ML050050111
ML050050111 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 12/12/2004 |
From: | Andrea Johnson, Keck B Public Service Enterprise Group |
To: | Office of Nuclear Reactor Regulation |
References | |
TAC MC5111 H-1FD-CEE-1879 | |
Download: ML050050111 (76) | |
Text
{{#Wiki_filter:H-1-FD-CEE-1 879 Hope Creek HPCI Exhaust Pilling Supports 12/12/04 Analysis of Reported Damage in RF12 revision 0 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damage in RF12 Page 1 of 9
H-I -FD-CEE-1 879 Hope Creek HPC1 Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RFI 2- Revision 0 Table of Contents I Revision Summary............................... 3 2 Purpose ............................... 3 3 Scope ............................. 3 4 Discussion........................................................................................................3 5 Support Observation Analysis ............................. 6 6 Conclusions and Recommendations ............................. 8 7 References ............................. 8 8 Effects of Other Technical Documents ............................. 8 9 Attachments ............................. 8 10 Signatures ............................. 9 Attachment A: Engineering WA'alkdown Report Attachment B: Pipe Support Drawings Attachment C: Lisega Snubber Outline Drawing Attachment D: Causal Factor Evaluation for Pipe support Observations Page 2 of 9
H-I -FD-CEE- 1879 Hope Creek HPCI Exhaust Piping Supports 12'; 2/04 Analysis of Reported Damage in RFI2 Revision 0 I Revision Sumimary Revision Date Descri tion and Reason for Change 0 12/10/04 Original Issue 2 Purpose On November 1, 2004, with the plant in Mode 5 for RF 12, tandem snubbers on the HPCI turbine exhaust piping failed during dynamic testing. Subsequent inspections of the HPCI system resulted in several observations. These observations were thought to confirm a damaging water hammer in HPCI exhaust piping. The tandem snubber condition was documented in Notification 20209622. This evaluation was prepared to assess if the observed conditions were caused by a water hammer in the HPCI exhaust piping system. 3 Scope The scope of this evaluation is the tandem snubber failure documented in notification 20209622 and the observations from the concomitant inspections on the HPCI exhaust line from the HPCI turbine to the torus penetration number P-201 (1-FD-006-HBB-20) and the vacuum breaker line from its attachment to the HPCI exhaust line to torus penetration P-204 (1-FD-006-HBB-3, 1-FD-008-HBB-3, and 1-FD-008-HBB-8. 4 Discussion 4.1 Background The HPCI System is designed to pump water through the 'A' Core Spray spargers and the 'A' Feedwater header. The primary purpose of HPCI is to maintain Reactor Pressure Vessel (RPV) inventory for small breaks that do not de-pressurize the RPV. The HPCI System may also be used for RPV pressure control. Finally the System may be used for RPV inventory control following reactor isolation and a coincident failure of the non-ECCS RCIC system. Exhaust steam from the HPCI turbine is discharged below the surface of the suppression pool. A drain pot at the low point in the exhaust line collects moisture present in the steam. Collected moisture is discharged through an orifice to the HPCI barometric condenser. A system of vacuum relief valves and isolation valves is installed as a vacuum breaker line, which cormects the free space in the suppression chamber with the HPCI turbine exhaust line. This Page 3 of 9
H-1-FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RFl2 Revision 0 mitigates the effects of water from the suppression pool being drawn into the HPCI turbine exhaust line. Table 4-1 lists the major components in the HPCI turbine exhaust line. The pipe lines are ASME Code Section III, Class 2. Piping struts, hydraulic snubbers, frames, and spring hangers support the piping. Table 4-2 lists the pipe supports of the lines in this evaluation. The isometric drawings for these lines are References 7.3 and 7.4. Per the IS snubber inspection program the inspection scope was expanded to other snubbers in the area. The scope was further expanded at the request of Design Engineering. In the end all snubbers and hangers were inspected on both the HPCI and RCIC turbine steam lines. Non-destructive NDE was also conducted on numerous welds as requested by Design Engineering (See Section 4.3). Table 4-1 Major Components in the HPCI Steam Exhaust Line Component Description HPCI Turbine Exhaust Drain Pot Collects condensate from turbine exhaust and turbine draining to barometric condenser Exhaust Line Rupture Disks Prevents overpressure protection of turbine casing and exhaust line Exhaust Line Check Valve (V004) Provide backflow isolation of the exhaust line from the suppression pool HPCI Turbine Exhaust Line Isolation Valve Isolates turbine exhaust line from the (HV-F071) suppression pool HPCI Turbine Exhaust Outboard Vacuum Isolates the torus atmosphere from the HPCI Breaker Isolation Valve (HV-F075) turbine exhaust line following a breach of the HPCI steam piping concurrent with high drywell pressure. HPCI Turbine Exhaust Vacuum Breaker Prevent the condensing action of the steam in Valves (PSV-F076, PSV-F077) the turbine exhaust lines from creating a vacuum and drawing torus water into the exhaust line HPCI Turbine Exhaust Inboard Vacuum Isolates the torus atmosphere from the HPCI Breaker Isolation Valve (HV-F079) turbine exhaust line following a breach of the HPCI steam piping concurrent with high I drywell pressure. Table 4-2 Pipe Supports on the HPCI Steam Exhaust Line Isometric Hanger No. Hanger Drawing Hanger Description Number Piping Isometric l-P-FD-01 H01 I-P-FD-006-HOI Variable Support H04 _-P-FD-006-H04 Sway Strut H06 I-P-FD-006-H06 Sway Strut H08 I-P-FD-006-HO8 Variable support Page 4 of 4
H-1-FD-CEE-1 879 Hope Cieek HPCI Exhaust Piping Supports 12/12/04 Analvsis of Reported Damaae in RF12 Revision 0 H1Il i -P-FD-006-H 11 Sway strut H12 1-P-FD-006-H12 Sway strut H13 I -P-FD-006-H 13 Sway strut H14 I-P-FD-006-H14 Sway strut H15 1-P-FD-006-H 15 Tandem hydraulic snubbers H17 1-P-FD-006-H 17 Sway strut H18 1-P-FD-006-HI 8 Hydraulic snubber H19 1-P-FD-006-HI9 Tandem variable support H22 1-P-FD-006-H22 Hydraulic snubber on valve operator Piping Isometric 1-P-BC-06 H03 1-P-FD-008-H03 Frame (box support) H04 1-P-FD-008-H04 Rigid Strut H05 1-P-FD-008-H05 Hydraulic Snubber H06 1-P-FD-008-H06 Variable Support H07 1-P-FD-008-H07 Rigid Strut H08 1-P-FD-008-H08 Rigid Strut H09 1-P-FD-008-H09 Rigid Strut H13 1-P-FD-008-H13 Frame H14 1-P-FD-008-H14 Rigid strut H15 1-P-FD-008-H15 Tandem Hydraulic snubbers H20 I-P-FD-006-H20 Hydraulic snubber H21 1-P-FD-006-H21 Sway strut 4.2 Support Observations The observations listed in table 4-3 were made by the ISI group during a systematic walk down of the HPCI exhaust piping. Each observation other than simple "no degradation observed" will be addressed in Section 5, Support Observation Analysis. Those supports with no comments were not inspected by ISI. Table 4-3 Observations Made During Pipe Support Inspections Hanger Drawing Number Observation Piping Isometric 1-P-FD-01 1-P-FD-006-HOI 20210445 - No degradation observed. Cold and Hot settings obscured by paint. Scraping of indicator against can shows 0.25 to 0.375"movement, hanger drawing shows 1/8" 1-P-FD-006-H04 20210440 - No loose parts. Strut misaligned 15 to 20 degrees, shifted toward wall penetration. I-P-FD-006-H06 No degradation observed. 1-P-FD-006-H08 No degradation observed. I-P-FD-006-HI I No degradation observed. I-P-FD-006-H12 No degradation observed. I-P-FD-006-H13 No degradation observed. l-P-FD-006-H14 No degradation observed. l-P-FD-006-H15 20209438, 20209622- Snubber test failure Page 5 of 9
H-1-FD-CEE-I 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF12 Revision 0 I-P-FD-006-H17 No degradation observed. I-P-FD-006-H18 No I-P-FD-006-HI9 No degradation observed. I-P-FD-006-H22 20210035 - Snubber as found setting not per design Piping Isometric 1-P-BC-06 I-P-FD-008-H03 I-P-FD-008-H04 I-P-FD-008-H05 I-P-FD-008-H06 I -P-FD-008-H07 1-P-FD-008-H08 1-P-FD-008-H09 I-P-FD-008-H13 I -P-FD-008-H 14 I-P-FD-008-H115 I-P-FD-006-H20 20210034 - Snubber Extension Tube Bent 1-P-FD-006-H21 4.3 Piping Weld Inspections All field welds on the 20" HPCI exhaust lines shown on construction fabrication drawing (Ref 7.5 and 7.6) were magnetic particle tested. All welds were found satisfactory. 5 Support Observation Analysis 5.1 Tandem snubber test failure (I -P-FD-006-H ISA and B) The snubbers on the HPCI steam side piping systems are manufactured by Lisega. The snubbers are Lisega Part Number3O72. The tandem pair of HPCI snubbers (HIFD P-FD-006-HO0 5(A)&(B)) were being testing in compliance with the IST Snubber program per procedures SH.RA-ST.ZZ-0105(Q) and NC.DE-TS.ZZ-3067(Q) to verify Technical Specification 3/4.7.5 requirements. For the A snubber, initial testing for running drag was successful with 1/2" per minute rate. The tension lock up and bleed test was then performed. The snubber locked at 107% of rated load. The compression lock up and bleed test reached 60.8 %, and then the load dropped. Upon opening the snubber the distance tube and circlip were both deformed. The B snubber failed similarly with tension reaching 106% and compression 10.3%. The same components were damaged. An outline drawing and parts list for this snubber is in Attachment C. These snubbers are on their fifth refueling cycle and this snubber pair has not been tested since the design change from PSA mechanical type snubber to Lisega type snubbers in RF07. Past IST visual examinations (completed every 36 months and last performed in RF1O) have not revealed any degradation at this location. No visual degradation was noted during this inspection until physically tested. Page 6 of 9
H-l-FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF12 Revisiun 0 An apparent cause evaluation is being performed in Condition Report 70042341. This apparent cause will address possible water hammer modes and snubber failure assessment. The failed snubbers were returned to Lisega for evaluation and testing. Based on Lisega's examination it appears that the reservoir poppet valve was stuck open. This allows the reservoir to fill solid, fully compressing the reservoir spring and loading the distance ring and circlip. This is a compression loading of the snubber. Lisega has postulated that the snubbers would have been able to perform in a Seismic event and that the testing method on the snubber test machine exaggerated the poppet problem to damage the reservoir snap ring. Lisega is continuing their analysis and have not yet provided a written report. 5.2 Snubber as found setting not per design (I-P-FD-006-H22) Design detail drawing (Ref. 7.7) calls for the snubber setting to be 2 1/2", the as found setting for this outage was 5 3/8". This would be a significant change in the position of the snubber. Additional research of inspection notes by the snubber program manager show the condition has existed since the Lisega snubber was installed. This will be documented in his disposition of the NUCR associated with 20210035. Confirming this are the engineering walkdowns that carefully examined the verticality of the valve this snubber supports. Also the pipe clamps on either side of the valve were examined. There is no misalignment of the struts on these clamps and no scratch marks on the pipe at the clamps. The clear conclusion is that the pipe and valve did not rotate. The engineering walkdown observations are included in Attachment A. 5.3 Strut misaligned 15 to 20 degrees (1-P-FD-006-H04) Walkdown by engineering indicated less than 4 degree from vertical. This offset is within construction tolerence. Originator of notification has been requested to complete Condition Report confirming he agrees with engineering assessment. 5.4 Snubber Extension Tube Bent (I-P-FD-006-H20) Although a bowed support is a possible indicator of overload due to an axial load. A lateral load causing the deformation appears more likely since adjacent supports and components show no evidence of high load, the snubber tested satisfactory in RF12 expanded inspection, and the extension tube is 7/8" diameter - a susceptible to damage size if climbed on or hung from. This is a congested area with frequent valve work-5.5 Spring Can Movement larger than design (I-P-FD-006-HOl) Scraping between the indicator and can indicates that movement from 1/4 inch to 3/8 inch may have occurred. The design movement on the hanger drawing is 1/8 inch per the hanger drawing. Paint scrapes between the indicator and can are not a reliable indicator of piping movement. This hanger is adjacent to the HPCI turbine. The indication could be a result of normal operational loads from the turbine operation, disassembly of pipe support during maintenance, original installation of hanger, or disconnecting the HPCI piping from the turbine exhaust. This observation cannot be used to support or refute the possibility of water hammer in the system. Page 7 of 9
H-l-FD-CEE-l 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF12 Revision 0 6 Conclusions and Recommendations Evaluation of the snubber failures and inspection observations reveals there is no conclusive evidence that a waterhammer event has occurred in the HPCI Turbine Exhaust line to the Torus. All inspections point to a structurally sound piping system that has not experienced loads that would displace the line, rotate pipe clamps, damage component, or overstress the piping. The following recommendations should be implemented to complete the validation of the conclusion of this evaluation
- 1. Lisega Inc.'s final failure analysis report must be received and confinned as matching their preliminary input.
- 2. Completion of NUCR associated with 20210035, Snubber as- found setting not per design.
- 3. Completion of NUCR associated with 20210440, Strut misaligned
- 4. Confirrn that the rupture disks tested satisfactory
- 5. Complete inspection of wall penetration bellows, 20213732
- 6. Complete assessment of snubber extension tube lateral capacity
- 7. Evaluate extended HPCI run entering R12 and assess impact on snubbers
- 8. Confirm maintenance on I-P-FD-006-HOI since last spring can painting 7 References 7.1 SH.RA-ST.ZZ-0105(Q) 7.2 NC.DE-TS.ZZ-3067(Q) 7.3 1-P-FD-01, Revision 24, System Isometric/ Reactor Building HPCI Turb. Supply and Exhaust 7.4 I-P-BC-06, Revision 12, System Isometric/ Reactor Building RHR Cross Connect Vacuum Breakers from Torus 7.5 1-P-FD-004, Revision 9, Fab. Iso HPCI Turb Supply & Exhaust Reactor Bldg, 7.6 1-P-FD-005, Revision 10, Fab Iso HPCI Turb Supply & Exhaust Reactor Bldg 7.7 1-P-FD-006-H22, Revision 1, & change from 4EO-3507, pkg 3, rev 0 8 Effects of Other-Teclinical Documents None 9 Attachments A. Engineering Walkdown Report, Pages Al to A2 B. Pipe Support Drawings, Cover Page and Pages B I to B50 C. Lisega Outline Drawings, Cl to C12 D. Causal Factor Evaluation for Pipe Support Observations, Pages Dl to D2 Page 8 of 9
H-1-FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports 12/11/04 Analysis of Reported Damage in RF12 Revision 0 10 Signatures Preparer Date: i:> l 4 £ I \. Peer Reviewer Date: I -I \-6 dr Independent Review ThA JieciL. Date: /Z-12-7cegel Approved B -N w .n- Date: /Z - /7--- 0 ) Page 9 of 9
H-I-FD-CEE-1879 Hope Creelk HPCI Exhaust Piping Supports 12/12/04 Analysis ok Reportcd Damaac in RFI2 Revision 0 Attachment A - Engineering Walkdown Report Inspection Date: December 4, 2004 Engineers: Alan Johnson, Civil Design Supervisor John Barkhamer, Civil Design Staff Engineer Inspection
Purpose:
Inspect the HPCI Turbine Exhaust Line from HPCI turbine to the suppression pool for evidence that would support or refute the reported damage attributed to waterhammer. Approach: Using the piping isometrics, detail pipe support drawings, and ISI observations as a guide, a hand over hand inspection of the piping was performed. Attributes that were carefully observed were pipe alignment, valve alignment, claunp alignment, scratches on piping that would indicate clamp and frame rotation or axial movement, position of insulation, crimping on metal insulation at tight clearance locations, attachment point wear mark, and attached cables and small piping. Results: Observations are in order of inspection from turbine to torus HPCI Turbine Room Hangers in the HPCI turbine room showed no evidence of large deflection. Hanger l-P-FD-006-H01 had less than 4 degree angle to vertical. Scaffolding was available at wall penetration. The adjacent support, 1-P-FD-006-H08 is a box frame that showed no scratches or other evidence of large deflections. The pipe as it penetrated the concrete wall was not concentric with the pipe sleeve. It was slightly north of center. All supports were satisfactory. Torus Room Torus support lower and upper pins near the HPCI exhaust torus penetration were inspected for signs of rotation. There was no evidence of pin extension, light surface corrosion at pin/support interface was unbroken, and dust on pins was undisturbed. The torus room concrete wall to HPCI piping bellows cover was slightly askew, only the outer convolution of the bellows could be seen, The pipe appears to have been installed a bit north of wall penetration sleeve center. Inspection of the bellows was not possible with cover plate in place. The first horizontal from wall penetration and vertical runs showed no evidence of movement. Two struts, l-P-FD-006-H 1 and H12 that provide lateral restraint on the vertical riser were aligned and showed no evidence of rotation. The next horizontal HPCI exhaust line run includes the exhaust line check valve and the isolation valve. There are 5 supports on this horizontal run. Most insulation was blanket and it allowed for pull back and close pipe inspection. Scaffold provided very good access for this length of pipe. Strut H13 adjacent to angle was straight and aligned. The H1I5 with tandem struts was reinstalled Page AI of A2
H-I -FD-CEE-I 879 Hope Creek HPC1 Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RFI2 Revision 0 with new snubbers. The frame, lugs, and pipe were examined for evidence of movement or loading. The support frame and lugs had no paint scratches, wear marks, dents, or other signs of loading that would indicate high load. The piping had no scrape or paint marks at the interface with the pipe. The struts on either side of the exhaust isolation valve were aligned correctly. Close cxamination of the clamp/pipe interface confirmed no rotation of the clamps. These clamps are very close to the isolation valve. The attachment cables to the valve operator were taut but showed no signs of stress. The valve orientation was vertical. Snubber H22, attached to the operator, was aligned. There was no evidence that this valve rotated due to piping movement that could account for the change in cold setting. Additionally the insulation on the pipe was in contact with an adjacent structure and showed no damage of evidence of large deflection The last pipe segments of the exhaust pipe to torus penetration were all satisfactory. The vacuum breaker line is a 3" line that includes two check valves, two motor operated valves, and a manual valve. The strut reported as bowed was not installed. The location of the strut was observed to be in a location that could be used for climbing. Page A2 of A2
H-1-FD-CEE-I 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Renortecl Damage in PSl 2 Revision 0 Attachment B: Pipe Support Drawings Attachment B Cover
R RESPONSIBLE FOR VERIFYING PEVISION, STATUS AN4D CHA1NGLS i-P-F[)-006-H001 001 5 PRINTED 20041202 I -ND __.-lr~ _:E- - IRT I-- - -- _I __ mul __ =L i... l~~~~~ r- __,,, __u-('l
-- -R2".) . - x -I,Oh T-4Th
-4*. _ .
-- 1I PO .nTVPt.(FEb-e 'i/F4,1 I- __-...... ._. - -____ O ruw ... _..
__ -3_- -l -1..--14 N,/" ~x..' /Ol~ Rddwl:' BT-.-...................- _____ _ _____ __ 2 -_. _Her Nut S _ Zt /pr W.ldk Eyt Nut 6 1 9 Thr" BoaltiplpvCItnp Provide Lock Nut , __ T _ 5' t A6~L C~L1 1 X6100fi S I _ W S 10X49X8'-9'/eY'LG. ___2 _ e 40 XB SFffEHR P-ATE P+/-EF P- 05S__ HOTE: N ALL MAT'L TO BE Sh-36 U.HT.O. __ STRESS ISO DATA POINT 1/9/ 4
\L 74 )
4: l(t) l T, (TX.t) 974 -4kYZJ W2 ___ MT~~ W5bx 5DDC~ 3:6-p IS5~'~F * (-L' 4!AilAI,> 114 pw04 F 1 Opa fmjl S'HALL Pf H4K /9I-P-FD-oo&-H0Z t-PI F '-B8 PI LOCATION PLAN 1NOTE AREA Za fRlo 1 J7'K V) I' I.HANCER 2.CODE::a CRITIMCA
. CLASS Z_
r . . C 3.SEISHIC CATEGOR' L 4.EZ~&r EEOV IA'EL
',.TD?5 klZ 'TO ~VDUO'TM$ . L. 4.r r (PIPE ROTATED MO)R AD . .4t PIPE OTATEDO8) HYDRO" LOAD cr8 ELEVATION A-A MAP NO.E z.L LOADACI2 ;I fJsUEtr~ ,W~gog ;£~g q'?LC. AJP /I4CoFf~ i.G4'N~
A 'o PlEv1 t: F(R P.5002J4k *6p MIR-. QUIVAN tA4 PM I V. A, IvII30 Na JtV BYIO E EW MtCH'K "LIC MVICE1 Ao ClAN uLCTmICc 10 1- PFh-Q1 QV HOM CMEEK GENERATING STATION lEF WE C 7 PM~t&2MTl STEEL01-°-l1 F1T, 5UPOMT ?EAGOTO D l DG, ln No. DRAWINGNO. irEv. APCG SYSTEM TUMNE 5TEAM 10OSS r-P FD--OO -i (Q) 6
AND CHANGES sc-p RESPONSIBLE FOP VERIFYING REVISION, STATUS WG 1-P-FD-006-H004 001 3 PRINTED 20041202 I
-S~O DATA POINI H4d,
( , g;C3f 5>^-W/j¢Z -B
,&, R fyt4--V 1
g/w5s /A'Ju-7RF
.rF r.Z -- a=
II II ( AIF I LOCATION PLAN I. AREA Z3 /V I NDT ES:
- 1. HANGER 2 CODE 5f2..c LAt CRITICAL Z
- 5S 3. SE1514tIC CATEGORY /
iflf: MAIXgO1f/M 1OAD Tr .6TS Juyaooss ELEVATION A-A FY *t BsOW
- soo5.
800 000 MARY NO _-_D-_______ Ft V DATEj Pt V I I O N I IBY BY 1HKI ;SDLENG ISTr 4 '1J "CLiC SERVICE ELECTRICAD MSU Co-l I I-P/_D 01 aril HOF CREEK GENERATINC SrATION REF. -p _p-3I "3&. 12
& DWGS.
Os
. . SA Fts~rSTE EL _ _/
PIPE GUPPORT.- REACTOR BLE 0 o NO. ORAWING NO REV.
,Dr y*{ 8 H /- P-fZ 2 -$D2 -/104'Q_) ./ !-i
STATUS AND CHANGES .I[> RESPONSIBLE FOR VERIFYING REVISION, qJG 1-P-FD-006-HOO6 001 5 PRINTED 2004120-2 ITEM ! o. I rlAfT I I N t I I- - . __ t PIPE 3 STEEL CO?65X3 -1AS17'7 I __9.1
.I .
RE~0ISIBE FOR RE~SoWSIlBLE ERFYING REVISION, OR VERIO11rlT> 0410 STATUS AND CHANGES 1PD-M l06-1-Hl08 001 4 PRINTED 20041202 j i . . _ . . . ITEW. NO ART SI
!ZE t
f K KEUD ND DESCAIPTION 1 1 We iclxm Bea A _th__ _____._ ZGxcr'?i- "Z62C6. 3 1 _ _& /x x 2? Co " /6. (.SEE ELEVATION A-A) 4 3. 141Yex/t07Z&,Rod 7'./. W/ COA'7r-10s -HA& _ __. 5 IZ He;: Nut 6 J -1r / Werdless Eve Nit 7 . .. O' Three Bolt Pipe Clamp Provide LOCKc Out.
.R ___ M'IA&F SUPPoAT1 7YAFB'LA%2A _
_____ _7A1 _evCtx2S5o .- ;rpp. -RAW-1 aNiOTE: BOLT & NUTT AT'L FOR CLAMP - A-307 6R.B . 1_ MAT'L T0 BE SA-36 U.N.0. I.._AL _ L& / 4 (t, '7 7 b f A-LOCATION PLAN AREA 231RIO 4 t \,EL 65 144ti NOTES
- 1. HANGER CRITICAL 9XlIT* US- TT 2.CDDE SEC.M cLAss 3.SEISMIC CATEGORY /
- 4. DO A'o AtRO'de TRA V-L
-STDPJ PR/OR TO Hl'DRo rfEr HYDRO LOtn . t ELEVATION AA LOAD_ __
lot MA-K /-FD-o 6-H8
- t5f g:<D~~ M2 ~ - 4°
- SSUEDJ F~M Ixbb /AB&i4 E55,. CA' X I/V CORPOR W D .82t a{ -
MA BLICUM 2EtCTRE"ICA W C4XAS! 00I so 1 50f ° 2/9 HOPECREEK GENERATING STATION0 REF, plPE cO 4 6 // FV.7 S. I f 2 UW Ts DWGS. 5E
.SA'N FRAWh: STEEL C06_ lfV tN Q PIPE SUPPORT REACTOR BD6 l UNO. DRAWING NO. REV.
I11 IC
-a v'!
i>iC/ 5 YS746i/ 7OR&5A/E 57X/4 7Z85l f- O 4 6 9 Irrs-
.ER RESPONSIBLE FOR VERIFYI14G pEVISIC'NI, STATUS A14D CHANGES ANG 1-F-FD-006-H0ll 001 1 PRINTED 7'0041202 ITEM tART 5'IE No HEo0o No OESCRFPTION 1'I- e' .577?u7I I I-3EC.770NV 8-8 wT
; 1 LOCATION PLAN AREA 20/B//
NOTE b 1.I IAN CER CRITICAIL
,20'PfP 2.DDE SECT X CIASS 2 3.SEISMIC :ATEGORY I H
0 f-C A , Co
.a ELEVATION A.A U) (LATER4L ?E5,-'//')
PIE v I s I o N S
~t:Ctv~ct ELECTRIC cAJ0otAIv GM HOP CMEEK GENERATING STATIDt RE F. IPE kS. tI1&U-P72 2
WGS. STE C-0702-1 NO.REV. PIPE SUPPORT 7R~ICoR BSLDG JOB NO. l DRAWING NO. iREV. i RPC/ RR's S,- ,,>tSM IoL35 /-P-FD-0o6-iff (co I
/
ml~a . ;_ - ---- - - .. .. L ---
A1ND CHANGES
~ER P?0S1q,, FOR VIERIFYIN'G REVISION. STATUS 2
t 1 -PFD-006-H01
- 001 1 PRIN4TED 200C4 102 ITEM NO tFART SIZE NO YIEWD e NOEO J--L-i2 . T $WAYETRU -_ -. ___ _ta___________
171 PLArJ 5c'g-4 VIE4 - E pTI A-A 1_ ELEVATION AA N , ,,T-1 V 'J-*7 Z'1JidTE)
,so i- -Fn I0a PIPL, P-z0-U -/
slLEmC-0702- I/17. / AC:V.2
- I ORANVING NO . Rl V / - P -FD -0. 7D-,,./2 (0. J
_ ,r . -A _ r P r & ,
= ~ ~ ~ ~ _tL-,<zp. ~ ~ ~ ~ =: ~ ~ ~. ~ ~ ~ ~ ^ . __,____ ...............
ER RESPONSIBLE FOR VERIFY114G R-EVISION, STATUS AiLu CHANULb r'G I-P-FD-006-H012 002) 1 PRINTED 20041202 A r / 7jv/C ,
$? /737: - 4 ' I fa I -,O. C*>pt r - .- _
ELBE'P 4- I ij- IIv '4. 1 i 1 CEiv 34'.5" , III I I, E & e f D I , L_ = = _II g
,I ~
_ <___1- __ SEC/IVN e-MARK N0. /I- '*oob- /2 A. -YE-= T- / - I <- I I rtuV 0XITl 3% 1 v I SI 0 N a ,Bymrqs PU"LIC L!RVICE ELECTRIC AND GAS COMPAIJY HOPE CREEK GENERATING STATION REF. PI_ ol is 2 UNLIS &SHFA~w TEE' o70Z - /r A',Piz PIPE SUPPORT BLDG -?g*cIo s5NO. DRAWING NO REV. BLDG.i6~/WT-_____ PIPEc
'y>Ct SUPPORTE rc/.ea/m.- sa<) f 10 855 -- 4 6(&.4 { ) /
a:~d - *7t P7
3ER RESPON4SIBLE FOP VERIFYING REVISION, STATUS AND CHANliES NC 1-P-FD-006-H013 001 6 PRII'!TED 20041202 TEA RNO rAT stz. i0Aolo P. 1tI'TO 40 Y"rAT'L J I 2 I j'6 SWAY STRUT ASSY, O.D. PIPE 20 _ ___-- W=. f'-4tLOAD t - _ _ 1- - _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .___ _ _ I I/8X,//9X @4W(FLF w 1rifTc'vwT u___. ____I_5'x S x3 /zr" A4A1LE Cti P.5 V L 42 - fX72)7-12 -/ ° 2 7r. __ _ .. 2 _ Wl'X72X (FIFLD CtAT TO SLWIT)
-7 2 _ ~~'X'/ 4'14 F.X iC ____
A
\_
8 _ 3Xp "X SY2 'X I- H" Wg A W4-W-5156"X 5"Ay l' -2Y2" _ .
*NOTE: ALL MAT'L TO BE SA-36 U.N.O. *STRESS I S( DATA PnfiNT ht3 to-Sp Ros C- (3/-68 (8 S4
( r. 7.. i7ZI .f itQ _, WeSLD klvuU LOCATION PLAN AREA 20/,&/f
*Ty_ 4~j N OTE I . IIAN(CER CRI TI CAl. -F v2.CODE%6- : c, Cl.ASS 2 .1 LpfES) 1 .SEISMI EC rA 7:V 7 7..; ;I ,lV. P ks J WVTO#+/-AUr WI I, _ - I - I- - -
v Iw - :>:>- vI,-7 4. -C.o>td &b 3tC 7_1 Z4:1, ffi o DETAIL r HYDRO LOAD ELEVATION A A ( V/$e'rCA4I. jgA/AT R l4x l-w-Cx6-113 i,,S4 1pri,I3P C _tz^wfge-&-0A1CfZn tifI oe- l A nrtv _I_ fE E 5mEp p'FCR.#F-/15.3-Ft v I 5 I 0 ts S 0Y BY ftH'K A ii kR% PMLStVtl ELECTAIC AN H01'CT EEK GENEIATI4G STATION GAS COWAXY REF.
,so PIPE 1f zj2D..
hEG Ol 7,&tE,41g1 W IA 2 uATZ DWGS. T-e o2- S47/ X'1nw ,g SAN FU~IJC tSCO E IEELCL2O. ,L..8700.V. '5 PIPE SUPPORT REACTOR BLDG. JO NO. DRAWING NO. iREV. 0-0oo6 -,<z I C,
+ "PCI/ 7'RB UPiPLY VEX-u57r IO955 / p 4-.
Z., Syr / 6= 2 P. 4I44 i - - '--" l
-- --. ' .4 - - .. r -I .. -0 -
SER RESPONSiBLE FOR VERIFYING REVISION, STATUS AND CHANGES WG 1-P-FD-036-H0I 13 002 6 PRIN4TED 2'.041202 PlAN 8 -6 m p-o;oB 'V1 to T/S. EL 9952 34 1/ - -k 2'r~ FF) r- _i- I L - -- - j
~~13 -,1,t i I v i-FD-oo6-,q13 "Tr-' IT, 55'-I-P.IFD-°G§l MAFA~ NV. '-kiEV I- . >vWs. P -o;S2 6ZE:C!710 5Ce- -P-E32- r .5 IEN I ! VI I I SaB___-_ . ='K r PU L!C &ERVICE ELECRIC AND GAS COMPANY RE 5O HOPE CREEK GENERATING STATION OWES. PIP-NOS. I L 2 UNITS SAN TEE PIPE SUPPORTREAC6oT EBLDG. -B NO. DRAWING NO. REV.
tl/PG1 / .fiPLyzt/$7 10 855 /p FD-00 -/-/43( &
-. . .. 2 _r 2 1.1 - -1 .-- . !=-- r-&;r'j f.;: z~.g Z:,_: -,i';;Z ,- , 7._ 1
RESPONSIBLE FOP VERIFYING REVISIOI'N, STATUS AND CHAN:3ES 1-P-FD-0C16-H014 001 2 PRINTED 20041202 _C __ . nZE sc
.. o T __
IW '- 2/a'3 LCAD -z(5E TABLE BLV>k; _ 35i t 2o'" 0.0. STIPP C-LAMPw- igf OLT .- _ TS 8 - - L - 'A 4 - T'SIxx V 1 Y2L L St#cPor 7Ž7?-f ;;Jt',T) s 1-; TCI % V2 *-2.' .I _ (b _ T5So: ( ^Y S -
.7 I TS. - I *,-, LG 7, _7SgsSx/tfI_ VZZ JtXIf Ho 7-0 r~V/7-) _
8 _ Trs IOlo r v'i 1G 4 fi-rr- t Ire, atJ 9 2 _ fPYo 8 1 Z &2 sL-10 (2 _ x' I o'/z x' 'i o'z L4Ct STRESO. PAOB. fjo.a-Q l- . &D ____,14=-l :284 (3 )-r~-x
\L. B- / }. LOCATION PLAN AREA 20 /rII NOTE 1..IIANCER CRITICAl.
20" pPI 2.CDDE SEcr El Cl.ASS 2-
\ J 3.SEISMIC CATEnORY I
__ _-_ __ *,~ FORCE WT. A l UAsET R t
- MEZ. St i ULTO F. 1 I U'PS72 T98A I o D )
ELEVhTION A A -. , R-. ,-/-. (.6 rt-WEtsr RS-rRpAIIrJ XRIgo - FD-00b-H1 nCV lM_0/SFSP FDw rSIAM pt F L of ot4,7 I) 17&" Alt -- II-L WJ G4=-." Mc I I SW t t
/NCOYI FCX?/iogEiy 18 l FFh1I!#O gAr 10AAf I tw IBl I PL K;1F1YtCXELtcK MM MU CO WXX l SYS ISO 1S DO 6r0 "3ft CREEK GENERATING STATIOI REF. 1=
STEEC-070 2-iS.'r I RE' 12 PIPE SUPPORT *RNOC) JREBCTR DRAWING NO I REV ICc '8( IJU ' 5 H15. Io5F i-HPC 7JP6 XHUS UF>L4~
- r. ____- _ .t.. ..
AlNDID CHANGES
- EP RESPONSIBLE FOR VERIFY IING REvISIONA, STALUS 4 002 I 2 PRINTED 20041202
\'Gi lP-FD-O5c-HO' .. - ."vu I Nso. -l OMEtTIt A:o 176'42 1AAFr.NC).
A~rl PLPAN E-E4 I..F:D-oOi-t4I oI... -F I
- Xv , , , -. 5'm .,
A14D CHAJAK;LS EREPRESPONSIBLE FOR VERIFYING REVISIOlN, STATUS 1 '1G i-P-FD-006-H0 4 003 2 PRI4NE.D 20041202 _, . rz. i
. ;! dwUwl 4 11V
- ER PESPONSIBLE FOR VERIFYING REVISION, STATLIS AND CHANGES VC. 1-P-FD-006-H015 001 3 PRINTED 20041202 ITEWd l j FIG. s / *; ,$,If T3O
. Ct NO. . , _
IG R MEEC=. MK Ge- OK2 6,eI-AP: Ae 7_G__ W- =4-olvI 1", ACC.EA-E.RATIO -VA Mb. 'L.- _l E&A R O7-T.j \WATOWT Re7 ln _ .. 641t4i-O G L. 4 t L 2~ IAZ - 7 __ x 4YCUT 1 x1 -6 -To ___ _ ZZ p : ,ML' xO -G lq-- -4 ____l
.L4 _ Y 0 -- /IIL C.
WmiE-: ALL MAI'L.70 !75 5(o WQ. .0. STRESS PflOU.No.31 (Q) .& Dy.P.114
'v MATCH PQCFDWA00 5WgrFw5G LOCATION PLAN AREA 20/011 NOTE 1 .IIANGER CRITICht.
2 . CODE TIE:_ C I.ASS5 3.SuISMic FAT EORY r
- 4. 1INTAbLL4- 091EMTAoK o f-M4 I ' ALL NOT rXcP O TL Col 1°0M vcO ICAL IW POEtt tE FAULTEi 1 .
LY. F---o M, LI IC 3,ooc4I "I'% s gwl.Pe-R APv *rrjYIC5 -TPa1 ELEVAT1OH A A mA~mK tso, I -FP-00(a-Hlrq
. . . . .. =
al~tl~d2-Z 7 t- 7 ro} JAI ZrtIVArvr AAIAt I IA. n
- f. e5, A , I I- --.Irl I W. 1-4I ae-I'V. -1 -I-fl LZWkll lll-H;v PO~R HWAL. ,Ina T8b511-tNiE--F Wh-Al.- lK zIV 115 R
__34 SI P E m sEPI' tt4coKR o7 (7 W-RcN 4CP-l MrO 5- lG 62 lo Poi otL3'" 0 IlwoTTo t .5 -
"xv arrtl rz I Y. I I a to 3 CIAI YtlgX 0 tGtS:
RF0c aw= asvctc ACt;Y4 C77I Sy SYIso EV. Io IZPF-I ta _O_. YtXeCnEK QEWErMTW ST^l.Z n EF -P PE SUPPORT ZEACT LOG o Dr.AWING NO REV H P C _I -__ _ _ _ _ __ ) 3 _ _ _ ' f4T . I 2
- S ~ -m__ _ ______-
SER R.ESPONISIE E FOR VERIFYIN4G REVISTOIC)1,I, STATUS AND CHAI itES WG 1-F-FD-0C)6-H015 002 3 PRINTED 20041202 OT E: CL)'CLEAZAiJCr- I, ,R;) BE MAW-
-%At'ws1 DETVV::-A' IT=-VA-20 Z I .. ,6^b _ l f 1 we e, -t, . 4- = = _ .... _ __~ _
- Z. E= ~, r _ - et -' n _. _
. -'By" .@ _ }n 11'~-t :. s-
nKEal CHANGE5E DO'CUM-ENT 1I4TE_ 20041210 PART 2 - MODIFICATION MD TESTING, SECTION 5.0 MD NO.: H 35 FORM WC.DE-WB.WZ-0003-7 CHANGE NO.: 4EOC-3507 240DIF1CkTION DOCUMENT COVER SHEET PACY1AGE 1N0.: 03 CP REV. NO.: 0 PAGE 14O. 1 REV. NO. 0 DOCUMENT CHANGED: DWG# 1-P-FD-006-H015 Rev. 3 SHT/VOL NO.: 001 (PROVIDE TYPE, NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE IMDE: Replace ex:isting snubber with LISEGA Hydraulic Snubber as detailed below : Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin 1-P-FD-006-HOJSA PSA0035 307256RE1 30-1003-1501 30-1003-150 New Cold New Hot New Flp SruReod Set (CS) set (BS) Strokeud Removed (in.) (in.) (in.) (Y / N) ( IN) N/A N/A 5.88 Y N Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "1Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL 0j ISSUE M. C. Chang 8-1-97 T. Nickerson 8.12-97 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE MCRs Page 1
'.. luclear N Common Page 2 of 3 Rev. 6 (Page 1 and 3 contains the Instructions) go 5
HAIJGE' DOCLIMENT (N::D '_1I1iED 2004 1210 PI.RT 2 - 110DIFICKTION Em TESTING, SECTION 5. 0 MD NO.: H 3 6 P'OR1 NC.DE-W.BP.ZZ-0003-7 CHA-uNGE NO.: 4E0-T3507 MODIFICATION DOCUMENtn COVER SREET PACKA.GE NO.: 03 CP REV. NO.: 0 I PAGE NO. 1 PIEV. 10. 0 DOCUMENT CAINGED: DWGfi l-P-FD-006-H015 Rev. 3 SHT/VOL NO.: 00. (PROVIDE TYPE, NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE MADE: Replace existing snubber with LISEGA hydraulic Snubber as detailed below: Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin I Stud /Pin 1-P-FD-006-H0l5B PSA0035 307256PRE1 30-1003-1501 30-1003-150 New Cold New Hot New Flip Shroud Removed (in.) On.) (in.) (Y / N) (Y IN) N/A N/A 15.88 YN Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL 0 j ISSUE M. C. Chang 8-1-97 T. Nickerson 8-12-97 REV. REVISION PREPARED PEER REVIEW 1INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE 1_CRs Page 1
,.WI. Nuclear Colmon Page 2 of 3 Rev. 6 .(Page . and 3 contains the Instructions)
ANMD CHANGES RER REsPoNSIBLE FOR VERIFYIG REVISINO1, STATUS WiG 1-P-FD-006-H01 7 001 I PRI14TED 20041202 _, __S rnrw HO FIG. DESCRIPTION+ No I p i;EC' NO. 2 11 STRESS PRO8. NDoC- i -ffIw) , & D.P 74 J' LE _2 *77* of I LD>CATION PLAN AfIEAio/51 NOTE ( CEF, I 1.HiANWIER CRITICAl. 2.CDDE SrC.T ¶L C1.ASS 2 3.SEISMIC CATEr.ORY I ELEVATION A A ( EA - K E V I I*0 o 2 Wu14 B'tH'KPE -ENGE S INMUC SltMcM tLfECTXIc C:& CWAAY sYs ISO 1froo c~ HVI CREEK GENERATING SITAIO REF. P.tE rnwr~ I gm I1 2 LMcT VRE SUPPRT REACTOR BLDG HPCt TUWZ(Q. SUPP'.-' < EKHUST
-AP ki7
NIGES -ER RESPCONSIBLE FOR VERIFYING REVISION, STATUS A14D CHA VG i-P-FM-006-H017 002 1 HRINTED 204 1202 I
1ER RESPONSIBLE FOR VERIFYING REVISIOll, SlAIUS Al4D CHA14UE-VG 1-F-FD-O06-H018 001 2 PRINTED 20041202 9 ITEM4 I14 FIG.M I - - -fYI r 140. I/ 1/4 l.kT 'L
-.- M0+4 GA::SQOA-RESi&..WITH OUTr Cj..fAMP ___
LOD-7 !y ,W -L /15,ACCELERATIOTN __02__ 2 I~ 43 S A o.D. S-t I=PF C-LAM f'WITH LI - oL-r ___
'34 - T VYJ~ LC:
L&/b SEE. O- TAEl- 4 I______ NO0TE: ALL MAT'L TO BE SA-35 L.; STRESS PROB. NO. N.O. C 1892
-Q'/ ,, . - a rq P.
B/S Z S7FID Lj jL. - 2-I F.)F K QrTEEL. LclcAl'o.4 LOCATtON PLAN AREA,2o /al~ I NOTE I . HANCE P CRITICAL. 2.CWDE&I -:CUr ¶l CL.ASS 2 I 3.SEISMI C flhTEGORY I
- 4. INiSTr ITEM 1 SHALL Not ELEVATION AE
~ ~Lf J E01-Isozao i/poa#j 'A io'I' lij ( VEgZT I r-At- GrQ LAt'36E V-) /i2\W't(leAJr-V? R' FIAL(R CALC. 4 W1CoRP?.faY42ri riav loTEI AIt V I SOI e 5 N
r __J PUBLIC SERVICE ELECTRIC AND GAS COMPANY REF PIPE- _~.. - -- 7 HOPE CREEK GENERATING STATION DWGS C- BI_~ SA? fNAA'C0
-I _ _ .
PIFRE SUP-PORT. REACTOR BLDG. X38 NO ORAW.ING NC) REV C 10855 .4-R-D-&oo-Nr (i 2r IHPCI TUL15 SLJPPL-f '4, E7CHALItST
.1. -
iSEp RESPONSIBLE FOR VERIFYING REVISION, SIAIUU AND UHAli.-L sWG i-P-FD-006-H01 002 2 PRINTED 20041202 I 5 E^F Er sF- P s 6 11 I ,- H rr~ljse 4.O' _
,IExK-r r=P-5
- Tt P 1[7, e-EL. 56'. S" .
(UEF=.) r ! I
! J STEEL LOC PLAN 51/z4r I DE:TAI L-1 MARK N0. W-F D-o0o -H I8 YS I[so PUBIC IERVICC LECTtIC IND GIS COWAAY HOPE CREEK GENERATING STATION REF.
DWGS. Nos. I 5; 2 WITS DRAWING NO. P.EV. PIPE SUPPORT REACTOR BLDG. HPCI SUPPLI Ef4IHAUSST 2_ TUZS 4 l - P- F= D -O 6o(- H15 fo),
NIlEC; CHAI.I^E DOC:UIMEI4T II ;TE) C204 110 PKRT 2 - 11ODIFICKTION }JD TESTING, SECTION 5.0 MD ND.: H 337 FORM N:.BE-WB.Z-0003-7 CHANGE NO.: 4E0-3507 110DIrICz-.TION DOCUMEhT COVER SHEET PACKAGE NO.: 03 C? REV. NO.: 0 PAGE NO. i 1 REV. NO. 0 DOCUMENT CHANGED: DWG# 1-P-FD-006-4101B Rev. 2 SHT/VOL 1NO.: 001 (PROVIDE TYPE, NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE tgDE: Replace existing snubber with LISEGA Hydraulic Snubber as detailed below : Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin l-P-FD-006-H018 PSA035 307256RE1 30-1003-150 30-1025-150,L=12 New Cold New Hot New Flip Shroud Removed Set (CS) Set (HS) Stroke F h Remove (in.) On.) (in.) (YIN) (Y /N) N/A j N/A 58 Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and -Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL l /&4 A 0 ISSUE LM. C. Chang 97 T.Nickerson 971 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO._
SUMMARY
BY & DATE & DATE MCRs Page 1
\w_ Nuclear Common Page 2 of 3 Rev. 6 (Page 1 and 3 containo the Instructions) ,- ?I
- ER RESPONSIBLE FOR VERIFYING REVISION, '
- IAlUS ANU UHAN`SA,
'VG l-P-FD-006-H019 001 3 PRINTED 20',41202 I li t won Klo...I 1c. lO IlsA L. MECIFT I qN ._ _~ LI Z ErI I T Pl-< Co1lep, PIV4 2 1405 I r 4 '-'L6 G wt-AstfH lb" re t CeI1 oUIT i.I ILD At _ "'i NUT 5 2-290 1" WF-LuE.ss T, -iNU
- 4 Dlo 49 Y9 8'-9" C- c Lt. SEE S&L. LOC.. PLP%!CLIT 7oE , J'T ArJD
_ _ £LEv'rlojA ____ 3 Awo 8 8 __- P. 4ibST tFFwEC P-ATE, POvioaE lr4ZT^LL PER rD>FTAIL P_05SES (BILL o= MAT'L COT. OI stir 2 oF 2 cC.`6 G rr;1 I 4 , 1'-5 STRESSPROBl. NO.c- B51(,N% @) ,& 3,P, Y19
@ 0zt>2 "j jR /' (Ty H ci p)
I *nls EL. ___91_ 9
- m> A' F1XSTd4 -A- oAv 1 1 I lLOCATION PLAN
_ PIPE FAIRICATO .f AREA 201/ r II NOTE I.I. HANG~ER CRITICAL N , I" 2.CDDE SECT T; Cl.ASS 2 F- 3.SEISH[L rATE(ORY I n v (55 2I t1 n9 4g M4.P.OVPIE 7>H^oRYscippogT 0 I-IIwo
'- '1I' Thfn /Y'.
IW 7'_o3/' ( t ELi HYDRO a:1 20" PtPe LOAD0 //,6Z/ ELEVATION AA LOAD
'ir cl) MARK NO I-F--OO-HiS 0PVp~}
Ft( l LTr I VIs laisoo Fi5 'i~ BY s t:'K - EN HalE CREEK GENERAT)O SATF OlEF. ,s 1 &2 I WT9 IWGS ST(ECD7O3l .&T t j PIPE SUPPORT REACTOR R.G)OHNO DRAWING NO REV HPC) fLJRB SUPPL'q EYwAU l-P-Ft)Tlor~,.I ()2
'I 1I,>11 s& f >Wl tU lBO;
SER RESPONSIBLE FrD VERIFY'ING REVIS1IQH. STATUS AND CHANGLS WG 1-P-FD-006-H019 002 3 PRINTED 20041202 61__ F. , ,, O1.0 NCC. DESCQIPTIOWN DEQD W'. L 9 I _ 200. SPECIAL RtSCE CLACP C C_- _ _ Pec ITTCrL>;tJvJlELL sTss REr1r 6A-412b- __ _ _ & Pdc~rEL Ou(.insTr No. 10S ______-l2-to R (" f6 - 1' _ _ ______ NOTE: ALL MAT'L TO E SA.-36 U.N.O '
.1. .., Q "7,,
I !£ 00c Cn P .~' illrs X sf 1°55
.CJ-'-i /PLAN B-(6 &l (LUG ORIENTATION) /Ai 151" 30' STEEL LOC PLAN - ~MARK HQD. I -F D 0b -H 19
- --5Lcs 51,'J. 0s ?1 Ol t -t
_I , _ IiIa S. ByRKMIIN~ MJAILIC SERVCE ELECTRIC ANO GAS CDM AR'Y HOPE CREEK GENERATING STATION OWiS.PIPE P. wxS. I a 2 UNITS SA F nSTE~m -- .- PIPE SUPPORT REACTOR BLDG. 3040. DRAWING NO. 6EV. Hpc -LJF13SupL4~ X~kS_(. 10855 IPF2- F2 AV,_ ,,. _ .. .. ,,rvfL
SER RESPONSIBLE FOR VERIFYING REVISION. STAT.-US AND CHAHG:LtL .; 1-P-FD-006-H022 001 1 PRINTED 20041202 I. FL 40 FPIG. [tOro W . V W i . ** I 'L ___RAc__ T. r, - P., Vt ' KIP' _
-A ' IL _ _E_-_'v - 5 4 . R L-5 G CziEtr D cur
- U ) a\ I c I - 'hV (£ ' '~7 5 LCCT(F1rLD CLJT rf /Jd:CEs5SR )
.IC . - PaŽ;^: rHR PLt (SeFE T. 3. FTELDCUr, TWTrG
___ fI/7TH47H6 nA ErEM OF 7-WE _____. ( FILL OF sAATtRI-l crjt. ' b-tT. 2 oF r ) NOTE ALL MATL TO B F 3SSA-36 U4 0 I MIhESrP~AOB.ND 3 DP _ I? . ION r- 6 t It
-. j -
I-8W trNI
. I 'I tG Gh I - I .'i At I7L' -7II , -r-tr @ f ~~PIsPEgsatt c SY ' I VALIt4 V F- ,lO7XA - 0_ LOCATION PLAN L _<pp . -c1eN tF -NOTE -20DE 5- C-AS5 . xYX0 U) 3.5UISM5FC ('ATEr;ORYI 1 e, L!- j/D, v10 I /..F- \
10 CE ,'-'-' ) e 7 F )R~~~~CEgi0k~dW ID _
"-4 . . . 55 (I %,.rYLlt4DRCAL WALL_ \ HYD RAO LOAD Ic: 'E.x.lI s. T F ELEVATION A A LOAD - 'TYP TL MARAK NO I- sn S Li) (F -N:5Wu SUB)35EW t'fr5.5s UUD fiot F~f%11L 5T/'RtF55 CtALC-..VNEI /N1AICR._)/ lv pj. lo.Kp-c R tsud Cz f a.Z F,I v . ., o 0,I llf-fi BY I RsitL-Gl j
HOPI CREEK OE"EKATlNC rTATICJ AJF F Fir( . . .-.. .. _ s I- I1& 2 ur4Ty i l OWOS < - ¢ , I, t , r IPE SUPPR P1efoiz BLDG. JOB ND DRAWING HO0 REV LHFCI -ftuJ 5uPPL"' a bxAtJTf la855 LI [-.F SFo J 0F-2D-w)/ 50- I -OF 2 t V.r .NJ "P4 11" .. . _;,ml
SIATUS AND CHACk.HL 'ER RESPONSIBLE FOR VERIFYINIG REVISION, 20041202 JUG 1-P-FD-006-H022 002 1 PRINTED I W . f0Vlal, 0.
- ANIEUI CHA1TC'E DOr,-liY.l FINr11ECD 2100412;10 PAKRT 2 - MODIFICKTION PAND TESTING, SECTION 5.0 FIvD 14 : H 38 FORM 14C.DE-WTB.ZZ-0003-7 CHANGE 14N.: 4EO-2-5G7 MODIFICKTION DOC'UEFT COVER SHEET PACK.GE NO.: 03 CP.REV. NO.: 0 PAGE NO. 1 REV. NO. 0 DOCUMENT CHANGED: DWG# I-P-FD-006-H022 Rev. 1 SHT/VOL I10O.: 001 (PROVIDE TYPE, NUMBER AND REV. THAT CHANGE IS BASED ON)
ACTUALG CmANGE TO BE INADE: Replace'eni:sting snubber with LISEGA lydraulic Snubber as detailed below : _ Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin l-P-FD-006-H022 PSA0003 305256P?1 30-1003-075 30-1003-075 New Cold New Hot New Fl_ Shroud Removed Set (CS) set (HS) Stroke Flp SruReod (in.) (in.1n__ _) (Y / N_ (Y /N) N/A N/A 5.B8 I . N Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL 0 ISSUE M.C. Chang 8-1-97 IT. Nickerson 8-12-97 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER NO.
SUMMARY
BY & DATE & DATE MCRs T Page 1 a'i Nuclear Common Page 2 of 3 Rev. 6 (Page 1 and 3 contains the Instructions)
SER RESPONSIBLE FOR VERIFYING REVISION, STATU3 AND CHANGES Wc3 1-P-FD-008- H003 001 5 PRINTED 20041202 IEtu weo FIG. Of SCA. toN No0 P U 0 Nt).
- W4 .x 13 >C S~' C. LE N,C-) T lsr E-LV/ A_____ . 3 ~ ~2. ) (. 22/ Y-8 *%4' 7 L. & _ _ _
4 .2 . ..-L 2' . '- VY- >L Tie'/
%9 .L
_____ rn E; ALL _(VJT'LTQ SE5A-Y,MUq-4p
- - - ~~~~~~STU = PROM . N . 4 3 ) \ , D P i1 Q LD Is-) O .'~s z~7 C I2.7~ OO - 7d Vd S~eS L 6-r I LO(-
L _ _ _ _ _ _ A / oX Z 3/ b0 LOZATION PLAN 0 44 OTEAREA 20/6 / EL 9o- - c.11 e . HAN CER CRITICAL.
- . 2 ) D4:22, CLL SS F 3.SEISMIC CATEGORY ~ i T'" Foai ,4-IWI C -FA" L SC-I A P ~ ~~ e £ I Y S O IB IA Y N G PULX*alli= uI.DrIMIC A= CWW catwJ3v} SYS ISO - -0 -3r 143K CMEEIK GEJ$-IATW02 STXTIMO PAEF. PIPE-SAN FAAUdZC SEEL C,-
PPE SUMDORT - vz EACT ,-, aLDG. .33 NO. DrAwimG No. A I PEV. An,
%$ ( t J~ C T / A C.t cS - !0655 (t-e-F-p-c o& --Ho3 C~ r,.i TI' or 3
31-R RESPONISIBLE FOR VERIFYING REVISION, STATUS AND CHANGES N,5 1-P-FD-00&-H003 002 5 PRINTED 20041202 al,, Ig. 187 i°' (E)~IBS) Ga_ i -1l ;-T0 I >. (- C
'rrEzC.T~r - -3I I a I2" -
I
;mLL, rv, A-A y A mWf.,
SE-CM. G -~ LN 1
- 0 WIZZ L Q f DS I MARK NO, I-F-2_c2-IIQ3 REV. Pt I_ Y~'OSR_._P ~
v.t>AreJ P ttl v s o ., s ___I BENG~ PUMLICB ERVICE ELECTRIC AND GA COMPANY ,7 HOPECREEK OENERATING STATION REF ko. 1 b 2 UNITS Ft D ITEEi C-07 5-1 g PIPE SUPPORT BLDG. NO. DRAWING I40. REV. F-K CfOSS-GONHfeT VA-CLUM 10855 I (e) 15Kw'tsmF0ls 0
SER RESPO14SIBLE FOR VERIFYING REVISION, STATUS AND CHANGLS WG 1-P-FD-OSS-H304 001 6 PRIIITED 20041202 ITEM NO NO E REO'o FIG. NO._ SIZE __DEs____AT_ _ _ J T L_ _ _ _
/ /
- t. _ is/ *25 95o
/&4gT s7~d gg2GsLr *Kt ^//z -45 soIA?--/ $-r'J'e,# zo'/
A_ f 7^/539g8S~f- A\'" 3 r i i 3 9i 1? _ _ _ _
/2 ff f. / ~~_ 13'- 'tI x0tAC L ICsLlv F5Mo'E IgE0LA)
TO CU
. 4 / 105 3 j WA4 !J< L 1t iq,( FEl -CtJT1O 51T) £f.t SLt6 OC g Q . - 0
____ S Al L MAfL 10 fiE GA-5(p§ U.-j.QO __ _ __ _ STPES- PROB. No. ,_
,8tv19* \SRt RO . D ,f . "
ft'RP -- f \N e t >,v s7,90 i Te-1 LOCATION PLAN Sf-t gAR EA0/El/] NOTE
#E .3- 54fllS;of 1. HANCER CRITICAL, E$,3@ 0 t2,DE 2 --CI) 5egC-2. AS S 2 NEO .} A 5O 3.SEISMIC CATErORY / -lye=4. FIlm.%= To CUT~ 1Q LA-r-Iv.tJ-r . HYDROLOA
_L IAIN Az-A LOAD rA L s MA .I Nsis PO 2 rcvOaETIE Pt IE V Il t PI._ _____ __ _ _ _ L IM CE-TEW ILK & tt~l CtAfZ 1> p "tTREF. i SYSPIPE. 1 57 7 I
~~~~~~~~W S.stE07- . _ IL PEPf $UPPORT 2kICI RLDG. "F NO. - F -
DRAWING NO. IREV. 424, cEaB2 COMMaZr V6cUtA4q 1Z raeus zeozA 10855 I-P-FD O -A/104 (Q) & L2_'I
.ER RESP04NSIBLE FOR VERIFYIN4G REVISION, STATUS AIJD CHANGES
-v1G i-P-FD-003-H005 001 5 PRINTED 2'0041202 HO I NOlFIG . llZ .. ' DE5CRtt T10 *E ............. AT ' L .1 R_ FO. _sze__
____ 4 ~~STROI(E.&Y "00 r~PIPE._____ LOAD , ,S ~HS ' Mt{ZSgEERATIONQ HL =.02p (Z57-fiz7 7
' h4ATL PER B&PV. CMDE SECT. 111 2 -. 45 (~x ~~x 6i C-C LZFIVsIr4 (£si=5,7L/ Z~~./w
_ . 4/, XLI-N X *-C6' r -) STRESS POB. No. x0:7' 1 HtI. / ._ ____ __.__._,_____ ___ __ e AyI 7 .srur Yc2.J t4 V oF. fT)E M 7O7.
. / zteojr AOR M65.Lf OF I _ _ _ _ _ // LOCATION PLAN i AREA 2CI 4i I NOTE 1.ANnER CRITICAL L( 2.C DE3K, CI.ASS 2 3.SEISMJC CATErORY L
- 4. FIIav 1ro cwr muL. . bo ,wr LA r774 q47l S1- L2/,i HYDRO LOAD flEV T 5 -; StO tt S lOA D PFL: SU"Cr ELECrihJC APO MWS ¢: WY _ __i__SYSISO_______
MM:KaEEK: GBEfiERTr 5T~n0 EIF. R1 PIKE PM I1t 2 L44 S^W fF0NM DeS.F~, E o 7o3 -./ s-tr, J &4e IE SUPPORT 2e.7- m No. ro DRAWING NO. l*EV. a/qw ceo55-cQam -cr * ; 5 ~ ~K ~2 A 7 ~ , L/ _ _ _ _ _ _ _ _ _ _ _ _ _
-.ER RESPONSIBLE FOR VERIFYING REVISION, STATUS AND CHANSES MG 1-P-FD-008-H005 002 5 PRINTED 20041202 ITEM NO. aIG. SIZE OESCRIPrTiO,
. reo NO._ .L_. ____ ______ _____ 7 LLIEL. E.G85414&
_____ _ . ___ _- _ = ... _ . -..... ___ 5~crlotvA - A JE 5HT. / F
,5SE $Q~7.- 0J =6 Pi E I sI C N 5E PMLIC:E1FVlCE ELECTRIC AND MU~COM-A ~ Y$IO HPE CREEK GENERATING STATION REF. PIPE_________ . 2 UNITS _ "DWGS.
SA)4AJ%5F OSTEEL tueIC5~WcE3 7LEI;CAH G UY. 6 r PIPESUFZF.T I C7D2 BLDG J38140. DRAWING No. REV.
/et CROSS - C0A.A/ECr 1 /4 1085 S p Ae~ E /Ve~i~i 7zI~ s _ I /' cNs-OBY CH L .t.- *r~ - _ .
27e!-~n... _, :.o rtq~.w s :<s~-;:t
JSER RESPONSIBLE FOR VERIFYING REVISION, STATUS AND CHANGES )WG 1-P-FD-OOS-H1005 003 5 PRINTED 20041202 ITEll ,1 NO. FIG. SIZE DESCRIPTION l - N. REDI N,0 _--NO-- . __ ___ _ ,~__ _ __ l
.=4 =~~ __-n
_55c I .AI TI. REVAT1fEVI&I OtisEN __ L CERVir ISO._ -ELECTFICAHOGA.bAY HOPE CREEK GENERATING STATMO _________flip,____ ___.___ _._ . ._.__TEEI PI SUPPO~RT ;edC7e SLOG. N. DRIAWING U0NPt.v A/ 2. &, o sS - CO, VA/3-E7 V4C UJ&/4
~ŽE~5~1t24 7&eI$1055 I P-FD -0081/4'17056&2)
S~t...c~-J~b^.ua_.wu~P~l+-olt\J.z .et^...................... .. _.............. ,y...
!EII':ED)CHA4GE r£I.Cl-IJME1JT II4TED 20CI41213 PART 2 - MODIFICATION AN@D TESTING., SECTION 5.0 MD NO.: H 85 FORM NC.DE-WKB.ZZ-0003-7 CHAN4GE NO.: 4EO-3507 HODIFICATIO14 DOCU=EIT COVER SKEEET PACKAGE NO.: 03 CP REV. NO.: 0 PAGE NO. 1 REV. NO. 0 DOCUMENT CHANGED: DWG# 1-P-FD-008-HODS Rev. 5 SHT/VOL NO.: 001 (PROVIDE TYPE, NUJMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHI4.NGE TO BE MADE: Replace existing snubber with LISEGA Hydraulic Snubber as detailed below : Henger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin l-P-ElD-008-H005 PSA0001 303656RC1 30-1003-050 30-1025-050,L=5.5 New Cold New Hot Ne'" Fip SruReod Set (CS) Set (HS) Strokeud Removed (in.) (in.) (in.). (YIN) (Y IN) 1.8 1.74 4 N N Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL 0 ISSUE M. C.Chang 8-]-97 T. Nicherson 8-12-97 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE MCRs Page 1 x- Nuclear Conlon Page 2 of 3 Rev. 6 (Page 1 and 3 contains the Instructions)
- ER RESPONSIBLE FOR VERIFYN11G REVISION, STATUS AND cHANUL;L VG 1-P-FD-008-H006 001 3 PRINTED 20041202
>. WEG'D Nto.c l tT L I E1 G 's Vq,*dB~tadi^n w/Pl ¢*1 co)<
CtG 2 1 '/28" d wl 5 TOE - _ ___ _rr _- __, , 4 4 N t- _ _ _ I I2 '12 X 2 '- O t1 "TDE . E 2 ft9 1.2' 1~C Ey Nut 7 1 S DOGLE &hPipeCL-np F ____T 9 ,_ W/2X72X 7w{c ' .txEtEVATION -c AA) - tO 2. - _,x -. t5 P-?rac P ___ _ _- NOTE: ALL KT'L TO BE SA-36 U.N.o. ___ _
* ,7 'r[8 I - 7X. - J 1 I SIRESS PROB. 1NCt.
__ a) 3-4 /I - I 99- *7J 7r /Ž-PT 7 (TTO LI
'i .
- W36Y3oo "Q:_. _
r R~~fFAMING DETAILf/ - EXIS EE DWG P OSD2( - MT _. _ )
.- LOCATION PLAN *2 t~.O~4M iPEAREA20J/911 1.HANCER CRITICAL W36X T -
- 6 Z .2CODESEOCV21 CLASS _
P )7r'iv4PTE 7 / 3 .SE qlzg 1'SHC CATEGORY E36Sr ='& RZ= <?s852. EL. 84'- Ii 6 " PIPE S w STEEL LOC PLAN T ~HYDR UYD( I 11 PIPE LOAD .AAL+/- L
;i ELEVATION A-A MARK NO. I-FP -oo--Ao6 1 \\/ssu ffop' CIN 4 . d rkl j CSALC 14/ 7~OFJp OL. 1JJ,0.
Ft VjATE RE V IU I O IB 7 c,6-ft ptuLi. 8mv='t kl J X= CJ CDWLuY SYr IS o XO= C4EEZ GMERATWG STAMN REF. PIPE PE ts;.t a 2 FtT DWGS. PIPE SUPPORTREAGTOR BLDG. JONO. DRAWING §0. REV. R.HARCR05-COVVECT WC4s 1/f553 REA KER5 FROM _O/U _p( 4 RT- 657S
JSEP RESPONSIBLE FOR VERIFYING RE\3ION, SIATUS A14D CHAINUU' IWG I-P-FD-008-H007 0CI1 6 PRI1NTED 20041202
,.c ITEM N 'REO'Q FIG. 1 SIZE DESCRIP1 ION T . a
_11 _ t59 50 -,A /240
'A / _ 5/ZE 3 PiA-e 6 2 <'P/,ds ASf _uP,~ ~#
i- -- .~' 7 fr1cC4-'A /C4 O 5-/=CA AzZ45 7o, _I_ 34-z 2 AS 5~O Xv 7 3/a -l 3/a 3X' 7 r 7e',.4 ~-- _ __ .- - _ --- I - - ---- NOTE. ALL MAT'L TO BE SA-36 U.N.0. _ __ __ _4-ETIREsSs ROBA4O. N & Dp H7
/. .. ibT W12 x1ig IR
[/SEL (9, 8_ EgiS'r Lot2x7Z 3'.2;l wtl-p-F -9 V4 NFLq -
., ~ II m s 3 X UGR. Lo.
L OCAIlU4 PLAN 7 N I 1t 2i EC-T. 13-/ 3 AREA 20/B/I NOTE i.'IIANrEP CfRI 1 I CAT . 2.CDDE5E;-.7I (;.rA5s 2 Lb- 3 .51:1 SM 1c r'I(t;(.RY _ t $ 8~~~4 l -PF-°Uo E-1 M A I. I r~l tE624 A D Si4-7 A-Sgf ELEVATION A.A V I S 377Z7 S l.D _t_ F_ 1 -Jsc MARK NO
~sIw S BY H'K E( -L FD-008 -tO7
- !r,
- 5 ENG W
F)
=Lr- StlV= EL*CtC AQ COM 0JY SYS ISO Lj-BC-06 REVJ' t HWE CMEEK CENERATING STAXN (TREF. PIPE *' -. &= I a 2 r .1 DWGS. STEE C- 080-/5 RE PIPE SUPPORTREACTORBDG. JOB NO DRAWING NO. REV R.HLR. CROSS-CONNECT 4CUVM 16B355 I_-P-FD-o08-8107(Q) 6 BFEIKER.S FRL,/4 TORUS_ _ _ _ _ _ _ _ _
JSER RESPONSIBLE FOR VERIFYIIc; REVISOI1I4, SIAIUS ANU CHAN'ITL ,WG I-P-FD-008-H0O8 001 3 PRINTED 20041202 I 0L lz -r r 47 U p..
-4.
tL) t L t 1Ib LL tIUr V L Ir I II1' Vi NP _,
,-I Ai U. A%4Li Ml Vn'k7 viG 1-P-FT--005-H009 001 4 PRINTED 20041202 ,{. 1:1G. l St2E - OESC tFST'L 1 1 i 51'5! i /
lAY STRUT ASSY, O.D. _PE 1 - *_i . * - 0. 0. _ _ _ _ _ _ _ _
.~ _ .**-..... .ol -16e t g;, 5 </,
ov 240-0141 _ _6# ~.ef4'~/-? __ I I I STRESSPROB.?IO.COO--Q & D.P. NOe I\I-c*- a 917 )+/-.co)
-x T Z (t.C02A) .ELc-I'/p LOCATIDN PLAN tt- 6 U"PIPE AREA2 O/8/i CIZ )30 NOTE (a Ii'or,5' 1.HANCER CRITICAL.
2 .GDE SEC. T ClASS 2 3.SEISMIC CATECORY / I xa m r4 m N
;i-ELEVATION A.A
( EAST- W6EST REs7-RA/NT) MARK NO I-FD -0086-o9 I AT tha5M Uc To W0c9. CUM cursYstso Ad-5tuILT
"'*t v I it I o Fv.0.
5Y I- P- BC-Q-6 RCV.L H;Oft CMEEr 08oCtATO TAM TE FIER I. I ,t1 WCS. P SEUPpOR fTeAC oKBLDQ btNO. DRAWING NO. REV. I HR CR°OSS-GOc14tCT VACUUM S I-P-FD50D--qHO?(Q V I .. E611\ERS ~ F- 0Ml 10 P(Z __ _ __ _ _ __ _ _ _
jSER RESPONSIBLE FOR VERIFYING REVISION, SIAIUS A1LD UHANCr4G~ )W'J 1-P-FD-OO8-HO13 001 1 PRINTED 20041202 14=Lr-=r rll-IF .----.-,M - . ..-
ISER PESPONSIBLE FOR VERIFYING FRE\'iSIOINI, STATUS A14D CHAN-GES )'WG 1-P-FD-0CC-HJ013 002 1 PRINTED 203412912 6flTID A -
.Je.
MARK NO. I-2-6f_ 6NF I ,£2, 1-4gp I BY HKEI m ) Vvn' F Iv ral ^ g V I I I o __I JLIC I ER VICE ELECTRIC AND GAS CDM.ANY Ko P IPE HOPE CREEK GENERATING STATIDN it. - I A 2LWITS 1 F STEEI PIPE SUPPORT rAc-r BLDG., JOB U. DRAWING NO. REV. IRZI 66SS CDiECT CVAUV 10855 IP r -
-I -1,c--- r.v 'lklvs-,= - - -44z-X, -
r7v=; -, - - . F
. ;,I. =mlliUil, ,I,.
SER HL'-I't)sL0IBLL HJP VLEIFYIiH'Jj VLVIU\. bAIUL ANU LtAIAN'oL vvG 1-P-F[I-0O8-HCO14 001 2 PRINTED 2004',202 ItEhw . -L G. t ItE __ _ _ _ __ _ _ _ _ __ _ _ _ _ __ _ _ _ _ _ L _ _ _ _
)
__ 7 > Roe 7W/ .. 1A 2 o 51Z- 3 45 ___e_-CAET I
; I 1 -
2~x 1 A x/.44715"LG,.
. (ro .lrr 5u A\27 7 /A"LX/O' A/ . Giu/ k~
I - W&iS./"/ ___ . /' p X x 0- L 6' D,/ ) 6137Sf)5C F 7/#YA2x (5.E" A- C5- g') fe1 i Z"_~TE~t
- j PLA /4L Le14Z evo,C)^SA-3C W~!o' XoAd./Cb'?Et 04654- .#,4 f t1 cT UD<L~,N/JZDcr0/
rL,-A S~ESSF06 OU PA(*. : Mpg,
. + U) 0 . p*-.'.
1-k&," i .. .
/ fK I /a) .56 DE61AIL I rCt Ki 3>
5../ v/ 1 f-4 \ v- Fo-j9 1 -x
" T--t II 15, °F- %vg( I I& ILOCATION PLAN AREA q9/B/
W.
'EL.B-/O,_-A I*TE 1.11ANG.ER CRITICAl.
Yofo 2.CDDE -ri7jI CI.ASS 2 PIPE VA LVF'.SE:IT" CATECORV = 9
-S RoTATECD 'N D*OADD -
mAR No 1-F-.) -o A- H 14 AtV AU PI V I 0 PeS BY b'KSENG
? BY _ K.__ E T __
L U = UIL=:= A Et ~ft l ISSYS ISO/- P C-°S(Y MOM CMEEt MRATP STATM REF. PE
- 2. ia= OWGSI 5
STEU C->o7- :!'v.-
-PE SUPPMT R6ACT? . DeR0 MAWING NO. REV 2HR cCROsS- CONIV6.CT VA CuUI4 10855 I-P-FC,-008-H/4 1 2H1; SIPT. OF ,
JSER RESPcONSIBLE FOR \VERIFYING REVISI01N, STATUS AND CHAN4G7ES )WG 1-P-FD-00-H014 002 2 PRINTED 20041202 IV,S1ppe .. ( 11LVSE ZV X( Sr- CYLIWPRICAJL WALL STiEEL LocATIOM PLAQ MARK NO. /-F) -00'-w11 l4leS/T. / oF 3 Ii5t~iS o~gl
- v. AIsJ ^ v, s3 *o VA* ll BY 1H'KOES1LPVENG PLILIC CERVICEELECTRIC AND GCLCOWANY ISO KOWE CREEI: GENERATING STATION REF. PIPE-NOS. 1 & 2 UNITS M F tTEE' PIPE SUPPORT ECr,. BLDG. DRAWING NO. N AHR CPOS5 - Co,4 rY YAC UtLh 10855 (-P- F0 - coo-H 24-BsRFAeEPts F;i9m -frotS ____5__£ 2 or 3
1SER RES PON&IBLE FOR VERIFYIIAv REVISION4, STATUS AND CHANGE r )WG' 1-,:-FC,-O'-HDA 003 2 PPIIIED 2C0041202_ i
'-TA C, W9,1Z 5X7'Wge A IU- 62Z 7' V V.' $a cjl, (MI,4. 2 Ir oc -)
DE TAIL I I Of 7A/ I . LE7,41/- _ SeCT B3- B I . - . . . . - . -. . . - T 's>1j JEc SqEF- / oF .3 -- i ",Ss I Jv1 i-r ! r.II mo@v rP It C v *e I C W.V IBY '< mouc m#t cwpvc "=C. omoa= NOR M GVERATM4 ZTATM RFEF. PUt.-. -
-IF 1 L2U=Tt i I
_~~¶ . _ PF' SUPORT REACTOR BLDG. 10 85. DF.A " ,V% v.< CM V.
,eHR R - COvIECT VACUL/lh 10855
- 1A< 5 pe7r1 eus )-F-,CC) -0 06ef14 2
- 2. ,- .L r
SEfsRt' Ht-O'Iow--LL tD1I' VLHIETINU H'LVIltIN, ;ilAIV' ANU UhANML:J O/G l-p-mD-oos-H015 0C01 2 G-041202 20li. _O FI. . ME:...-.. .,,9,
=4-" STR KF. W'ADDITIONAL REAR r BR~~ - SyC. I.U LO - -uzG, I
I1L V r-- OrV 3 _ 75 bwS)55-!L 8 F1CU tT 7V $Ul I ' z 7- 4 x.V4s{/..X ?3- CLT Tt7 5411 7)Zz~s; Ps I r4tf 7"12 "X2t'- os __-T- camz 7-~/^,"/,q 7,1a rS! sy0 a3 - lr-ws '7 -,-0 /5 72 f vm SrE Prim. uwg@C- OP. D, H4 v 7 76-3e 1 I f ,- __= /1 ,6@ Lr-ATION PLAN
. ^fT g W s @ L zARtEAD 1611 Ct6t.HIANGEP I CRITICAL.
5JEX002 tF/VY3.SEISMFC t1< CA\T£rORY J
>1Ir .8/rnotZlFORC WT . 16s +NRM Ib CZ ma-tSl HYDRO tOAD 2oc> SECTIDIV - -- D MARK N VI5f: t~R rCH-2 P-74.1 &Col$P~-VFC4.
t 3 2rsfi1m rcpat ^t **ct" P'JBY '-MDNHGK~-- p' '-_- "=CfT= sAlmfPzC-16 com wv sysis OVOKE rEEK QMATM2 TTATM~f REF. pipe C= t L2 Vx= lOwl-AS SEt. C - 0f To{25 RFNSE VJ-P0; R6WfOR, ,LG 1: .0c NO. I' DKAW'ING NO. I REV. z P.H.I CR. 55 - CO vMCE C a flAMIf(0855 f-P-PD -006- HI.F.Fa)I AegRF" Sp~rkW4 -rpts I_. _ ^ . LLo I _.A , e .11111".Mltllm
-mazy 9 1 Z ' '. -m-?= .. -. ir-f -z' 'fXomow-O.:-N ;C12 imapel-containedionithis.mic
5 1 NLG
-P-FtUi' 'I lE t v002Fit 2M., rLNVf IZ2U0, 412A I2 1,4U ItA L:
fJG:l-
!-FO-O -HO 15 00 RITD20420 I.
J it 4 Ii I I 11 i
.~@ Ii 2 5T wn z I=
p~*U
%91IL~rA u ho VWA CLW G.* - .- - -A.. C _ * ;~~;.. 1 ~l~c~t~ti tt raiicrofilme - na'ouol tismir
- SER RESPONS&IBLE FOR VEFIFYING-. RLVISIO'.'IAlUS ANLD UHAN',Lt
- WG 1-P-Fi-008-HO15 003 2 PRINTED 2004120^G
. A_
_/ . 1 NO. AFVPc .P S& 770,'V IrVA' 7 / /37S_ S/4"Y 7" J,'ICML L/-8VLT' 4 - -" B- 7__16_ _ C 7/13,,5it. D 2 7 112" i-v//IEX AuT5 8 / _ X 3 i
. 5 : / _ // 2 - _ 7'4x 3 11 O- 3 117 12 - 6 X 12X- Z F6.FLP L/T 70 ) _O /3 / _ 73 SE x 4'12 "X/'-8" Z _____ ._ /4 / - '"l/l x1'-2 "Zile . S: /1 / _ Q g'A4 6(iclFZ0 7D _A _ J _el 7_) *.- __ L. .4T4 _ _ ___ -"~mz fZ 6'Q -f.fRS - - _ __ z~~ __ __St S.,
I'
.r. .5 MARK NO. /-F-12-//
Am BY H'K EOOVENGP' KM LIC ERVICE ELECTRIC OkN GA. CDW-"Y RE________PIPE____ H-Df-E CREEKR,~AR - GENERATING /y, cS(T1044DWGS R- CROSJ -MEC
, _RA.1rNG
___EV O,. PIPE SUPPORT REA~CTOR BLDG. JOB 1O DAIN0O.RV
=-
- - .. -.~ - . I ___).q~JSS
= _ -c'7.H i .> = 2 ' .'a--cloliv l V V'ir, 4;^ =-j !V'Mi -
AwW; 4, -1 wAi. j.4i
,MED CHAN.GE DOCU4ENT I, :TED 2OG4,_210 PART 2 - MODIFICKTION 1fND TESTING, SUCTION 5.0 MD NO. : H 86 FORMt NC.Dl-WB-.ZZ-0003-7 CHAL4GE NO.: 4EO-3507 MODIFICATION DOCUMENT COVrER SHEET PACKAGE NO.: 03 CP REV. 1O0.: 0 PAGE NO. l REV. NO. DOCUMENT CHANGED: DWGV 1-P-FD-008-H015 Rev. 2 SHT/VOL NO.: 001 (PROVIDE TYPE, IUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE MADE: Replace ei:isting snubber with LISEGA Eydraulic Snubber as detailed below : Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin l-P-FD-008-HOlSA PSA0001 303B56RC1 30-1D03-050 30-1003-050 New Cold New Hot New Fip SruReod Set (CS) Set (HS) Stroke lp Shroud Removed (in.) (in.) (in.) ( /IN)1(IN) 1.6 1.91 4 N N Construction / DOC. Updater Note: 1
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL 0 I ISSUE M. C.Chang 8-1-97 T. Nickerson 8-12-97 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE MICRs Page 1 Nuclear Common Page 2 of 3 Revs. 6 (Page 1 and 3 contains the Instructions)
AIAKED CHnNGE DOCVUMENIT HilJrED 20-04 1210 PART 2 - MODIFICATION AND TESTING, SECTION 5.0 MD NO.: H 67 FORM NC.DE-WB. AZ-00C3-7 CHANGE NO.: 4EO-3507 MIODIFICKTION DOCMtIET COVER SREET PACKkGE NO.: 03 CP REV. NO.: 0 PAGE NIO. 1 REV. NO. 0 DOCUMENT CHANGED: DWC-# 1-P-FD-008-H015 Rev. 2 SHT/VOL NO.: 001 (PROVIDE TYPE, NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE IASDE: Replace eXisting snubber with LISEGA. Hydraulic Snubber as detailed below : Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud I Pin I-P-FD-008-H015B PSA0001 303856RC1 l30-1003-0501 30-1003-050 New Cold New Hot New Flip Shroud Removed Set (CS) Set (iS) Stroke a / AIN N) 1.6 1.91 4 N N Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL .1 0 ISSUE M. C. ChAng-1-97 T.Nicl~crson B-12-97l REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO. SUMMAPRY BY & DATE & DATE MCRs __ Page 1 1~. Nuclear Common Page 2 of 3 Rev. 6 (Page 1 and 3 contains the Instructions)
ISER RESPOWSIBLE FOR VEPIFYING REVISION, STATUS AND CHANGES WG l-P-FD-006-H020 001 4 PRINTED 20041202 .. . ITEL' hO
'o 5 IG lZE - - DEScrUVTION MAT' L 110 "Ea 0 HO. - __T ___
1 1 307 7 ,/9 MECHANICAL-SHOCK-ARRESTOR.
... ___ = PIPE O.D. - -V2. ,STROKE. 2. ______ - - / , iS ' MV3VT. = 4(" ? _ _ _ .____ I LOAD = -uL, W -8..4g ,__-_- - ACCELERATIOt'=.02g, MAVT'L
_-__ PFR P & PV, CUDE SECT8.11 _ 2 ____ TSG6G 6 X< /v 0- 4.S G'R.E (Ft-,curjcuA-_
.4 L._ _ .5._x i - _ _ _ _ _ _ _ _ _ _ _- _ __
No' 3LL1A ' 4 _ SA-36 1U __ _ __ _ NsoTES ALL. MAT'L To BE SA-36 IJ.N.O.___ __ _ . ST _E,PROB. - (. - _ _ -
---A STRESS PROS. N10.4&L 3-Q ,P D.P,.LJY 20 1 C.12q +/- Lo)
_t.f _ -'1-
* (t 14,W) 0- .a*<D>
Sk m IT _fE EL . LAr JJ % Ii
.I,. . t-1-1-\
LOCATION PLAN AREA2O/B/l
< I iNOTE 1 . IIhNER 'CRIT] C'Al.
- 2. 2mDE5ECTIT CL.ASS 2 3.SFJSMiC '.Iv-rI(lORY 1-
.. 4fL s '-' :L1Aa.4T QT L.. t T FOFME itl .4 c 1 I JI(CD ED FAtJ¶U ELEVATION A-A (E- w SAIL 265EJR 5) fM°I-FD-C~$-H20 v :L l.5AvPSME frV~k Fr->R.H-2i99 UTI It/
41A T MCv AyT
- R 1 V I 5 1aO I S BY KPE AN fUaLICtE ELEC*CA CA JY sys IlSO 1-P-B REV9 W`E (MEEK GENERAT)G STATKM P
____l_EF__ _ U e.ls 2 : F OlSTEEL fSRc It73s PIPE SUPPCRTREACTORBLDG. .B NO. DRAWING NO. REV. RJ-(R. CRo5S-CoNA'MECT VACU/ML// 5f0It f5 I--FZOO6--/2O(UJ9 4 BREAKER 7zU rtO
- /, .- -_---------- : .. - ",, 4rcg>q, 4- . t
JJKED' CHANIC.E DOCUMENiT 1IN4TE-D 20r041210 PORT 2 - MODIFICATION idX TESTING, SECTIOi 5.0 MD NO.: H 84 FORM NC.DE-WB.ZZ- 0003-7 CHANGE NO.: 4EO-3507 MODIFICATION DOCU1E Nr COVER SHEET PACKAGE NO.: 03 CP REV. NO.: 0 It I 1 li PAGE NO. 1 ou2/ REV. NO. '0 DOCfiriENT CHANGED: DWG# 1-P-FD-006-H020 Rev. 4 SHT//VOL NO.: 001 (PROVIDE TYPE; NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE MAfDE. Replace existing snubber with LISEGA Hydraulic Snubber as detailed below : Hanger Eristing Replaced by Neuw LISEGA Part no. No. Snubber Snubber Pin I Stud / Pin II-P-FD-006-020 IPSAO.50 301856PE2 l30-1003-0381 30-1025-038,L=4 New Cold New Hot New Flip Shroud Removed set (CS) Set (HS) Stroke (in.) (in.) (in.) (Y I N) (Y/N) N/A I/A 4 N N Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL 0 ISSUE M. C. Chang 8-1-97 T. Nickerson 8-12-97 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE MCRs Page 1
%-11 Nuclear Common Page 2 of 3 Rev. 6 (Page 1 and 3 contains the Instructions)
FK'SFlv)lUE~lSI1LL F()1K VfLHIrYIJ06 HLVl~l(N, 2:;1AIUSi ANL) CHANUI'S I-P-FCD-DL)6-H021 001 3 PR<INTED 2004120" l ,olANrD 5 tI_-E DEzrolr. ION 1,VT'lL _ -l ...
. fy * - iB Sway S trut A ssv., .$ e L EX&"
M Lo;ad-:- 5~v _VlT s4-t1 X ' c-c L!;. ('r! &f;V. A -A ,5r4. Loc, 1LAt) 4 _ t+13 4- 7T- 5 C - Ct. ,( SEEIFJrE--L Loc.---PlA). 7N~ 4tEALL MAT'L TO BE SA-36 U.N.O. G -~~s. NO Cof Rl1 S S I S DATA PO0 I NT -21 2
,,w~i,8'\IR te~s. i k.l +/-.,Di67 -x-' +/-2T& , \ . 9 J2) /F< t WeAa Af t ^:lI-MAXIO-TtN PLAN -lyfl -V' (-rP ) 1 1 - N)T ES-:
FJ8*1. HANGER CR IT ICmL t _ L I2. CCDDESEFCMLAU Z _t A 3. SEISMIlC CATEGOKRY I 4 4a5.p~~~T W 1i/5~g1Eg t+ Llrill0R UFE OPerATOR OE pD7A,-rD so° (FF1 3 RrA8 Irf PY01. D 2g Sr,6UL CU.PAA ELEVATION A-A 72-2S 1 01:5 1
, vcqrT/CAL - E-S-JRINT R ARKA NO. lFQ-o-2 nEtVlDATF r I v I It I o N a JBY : K E i ENG s ,_ p- c,' ' _eg%<. 7 "O H'E UkeEK GENERATING STATID l REF. ME JSA fm* rg. STEEL13/ , FPI PIPE s5urDORT REACT09, E3LD MEND. lDRAWsING NO. lRS lR~tRcRC2S~CarlgcqucIC)85 lIP-F&oCHZQ 616_e9 FRM 7oU it= Ibi.*
r_,w - c.....
, I ~ l - .1 .
H-1-FD-CEE-1879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF12 Revision 0 Attachment C: Lisega Snubber Outline Drawing JRA )4 A-Si -.-rm P"twe'"ST . prImei ,-rtc i,
-1 Rd 5 3Z; 1013 120rryJ Ut Div,",nd A V& -tM 4-,3(2, PU4 v (!2 ns ),--r.rrvrlt A 716 -Yk) 3U MCM 131 _WX5 Ircn SA IM rc
- CO 31AS VIn M
-"31, 0i mmiftor k, 0,96 X)f ffa 10 172 FIq 10igt !$ 141 sit M c 3114 on Sara& fS ;d-15#V IN1013 131 A 'M lu M10 XS fact'; a rtd i "if, 7 54 f.?-'# :-4,4p 0 (I-Was fU-,0Z:Ib, CIS 'U.*51 kywz:Vrf L-d 7vdaurq ir-A ;417S 2--ntrA -.4r--
1a Pt TY #M-09. VItcrI.-brcf 174 f 173 Mad qevb- go IN2 7fKi 1159 472,4 A.'Y Gey- civil Fr., f 1 _;CP2 V.-cc, ,Ze,Itrs tet 173.01 30 72 3 2 2 0 1 3 1) Z A e- -1, 3* I V LI 5 E la Fa EM T-; 1.1 AWO' I HAVtSion E.7-11 Page Cl of C12
H-1-FD-CEE-1879 Hope Creek HPC1 Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF12 Revision 0 r" V11M 'Os155t) I 112 f0v air C"Fwc I e, - 20;z man 2 vnm 0 ryhrom Fd to - ff4 A RI M-j CO 'SS A M-AM TA 72 fm 0 X- -!6 OS ;'If A, 117711)1I 4. 54 Y*c &fmave, atrie't In rl - t 3710 010 Pw V -6,2 -;Z-4 -. I. - SqM- C 0,0 31war4t. gry'Ya I- -t 2trrII III 17344 w4hikutrn. ,I;nlf* SA 'r. FG3 Et I 31% RMW cesworr 2J L-FQ6 D-,-OU;N-05,9 M75 fine rrty -,rtaf vat re $,-O 779 0 W. 1 rw!.,Tl-RN 13101i-!- W Ls wM VS f 'O- PrN 32 AAV ~cw J.-
,Clear -.'x rFd Owl-P M11,77* V, j 'T V LISIEGR Page C2 of C12
H-1I-FD-CEE-I1879 Hope Creek HPCI Exhaust Piping Supports 12112/04 Anal~ysis of Reported Damage in RF 12 Revkision 0
,L%
0 ,1;1.ett _!..A _a~ ,_ibev~S ta ................._o0~tw5_...... t1r;3~teSA
. *fi4~~~~~~~~~~~3r.ttq.l..........,-. --.-..... .-{f-2'.w_,t ~~~~~~~~~~o A
b
'.C.
f_._. i ] -o ~~ ts -- l .__.* twr tSe__*
.~~~~~~~~~~~~~~~~~~~~! -. Umttt it_ - fftt ;i,329**C 3_P___ J??,, _rn5JlvD i Rnn~~s~fnsr a.2_ fla~~~g.-vart 3 4,_ s.
t ; hed Sh e._4 tmrhto.y _
- F D- tl1111 irkt nV !^t6-*,n.
. tOz ! ; 7 l.1rlret...... I.___S@>{ez . t7.nit7. .... . _ss. ,t,i ( tr~P,, - ! * , s~~ (t74k ofw .8;.r. .....
_p-bl 0.0:I3CX_., _ _ .6-- _Wt t ~~~~~~~~~~C A E ',r.tre,,I
,[_ ¢,X, 0ti
_ l >>_r r ~~~~~~~~~~~~AYo .- 1e* ..... H d5fZSZ,_
-s _4 Jl i i-6¢ ... _I 1,,
__._~ j,_&. _.,& 5._ tI LI Kr ' Page C3 of C12
H-1-FD-CEE-1879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF12 Revision 0 327 f 4 -.Z' 72 t-T,FTO-- fUrivirpist6n I rM 0'69. IOf3f A 73' 140 37217 ?V;Z
!MCt in, T.",( )3irlf ithit AG F3. f4critt W, tnzi M.- MS 0: bmvJ "cm. .72M -Z__ 5-winrM 'etrive to" tc-istrudion.1m 61 rL-Dt ;*Xt 4 02W !Z53 r I SA It? TP 3N Q Pd XQ 15 foil MO ;C. e Si .qf 44 1417 t410S, cf--rvc rf"C' Z1, :YX-;-
f999 Gr 3Z Z0 3 0 7Z L I !S F- G A Page C4 of C12
H-1-FD-CEE-1879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF 12 RPv;t;nn 0 3 M4 -,'O77 A TX I $,.less 14 4 - 51,57 MV e ZlVarf prar-sq" (3t5"t) 47 "L WWI r U C&O CLF Mr-ml nit af z IM W. k t I St '!,P,) Z forr W. le M I I t bp
!Cru C2-m-i Po-, -rao 71 I 1410 1-91e's UT" 11440 13 190. I&S f63 270 .,k347,rp -IN rwr Ever SSA In Ms C1.11 b'd A 71k-",
22 -7 '-M V7 rvi Y;Ocrt) lit SA Iql 91-4 CLIJ -n; A - claV--ge- S:t e vT On C -Tor. S--. C,C.Yd. "an 4- v C IFRS Lbrwr P-- v be -f C y08-07 .13U iu GS .,ef -77 0 - F?2 CI _--cvl4nl. L15 IE IG R LWL rf.-e Page C5 of C12
14-1-FD-CEE-1879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damap-e in RF12 'Pt-11;c;nn II IALV c3n -d-7-L -- - - t N r 1518 .57ml- Cr 6 nm 1F'j L-M mA VIY!nN"Jvvriv TetvLy; Khstmoe 18 tmo;. - - 221 1
-Am St] mi - CTM 1_2910.
rold)nq 4Dof -etas I . :
-P21. to I ?".Fe ;ww""m M 3'rairl L trqla I t Ikt t rI :t'; tl) F 'ES IS I 15 Thin 76!5517 -Cs prkslcft ILISE'C-A IV.'Y .7;m le L 13 F ne 41 r0cl A C')cm I f 49 06.
j 22 0 2 FM VIL I 5 F- G AV Page C6 of C12
14-1-FD-CEE-1879 Hope Creek HPCI Exbaust Piping Supports 12/12/04 Analvsis of Renorted Darnape in RF 12 n (,2575 - 2 P. 1 ras S-ans LE i I an 6mbdiff lfhrMdrdv;'7 73 T cr USEGA ID?!4 hp
- .cn 1.,e I L tIF ..gfo r-rw7-j'v Stuckr MmNltps I nM 05,03. Su 72 .6 2 2 -0 3 0 7 2 AV Page C7 of C12
<Z. CD 4 14.-n tU (A -t I o ~
st 0 C ~ O nv 11. t'Jm A- m 3.3 3.5 3.7-3.2 C) Co 0 co CO 0 t ;C7/1 ~ ],pD _ IMCIn.Ot?-15SX0 7t5I',#~b 1Bd 72 _gYrtt 0 t'3 CD 1_ ' = I .........
- 7T,4k-,O-;~xS.........l*Wiw f74 I ?tr@ UK cn C0 Ij39ec25~,rug re~ wr ___________1
_ 21 3 ! IpI_ ___ __ ___ I
&bQqs:9t~rfit ' '=
13210-t6;~ __M U,__ 3 4 0F7-2
,- t.- II7 ? 7rII I3Z-7 P :4_ L 1 L-L....H
___1__ __ __ .*.H-. __ __ __ E - I '3 O. L3 - I_ I Ir~g& sCtufOvUCI, augr. 3 30 r2 .c I- #*O il I ______ I- O=-t T?:>7 I Ochfm-I Ala:mo .2.2401a 772 14o . rwss . I _____ eraa. 12J.?i4i i TurfJ _ _ l, 4_ L- Z -i g7X i 7.yC/4 _s aI,. /., l ..P11j ceorial 1 27t07
.1 2-a p , .,..vw....,.,, .. ,. l,
ID i-
. () t CD Li co I
t 3x 0 o0 Cj2 o
~ ~4.
0 0 0 .H
, is s 0Ii 5 ;77Li 1;77ipo, U6 TlOw7 ii viI.7' . JM.t v tLLS **' . ~ J a $ ~ L i 5z J L Vibr s ^1ignL!NL L2 ' . 'ier kI 1riLt -.
Chieni irkerc en ' j I . t ?r??.2QV SPCJa :cflfw de~ nr bri Is':r: C; Cl Wrtxpje~i;j -. ^ Ze~cji;s tr.
;v E 'ost.ec CNr. - Pac_______. ______ -- : :c. *trt - We° 1- W-e - C Uib£ .ftw FYsIu dD' reseroir 0 ."-Jr OIN r:I161 Specfltrkoibeni, 6u 5 rsvl 0lE .30 72.5_ VIS]rp , I ,.e:/t .d....... - tb IB.7 i D7ur I Nftnc i'1;?7 aaarbl. I I tir i n : fl ,*
S-7:1
, _ . v . . _
8:.2 i or- j I~ Ietvef§+
oO
---- n = i, U Z ;¢ CD. Q1 gcss;ni frurne de 45' Cf 14 00 umr42;e verset2z gt eidnei CD C D 6.1 - - . I- - ' - 0 0CO stz old 6.2 -
6-,
/r j.-. 'I I ' I
..) GQ CD 63 - 0 0 H- L
; . F. - !I C-)
miung 4 r9 CD tlJ
,VX? {9hzr', R"C f
_ ir I I . nI . I I 4 I O _s. O
, - I I I I I 'il Z -7 / .. fl*i II I. (O
- 5. -
Io~y 5; . : -t .. .
,,It I I i J - '4?
W
*J-fI-tg71- mi W77. ;J. *.fl9 I . I A I 3A224-4-C02 'to 'Hoom? I (rst. hcitysi.10 40,f 9. S,,,. ze;CAAV" gJ, Mr.
tevJf. . 4Ick , It :.-,HWoa J - lL^Hcr E- _ WOee autiob L -
,Lret.iHcr ______ _ _ f_ .Lt IOb L-manf ,,poI t:1,70 A=rOa,c:,nm f Vw ,sT- SChuf.- tzO;r, kna.01, {V I 76d .?0 72 . !
LISEISFI fPR, 20 72A I l'i,7,e I DVI:UM
. :cw,- _~~ 3 2 2f 3-4-2 d07 0021 1I -.t I d* , I P-u ~ - A.
--- (T) -, I > Z -3. 0 COD0 i r4 00C tI 'IO 0 M r-:
I t _ 'a. F ,5'(d2 CM tqC C2 0 t0-8.3 0 0i CA 0 0O
,A .v *t c . .
Yu. .wAes r.! *5b ~ §f;~tsM, n fi
'Ientncon;r¢ L ,,flcle cow 02tdet d- 2 . f1 5UfP- .. er2 D'§ VW °~S 2 7!9 S_ VPJ LIS E U R 3 a cr C",i7 ~ 2 f;wj'nrnj~ Name 5-1 3 4 E 5 Z 5 7;
H-I -FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF 12 Reviqionn 0 1-Rvk, - I
~.-- *,.F lr.
- 0LI-2 Page C12 of C12
H-1-FD-CEE-I 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Darnape in RF12 Revision 0 Attachment D Causal Factor Evaluation for Pipe Support Observations Possible Cause Existing Data Supporting Cause Data Required to Confirm Cause PExisting Data Refuting Cause Data Required to Disprove Cause Tandem snubber test failure (1- -FD-006-H15A & B) Water hammer overload from piping a Both snubbers failed in an damaging snubbers apparent overload condition
. Inspection of frame, pads, pins, and devises showed no evidence of impact, wear, or damage
- The piping support configuration on both sides of the damaged snubber precludes overload without damaging the adjacent supports. The adjacent supports have been inspected or examined and are satisfactory.
Hydraulic snubber test machine anomoly
- Previous and subsequent tests were satisfactory
- The replacement snubbers passed their test requirements Snubber internal active component
- Lisega tear down indicates . Evaluate extended HPCI run failure internal poppet sticking and a entering R12 and assess impact mechanism that permits failure on snubbers on test machine.
- There is no physical indication on piping or pipe support frame that suggests a high load on the snubber There is a cycle limit on the snubbers. Extended HPCI run entering R12 may have affected performance Snubber as found setting not pe design(1-P-FD-006-H22)
Error in data collection
- ISI records not complete
- ISI complete NUCR evaluation
- Some evidence in ISI records and establish condition at shows the snubber has been in installation 20210035 this condition since installation Disassembled and reinstalled with
- Pipe supports not always treated wrong setting with appropriate reverence during maintenance Significant rotation of piping and valve due to waterhamer
- The valve this snubber supports is vertical
- Adjacent struts and clamps do not show any evidence of rotation Page Dl of D2
H-l-FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Daamage in RF12 Revision 0 Strut misaligned 15 to 20 degrees (1-P-FD-006-H04) Significant axial movement of None piping and valve due to waterhamer
- Rupture disk failure wvould be
- Confirm rupture disks tested likely with nearby waterhamnmer satisfactory loads that would cause this large a Complete inspection of bellows displacement. 20213732
- Axial restaint from nearby struts is significant. Axial pipe movement unlikely.
- No apparent axial damage at wall penetration bellows Inspection data error & Engineering walkdown
- Complete NUCR associated observed less than 4 degree with 20210440 angle, within construction tolerance.
. Verification walkdown by originator of issue confirms no issue None Snubber Extension Tube Bent (1-P-FD-006-H20)
Excessive Load from waterhammer
- Support is bowed, a possible indicator of overload
- Adjacent supports and components show no evidence of high load.
Inappropriate snubber lockup
- Snubber tested satisfactory in RF12 expanded inspection Field misuse
- Extension tube 7/8" in diameter . Calculate lateral capacity is susceptible to damage if climbed on or hung from. This is a conjested area with frequent valve work.
Spring Can Movement larger than design (l-P-FD-006-HI01) Water Hammer
- Movement above design thermal movement
- Movement above design thermal movement is small 1/8 to 1/4 inch.
Nearby Maintenance
- Hanger is at turbine exhaust . Confirm maintenance since last outlet and is likely to be spring can painting disturbed by piping disassembly during turbine maintenance Turbine Induced Vibration
- Additional deflection is small, vibration deflection is possible.
Page D2 of D2}}