Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 031 October 2008Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0Finite Element Analysis
LR-N08-0224, Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 131 October 2008Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1Finite Element Analysis
Liquid penetrant
LR-N10-0239, 0000-0119-1728, Revision 0, Hope Creek Cycle 17 Stability Results for GE14i Support, Attachment 130 June 20100000-0119-1728, Revision 0, Hope Creek Cycle 17 Stability Results for GE14i Support, Attachment 1
LR-N11-0289, Site-Specific Cost Estimates15 September 2011Site-Specific Cost EstimatesFuel cladding
Fire Watch
Scaffolding
LR-N12-0366, Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 530 November 2012Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J28 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-7528 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-14928 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N28 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G30 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 930 November 2012Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9
LR-N14-0024, Report SL-011553, Revision 2, Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic29 January 2014Report SL-011553, Revision 2, Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: SeismicSafe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
LR-N15-0178, NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary)30 September 2015NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary)
LR-N16-0113, NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan.30 September 2015NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan.
LR-N16-0113, NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.31 August 2016NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.Safe Shutdown Earthquake
Operating Basis Earthquake
Cyber Security
LR-N17-0044, Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Ve31 December 2016Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi
LR-N17-0044, Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version)31 March 2017Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version)
LR-N17-0092, Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report28 April 2017Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits ReportPressure and Temperature Limits Report
LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary9 November 2017License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-ProprietaryAnticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
LR-N18-0057, Pressure and Temperature Limits Report, Revision 18 June 2018Pressure and Temperature Limits Report, Revision 1Pressure and Temperature Limits Report
ML03041028931 January 2003Document Transmittal Form, EPIP059, List of Updated Documents, Table of Contents - Figure 1-2High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Met Tower
ML03052026915 February 2003Follow-up Report, Reference Event #39516
ML04146048121 May 2004Attachment to 5/21/04 PSEG Ltr - USA Final Report - PSEG Nuclear, LLC Salem / Hope Creek Safety Culture AssessmentBoric Acid
Enforcement Discretion
Scaffolding
ML04301056330 September 2004GENE-0000-0029-6193-02-R0, Bsp Evaluation Report, Ellla Backup Stability Protection Evaluation for Hope Creek Cycle 13.
ML0434504299 September 2004FEMA Final Exercise Report for the 03/16/2004 Salem/Hope Creek Nuclear Power Station Plume Pathway Exercise Letter Dtd 09/09/2004Offsite Dose Calculation Manual
Fuel cladding
ML05005011112 December 2004H-1-FD-CEE-1879, Hope Creek HPCI Exhaust Piping Supports Analysis Reported Damage in RF12.
ML05005047016 December 2004H-1-BB-MEE-1878, Hope Creek 'B' Recirculation Pump Vibration Analysis, Revision 1Coast down
ML05006002515 April 2003CR 70029861 Hope Creek 'B' Recirculation Pump Excessive Seal Leakage Condition Report, 03/01/2003Hydrostatic
Temporary Modification
Power change
Downpower
ML05006004126 December 1995H-1-BB-MEE-1050 Hope Creek Recirculation System Large Bore Pipe Cracking Resolution, 12/26/1995
ML05006005419 October 2004Design Change Package 80062466 Revision 1 Extended Power Uprate Piping Vibration Monitoring Installation Package, 10/19/2004Safe Shutdown
Fire Barrier
Stroke time
Hydrostatic
Met Tower
NJPDES
Incorporated by reference
Fuel cladding
Fire Protection Program
Scaffolding
Loctite
Flow Induced Vibration
ML05006011010 December 2004Design Change Package 80062466 Revision 2 Extended Power Uprate Piping Vibration Monitoring Installation Package, 12/10/2004
ML05006011423 December 2004Design Change Package 80062466 Revision 3 Extended Power Uprate Piping Vibration Monitoring, Installation Package, 12/23/2004Safe Shutdown
Fire Barrier
Stroke time
Hydrostatic
Met Tower
NJPDES
Incorporated by reference
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Scaffolding
Loctite
Flow Induced Vibration
Power Uprate
ML05014023212 December 2004H-1-BB-MEE-1878, Rev 0, Hope Creek 'B' Recirculation Pump Vibration Analysis, 12/12/2004Hydrostatic
Coast down
ML05014024526 October 2004Flowserve RAL-7482 Rev 0 Design Modification Report Assy 93-15122, 10/26/2004
ML05014024726 October 2004Flowserve RAL-7483 Rev 0 Design Modification Report Assy 93-14347, 10/26/2004
ML05014025329 April 2004HC-04Q-301 Hope Creek Extended Power Uprate Piping Vibration Monitoring, 4/29/2004Scaffolding
ML0509801735 April 2005PSEG Nuclear LLC Hope Creek Station B-Reactor Recirculation Decontamination Connection Leak Cause Determination Report Notification No. 20230319, Event Date: March 27. 2005Finite Element Analysis
Liquid penetrant
Through-Wall Leak
ML05179016131 May 2005New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report Hope Creek Generating StationNJPDES
ML05320020630 November 2005Attachment 12, EDO-33075, Class 1, Safety Analysis Report for Hope Creek Constant Pressure Power Uprate.Safe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Mission time
Stroke time
Anticipated operational occurrence
Time to boil
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Significance Determination Process
Feedwater Controller Failure
Large early release frequency
MELLLA
Earthquake
Hardened vent
Fuel cladding
Fire Protection Program
Power change
Flow Induced Vibration
Power Uprate
Failure to Scram