{{#Wiki_filter:H-1-FD-CEE-1 879 Hope Creek HPCI Exhaust Pilling Supports Analysis of Reported Damage in RF12 12/12/04 revision 0 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damage in RF12 Page 1 of 9
H-I -FD-CEE-1 879 Hope Creek HPC1 Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RFI 2-Revision 0 Table of Contents I Revision Summary............................... 3 2 Purpose............................... 3 3 Scope............................. 3 4 Discussion........................................................................................................3 5 Support Observation Analysis............................. 6 6 Conclusions and Recommendations............................. 8 7 References............................. 8 8 Effects of Other Technical Documents............................. 8 9 Attachments............................. 8 10 Signatures............................. 9 Attachment A: Engineering WA'alkdown Report Attachment B: Pipe Support Drawings Attachment C: Lisega Snubber Outline Drawing Attachment D: Causal Factor Evaluation for Pipe support Observations Page 2 of 9
H-I -FD-CEE-1879 Hope Creek HPCI Exhaust Piping Supports 12'; 2/04 Analysis of Reported Damage in RFI2 Revision 0 I Revision Sumimary Revision Date Descri tion and Reason for Change 0 12/10/04 Original Issue 2 Purpose On November 1, 2004, with the plant in Mode 5 for RF 12, tandem snubbers on the HPCI turbine exhaust piping failed during dynamic testing. Subsequent inspections of the HPCI system resulted in several observations. These observations were thought to confirm a damaging water hammer in HPCI exhaust piping. The tandem snubber condition was documented in Notification 20209622. This evaluation was prepared to assess if the observed conditions were caused by a water hammer in the HPCI exhaust piping system. 3 Scope The scope of this evaluation is the tandem snubber failure documented in notification 20209622 and the observations from the concomitant inspections on the HPCI exhaust line from the HPCI turbine to the torus penetration number P-201 (1-FD-006-HBB-20) and the vacuum breaker line from its attachment to the HPCI exhaust line to torus penetration P-204 (1-FD-006-HBB-3, 1-FD-008-HBB-3, and 1-FD-008-HBB-8. 4 Discussion
4.1 Background
The HPCI System is designed to pump water through the 'A' Core Spray spargers and the 'A' Feedwater header. The primary purpose of HPCI is to maintain Reactor Pressure Vessel (RPV) inventory for small breaks that do not de-pressurize the RPV. The HPCI System may also be used for RPV pressure control. Finally the System may be used for RPV inventory control following reactor isolation and a coincident failure of the non-ECCS RCIC system. Exhaust steam from the HPCI turbine is discharged below the surface of the suppression pool. A drain pot at the low point in the exhaust line collects moisture present in the steam. Collected moisture is discharged through an orifice to the HPCI barometric condenser. A system of vacuum relief valves and isolation valves is installed as a vacuum breaker line, which cormects the free space in the suppression chamber with the HPCI turbine exhaust line. This Page 3 of 9
H-1-FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damage in RFl2 12/12/04 Revision 0 mitigates the effects of water from the suppression pool being drawn into the HPCI turbine exhaust line. Table 4-1 lists the major components in the HPCI turbine exhaust line. The pipe lines are ASME Code Section III, Class 2. Piping struts, hydraulic snubbers, frames, and spring hangers support the piping. Table 4-2 lists the pipe supports of the lines in this evaluation. The isometric drawings for these lines are References 7.3 and 7.4. Per the IS snubber inspection program the inspection scope was expanded to other snubbers in the area. The scope was further expanded at the request of Design Engineering. In the end all snubbers and hangers were inspected on both the HPCI and RCIC turbine steam lines. Non-destructive NDE was also conducted on numerous welds as requested by Design Engineering (See Section 4.3). Table 4-1 Major Components in the HPCI Steam Exhaust Line Component Description HPCI Turbine Exhaust Drain Pot Collects condensate from turbine exhaust and turbine draining to barometric condenser Exhaust Line Rupture Disks Prevents overpressure protection of turbine casing and exhaust line Exhaust Line Check Valve (V004) Provide backflow isolation of the exhaust line from the suppression pool HPCI Turbine Exhaust Line Isolation Valve Isolates turbine exhaust line from the (HV-F071) suppression pool HPCI Turbine Exhaust Outboard Vacuum Isolates the torus atmosphere from the HPCI Breaker Isolation Valve (HV-F075) turbine exhaust line following a breach of the HPCI steam piping concurrent with high drywell pressure. HPCI Turbine Exhaust Vacuum Breaker Prevent the condensing action of the steam in Valves (PSV-F076, PSV-F077) the turbine exhaust lines from creating a vacuum and drawing torus water into the exhaust line HPCI Turbine Exhaust Inboard Vacuum Isolates the torus atmosphere from the HPCI Breaker Isolation Valve (HV-F079) turbine exhaust line following a breach of the HPCI steam piping concurrent with high I drywell pressure. Table 4-2 Pipe Supports on the HPCI Steam Exhaust Line Isometric Hanger No. Hanger Drawing Hanger Description Number Piping Isometric l-P-FD-01 H01 I-P-FD-006-HOI Variable Support H04 _-P-FD-006-H04 Sway Strut H06 I-P-FD-006-H06 Sway Strut H08 I-P-FD-006-HO8 Variable support Page 4 of 4
H-1-FD-CEE-1 879 Hope Cieek HPCI Exhaust Piping Supports Analvsis of Reported Damaae in RF12 12/12/04 Revision 0 H1Il i -P-FD-006-H 11 Sway strut H12 1-P-FD-006-H12 Sway strut H13 I -P-FD-006-H 13 Sway strut H14 I-P-FD-006-H14 Sway strut H15 1 -P-FD-006-H 15 Tandem hydraulic snubbers H17 1 -P-FD-006-H 17 Sway strut H18 1 -P-FD-006-HI 8 Hydraulic snubber H19 1-P-FD-006-HI9 Tandem variable support H22 1 -P-FD-006-H22 Hydraulic snubber on valve operator Piping Isometric 1-P-BC-06 H03 1-P-FD-008-H03 Frame (box support) H04 1-P-FD-008-H04 Rigid Strut H05 1-P-FD-008-H05 Hydraulic Snubber H06 1-P-FD-008-H06 Variable Support H07 1-P-FD-008-H07 Rigid Strut H08 1-P-FD-008-H08 Rigid Strut H09 1-P-FD-008-H09 Rigid Strut H13 1-P-FD-008-H13 Frame H14 1-P-FD-008-H14 Rigid strut H15 1-P-FD-008-H15 Tandem Hydraulic snubbers H20 I-P-FD-006-H20 Hydraulic snubber H21 1-P-FD-006-H21 Sway strut 4.2 Support Observations The observations listed in table 4-3 were made by the ISI group during a systematic walk down of the HPCI exhaust piping. Each observation other than simple "no degradation observed" will be addressed in Section 5, Support Observation Analysis. Those supports with no comments were not inspected by ISI. Table 4-3 Observations Made During Pipe Support Inspections Hanger Drawing Number Observation Piping Isometric 1-P-FD-01 1-P-FD-006-HOI 20210445 - No degradation observed. Cold and Hot settings obscured by paint. Scraping of indicator against can shows 0.25 to 0.375"movement, hanger drawing shows 1/8" 1-P-FD-006-H04 20210440 - No loose parts. Strut misaligned 15 to 20 degrees, shifted toward wall penetration. I-P-FD-006-H06 No degradation observed. 1-P-FD-006-H08 No degradation observed. I-P-FD-006-HI I No degradation observed. I-P-FD-006-H12 No degradation observed. I-P-FD-006-H13 No degradation observed. l-P-FD-006-H14 No degradation observed. l-P-FD-006-H15 20209438, 20209622-Snubber test failure Page 5 of 9
H-1-FD-CEE-I 879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damage in RF12 12/12/04 Revision 0 I-P-FD-006-H17 No degradation observed. I-P-FD-006-H18 No I-P-FD-006-HI9 No degradation observed. I-P-FD-006-H22 20210035 - Snubber as found setting not per design Piping Isometric 1-P-BC-06 I-P-FD-008-H03 I-P-FD-008-H04 I-P-FD-008-H05 I-P-FD-008-H06 I -P-FD-008-H07 1-P-FD-008-H08 1-P-FD-008-H09 I-P-FD-008-H13 I -P-FD-008-H 14 I-P-FD-008-H115 I-P-FD-006-H20 20210034 - Snubber Extension Tube Bent 1-P-FD-006-H21 4.3 Piping Weld Inspections All field welds on the 20" HPCI exhaust lines shown on construction fabrication drawing (Ref 7.5 and 7.6) were magnetic particle tested. All welds were found satisfactory. 5 Support Observation Analysis 5.1 Tandem snubber test failure (I -P-FD-006-H ISA and B) The snubbers on the HPCI steam side piping systems are manufactured by Lisega. The snubbers are Lisega Part Number3O72. The tandem pair of HPCI snubbers (HIFD P-FD-006-HO0 5(A)&(B)) were being testing in compliance with the IST Snubber program per procedures SH.RA-ST.ZZ-0105(Q) and NC.DE-TS.ZZ-3067(Q) to verify Technical Specification 3/4.7.5 requirements. For the A snubber, initial testing for running drag was successful with 1/2" per minute rate. The tension lock up and bleed test was then performed. The snubber locked at 107% of rated load. The compression lock up and bleed test reached 60.8 %, and then the load dropped. Upon opening the snubber the distance tube and circlip were both deformed. The B snubber failed similarly with tension reaching 106% and compression 10.3%. The same components were damaged. An outline drawing and parts list for this snubber is in Attachment C. These snubbers are on their fifth refueling cycle and this snubber pair has not been tested since the design change from PSA mechanical type snubber to Lisega type snubbers in RF07. Past IST visual examinations (completed every 36 months and last performed in RF1O) have not revealed any degradation at this location. No visual degradation was noted during this inspection until physically tested. Page 6 of 9
H-l-FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF12 Revisiun 0 An apparent cause evaluation is being performed in Condition Report 70042341. This apparent cause will address possible water hammer modes and snubber failure assessment. The failed snubbers were returned to Lisega for evaluation and testing. Based on Lisega's examination it appears that the reservoir poppet valve was stuck open. This allows the reservoir to fill solid, fully compressing the reservoir spring and loading the distance ring and circlip. This is a compression loading of the snubber. Lisega has postulated that the snubbers would have been able to perform in a Seismic event and that the testing method on the snubber test machine exaggerated the poppet problem to damage the reservoir snap ring. Lisega is continuing their analysis and have not yet provided a written report. 5.2 Snubber as found setting not per design (I-P-FD-006-H22) Design detail drawing (Ref. 7.7) calls for the snubber setting to be 2 1/2", the as found setting for this outage was 5 3/8". This would be a significant change in the position of the snubber. Additional research of inspection notes by the snubber program manager show the condition has existed since the Lisega snubber was installed. This will be documented in his disposition of the NUCR associated with 20210035. Confirming this are the engineering walkdowns that carefully examined the verticality of the valve this snubber supports. Also the pipe clamps on either side of the valve were examined. There is no misalignment of the struts on these clamps and no scratch marks on the pipe at the clamps. The clear conclusion is that the pipe and valve did not rotate. The engineering walkdown observations are included in Attachment A. 5.3 Strut misaligned 15 to 20 degrees (1-P-FD-006-H04) Walkdown by engineering indicated less than 4 degree from vertical. This offset is within construction tolerence. Originator of notification has been requested to complete Condition Report confirming he agrees with engineering assessment. 5.4 Snubber Extension Tube Bent (I-P-FD-006-H20) Although a bowed support is a possible indicator of overload due to an axial load. A lateral load causing the deformation appears more likely since adjacent supports and components show no evidence of high load, the snubber tested satisfactory in RF12 expanded inspection, and the extension tube is 7/8" diameter - a susceptible to damage size if climbed on or hung from. This is a congested area with frequent valve work-5.5 Spring Can Movement larger than design (I-P-FD-006-HOl) Scraping between the indicator and can indicates that movement from 1/4 inch to 3/8 inch may have occurred. The design movement on the hanger drawing is 1/8 inch per the hanger drawing. Paint scrapes between the indicator and can are not a reliable indicator of piping movement. This hanger is adjacent to the HPCI turbine. The indication could be a result of normal operational loads from the turbine operation, disassembly of pipe support during maintenance, original installation of hanger, or disconnecting the HPCI piping from the turbine exhaust. This observation cannot be used to support or refute the possibility of water hammer in the system. Page 7 of 9
H-l-FD-CEE-l 879 Hope Creek HPCI Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RF12 Revision 0 6 Conclusions and Recommendations Evaluation of the snubber failures and inspection observations reveals there is no conclusive evidence that a waterhammer event has occurred in the HPCI Turbine Exhaust line to the Torus. All inspections point to a structurally sound piping system that has not experienced loads that would displace the line, rotate pipe clamps, damage component, or overstress the piping. The following recommendations should be implemented to complete the validation of the conclusion of this evaluation
- 1.
Lisega Inc.'s final failure analysis report must be received and confinned as matching their preliminary input.
- 2.
Completion of NUCR associated with 20210035, Snubber as-found setting not per design.
- 3.
Completion of NUCR associated with 20210440, Strut misaligned
- 4.
Confirrn that the rupture disks tested satisfactory
- 5.
Complete inspection of wall penetration bellows, 20213732
- 6.
Complete assessment of snubber extension tube lateral capacity
- 7.
Evaluate extended HPCI run entering R12 and assess impact on snubbers
- 8.
Confirm maintenance on I-P-FD-006-HOI since last spring can painting 7 References 7.1 SH.RA-ST.ZZ-0105(Q) 7.2 NC.DE-TS.ZZ-3067(Q) 7.3 1-P-FD-01, Revision 24, System Isometric/ Reactor Building HPCI Turb. Supply and Exhaust 7.4 I-P-BC-06, Revision 12, System Isometric/ Reactor Building RHR Cross Connect Vacuum Breakers from Torus 7.5 1-P-FD-004, Revision 9, Fab. Iso HPCI Turb Supply & Exhaust Reactor Bldg, 7.6 1 -P-FD-005, Revision 10, Fab Iso HPCI Turb Supply & Exhaust Reactor Bldg 7.7 1-P-FD-006-H22, Revision 1, & change from 4EO-3507, pkg 3, rev 0 8 Effects of Other-Teclinical Documents None 9 Attachments A. Engineering Walkdown Report, Pages Al to A2 B. Pipe Support Drawings, Cover Page and Pages B I to B50 C. Lisega Outline Drawings, Cl to C12 D. Causal Factor Evaluation for Pipe Support Observations, Pages Dl to D2 Page 8 of 9
H-1-FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damage in RF12 12/11/04 Revision 0 10 Signatures Preparer Peer Reviewer Independent Review I \\. Date: i:> 4 l £ Date: I -I \\-6 dr Date: /Z-12-7cegel ThA JieciL. Approved B -N w .n-Date: /Z - / 7--- 0 ) Page 9 of 9
H-I-FD-CEE-1879 Hope Creelk HPCI Exhaust Piping Supports 12/12/04 Analysis ok Reportcd Damaac in RFI2 Revision 0 Attachment A - Engineering Walkdown Report Inspection Date: December 4, 2004 Engineers: Alan Johnson, Civil Design Supervisor John Barkhamer, Civil Design Staff Engineer Inspection
Purpose:
Inspect the HPCI Turbine Exhaust Line from HPCI turbine to the suppression pool for evidence that would support or refute the reported damage attributed to waterhammer. Approach: Using the piping isometrics, detail pipe support drawings, and ISI observations as a guide, a hand over hand inspection of the piping was performed. Attributes that were carefully observed were pipe alignment, valve alignment, claunp alignment, scratches on piping that would indicate clamp and frame rotation or axial movement, position of insulation, crimping on metal insulation at tight clearance locations, attachment point wear mark, and attached cables and small piping. Results: Observations are in order of inspection from turbine to torus HPCI Turbine Room Hangers in the HPCI turbine room showed no evidence of large deflection. Hanger l-P-FD-006-H01 had less than 4 degree angle to vertical. Scaffolding was available at wall penetration. The adjacent support, 1-P-FD-006-H08 is a box frame that showed no scratches or other evidence of large deflections. The pipe as it penetrated the concrete wall was not concentric with the pipe sleeve. It was slightly north of center. All supports were satisfactory. Torus Room Torus support lower and upper pins near the HPCI exhaust torus penetration were inspected for signs of rotation. There was no evidence of pin extension, light surface corrosion at pin/support interface was unbroken, and dust on pins was undisturbed. The torus room concrete wall to HPCI piping bellows cover was slightly askew, only the outer convolution of the bellows could be seen, The pipe appears to have been installed a bit north of wall penetration sleeve center. Inspection of the bellows was not possible with cover plate in place. The first horizontal from wall penetration and vertical runs showed no evidence of movement. Two struts, l-P-FD-006-H 1 and H12 that provide lateral restraint on the vertical riser were aligned and showed no evidence of rotation. The next horizontal HPCI exhaust line run includes the exhaust line check valve and the isolation valve. There are 5 supports on this horizontal run. Most insulation was blanket and it allowed for pull back and close pipe inspection. Scaffold provided very good access for this length of pipe. Strut H13 adjacent to angle was straight and aligned. The H1I5 with tandem struts was reinstalled Page AI of A2
H-I -FD-CEE-I 879 Hope Creek HPC1 Exhaust Piping Supports 12/12/04 Analysis of Reported Damage in RFI2 Revision 0 with new snubbers. The frame, lugs, and pipe were examined for evidence of movement or loading. The support frame and lugs had no paint scratches, wear marks, dents, or other signs of loading that would indicate high load. The piping had no scrape or paint marks at the interface with the pipe. The struts on either side of the exhaust isolation valve were aligned correctly. Close cxamination of the clamp/pipe interface confirmed no rotation of the clamps. These clamps are very close to the isolation valve. The attachment cables to the valve operator were taut but showed no signs of stress. The valve orientation was vertical. Snubber H22, attached to the operator, was aligned. There was no evidence that this valve rotated due to piping movement that could account for the change in cold setting. Additionally the insulation on the pipe was in contact with an adjacent structure and showed no damage of evidence of large deflection The last pipe segments of the exhaust pipe to torus penetration were all satisfactory. The vacuum breaker line is a 3" line that includes two check valves, two motor operated valves, and a manual valve. The strut reported as bowed was not installed. The location of the strut was observed to be in a location that could be used for climbing. Page A2 of A2
H-1-FD-CEE-I 879 Hope Creek HPCI Exhaust Piping Supports Analysis of Renortecl Damage in PSl 2 12/12/04 Revision 0 Attachment B: Pipe Support Drawings Attachment B Cover
R RESPONSIBLE FOR VERIFYING PEVISION, STATUS AN4D CHA1NGLS i-P-F[)-006-H001 001 5 PRINTED 20041202 I -ND -lr~ IRT I-- _:E- _I mul =L l~~~~~ r- __u-('l i... -4*. I- -- 1 -- I -R2".) P O.n TVPt.(FEb-e Oh -I, T-4Th 'i/F4,1 x O ruw __ -3_- -l -1..--14 N,/" ~x..' R /Ol~ dd wl:' BT -.-...................- 2 -_. _Her Nut S Zt /pr W.ldk Eyt Nut 6 1 9 Thr" BoaltiplpvCItnp Provide Lock Nut T 5' t A6~L C~L1 1 X 6100fi S I W S 10X49X8'-9'/eY'LG. ___ 2 e 40 X B SFffEHR P-ATE P+/-EF P- 05S__ N HOTE: ALL MAT'L TO BE Sh-36 U.HT.O. STRESS ISO DATA POINT 1/9/ 4 \\L 7 4 4: (TX.t) ) l(t) l T, 974 -4k YZJ W2 MT~~ W5bx 5DDC~ 3:6-p IS5~'~F (-L' 4!Ail AI,> 114 pw04 F 1 Opa fmjl S'HALL Pf H4K /9I-P-FD-oo&-H0Z t-PI F '-B8 PI LOCATION PLAN 1NOTE AREA Za fRlo 1 I.HANCER CRITIMCA J7'K V) ' I 2.CODE::a . CLASS Z_ r. C 3.SEISHIC CATEGOR' L 4.EZ~&r EEOV IA'EL ',.TD?5 klZ 'TO ~VDUO'TM$ L. 4.r r (PIPE ROTATED MO)R AD .4t PIPE OTATEDO8) HYDRO" LOAD cr8 ELEVATION A-A MAP NO.E z.L LOADACI2
- I fJsUEtr~,W~gog ;£~g q'?LC. AJP /I4CoFf~
i.G4'N~ A 'o PlEv1 t: F(R P. 5002J4k *6p MIR-. QUIVAN PM tA4 I V. A, IvII30 N a J tV BYIO EW MtCH'K E "LIC MVICE1 uLCTmICc Ao ClAN 10 1-PFh-Q1 QV HOM CMEEK GENERATING STATION lEF WE C 7 PM~ t&2MTl STEEL01-°-l1 F1T, 5UPOMT ?EAGOTO D l DG, ln No. DRAWINGNO. irEv. APCG SYSTEM TUMNE 5TEAM 10OSS r-P FD- -OO -i (Q) 6
sc-p RESPONSIBLE FOP VERIFYING REVISION, STATUS WG 1-P-FD-006-H004 001 3 PRINTED 20041202 AND CHANGES I II II I. I -S~O DATA POINI
- H4d,
( 5>^-W/j¢Z , g;C3f -B ,&, R fyt 4--V 1 g/w5s /A'Ju-7RF .rF .Z r -- a= AIF ( I -5S iflf: LOCATION PLAN AREA Z3 /V N DT ES:
- 1. HANGER CRITICAL 2
CODE 5f2..c LAt Z
- 3. SE1514tIC CATEGORY
/ M AIXgO1f/M 1OAD Tr.6TS Juyaooss F Y *t BsOW
- 800 soo5.
000 MARY NO _-_D-_______ BY IBY 1H KI
- SDL ENG ISTr 4 '1J ELEVATION A-A Ft V DATEj Pt I V I O N I "CLiC SERVICE ELECTRICAD MSU Co-l I
I-P/_D 01 aril HOF CREEK GENERATINC SrATION REF. -p _p-3I "3&. 12 Os DWGS. SA Fts~rSTE E L _/ PIPE GUPPORT.- REACTOR BLE 0 o NO. ORAWING NO REV. ,Dr y*{ 8 H /- P-fZ 2 -$D2 -/104'Q ) ./ !-i
.I[> RESPONSIBLE FOR VERIFYING REVISION, STATUS AND CHANGES qJG 1-P-FD-006-HOO6 001 5 PRINTED 2004120-2 ITEM !
- o. I rlAfT I
N t I I I-t PIPE 3 STEEL CO?65X3 -1AS17'7 I __9.1 .I
RE~0ISIBE OR ERFYING REVISION, STATUS AND CHANGES RE~SoWSIlBLE FOR VERIO11rlT> 0410 1PD-M l06-1-Hl08 001 4 PRINTED 20041202 IT EW. NO ART SI !ZE f K t KEUD ND DESCAIPTION j i 1 1 Bea We i clxm A _th__ Z Gxcr'?i- "Z62C6. 3 1 /x x 2? Co " /6. (.SEE ELEVATION A-A) 4
- 3.
141Yex/t07Z&,Rod W/ 7'./. COA'7r-10s -HA& 5 I Z He;: Nut 6 J -1r / Werdless Eve Nit 7 O' Three Bolt Pipe Clamp Provide LOCKc Out. .R M'IA&F SUPPoAT1 7YAFB'LA%2A _7A1 _evCtx2S5o -RAW-1
- rpp.
aNiOTE: BOLT & NUTT AT'L FOR CLAMP - A-307 6R.B 1_ I.._AL MAT'L T0 BE SA-36 U.N.0. L & (t, / 4 '7 7 b f A-LOCATION PLAN AREA 231RIO 4 t \\,EL 65 144ti NOTES
- 1. HANGER CRITICAL 9XlIT US-TT 2.CDDE SEC.M cLAss 3.SEISMIC CATEGORY
/
- 4. DO A'o AtRO'de TRA V-L
-STDPJ PR/OR TO Hl'DRo rfEr HYDRO LOtn t ELEVATION AA LOAD_ lot MA-K /-FD-o 6-H8 - t5f 4° g:<D~~ M2 ~ Ixbb SSUEDJ F~M /AB&i4 E55,. CA' X I/V CORPOR W D .82t a{ MA BLIC UM 2EtCTRE"ICA W C4XAS! 00I so 1 50f ° 2/9 HOPECREEK GENERATING STATION0
- REF, plPE S. I f 2 UW Ts DWGS.
5E cO 4 6 // FV.7 .SA'N FRAWh: S TEEL C06_ lfV PIPE SUPPORT REACTOR BD6 l U NO. DRAWING NO. REV. i>iC/ 5 YS746i/ 7OR&5A/E 57X/4 7Z85l f-O 4 tN Q I11 IC-av'! Irrs-6 9
.ER RESPONSIBLE FOR ANG 1-F-FD-006-H0ll VERIFYI14G pEVISIC'NI, STATUS A14D CHANGES 001 1 PRINTED 7'0041202 ITEM No HEo0o tART No 5'IE OESCRFPTION 1'I-e'.577?u7I I I-3EC.770NV 8-8 wT
- 1 LOCATION PLAN AREA 20/B//
H 0 f-C Co .a U) NOTE b 1.I IAN CER CRITICAIL ,20'PfP 2.DDE SECT X CIASS 2 3.SEISMIC
- ATEGORY I
A ELEVATION A.A (LATER4L ?E5,-'//') PIE v I s I o N S ~t:Ctv~ct ELECTRIC cAJ0 GM otAIv HOP CMEEK GENERATING STATIDt kS. tI 2 1&U-P72 RE F. IPE WGS. STE C-0702-1 NO.REV. DRAWING NO. iREV. PIPE SUPPORT 7R~ICoR BSLDG RPC/ RR's S,- ,,>tSM JOB NO. i l IoL35 /-P-FD-0o6 -iff (co / I ml~a - .. L ---
~ER P?0S1q,, FOR VIERIFYIN'G REVISION. STATUS t 1-PFD-006-H01 2 001 1 PRIN4TED 200C4 102 ITEM NO tFART SIZE NO YIEWD NOEO e J--L-i2 T $WAYETRU _ ta___________ PLArJ VIE4 171 5c'g-4 E pTI A-A 1_ ELEVATION A A N ,,,T-1 'J-*7 V Z'1JidTE) A1ND CHANGES ,so i- -Fn I0a
- PIPL, P-z0-U
-/ slLEmC-0702-I/17. / AC:V.2 I ORANVING NO Rl V / - P -FD -0. 7D-,,./2 (0. J ,r r -A P r = ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ^ _tL-,<zp. =:
ER RESPONSIBLE FOR VERIFY114G R-EVISION, STATUS AiLu CHANULb r'G I-P-FD-006-H012 002) 1 PRINTED 20041202 A r / 7jv/C, $? /73 7: 4 ' I fa I -,O. C*>pt r EL BE P 4-CEiv 34'.5" I ij-IIv '4. 1 i 1 I I III I e II I, L_ = = _ g E & ~ f D 1-SEC/IVN e-MARK N0. /I- '*oob- /2 A. -YE-= T- / I < I I rtuV 0XITl 3% 1 v I S I 0 N a ,Bymrqs PU"LIC L!RVICE ELECTRIC AND GAS COMPAIJY HOPE CREEK GENERATING STATION REF. PI_ ol is 2 UNLIS &SHFA~w TEE' o 70Z /r A',Piz PIPE SUPPORT -?g*cIo BLDG s5NO. DRAWING NO REV. PIPEc SUPPORTE BLDG.i6~/WT-_____ 'y>Ct rc/.ea/m.- sa<) f 10 855 4 6(&.4 { ) / a:~ d
- 7t P 7
3ER RESPON4SIBLE FOP VERIFYING REVISION, STATUS AND CHANliES NC 1-P-FD-006-H013 001 6 PRII'!TED 20041202 TEA RNO rAT stz. i0Aolo P. 40 1tI'TO Y"rAT'L J I 2 I j'6 SWAY STRUT ASSY, O.D. PIPE 20 W=. f'-4tLOAD t 1 - - I I/8X,//9X @4W(FLF w 1rifTc'vwT u___. ____I_5'x S x3 /zr" A4A1LE Cti P.5 V L 42 12 fX72)7- -/ ° 2 7r. 2 Wl'X72X (FIFLD CtAT TO SLWIT) -7 2 ~~'X'/ 4'14 F.X iC A 8 3Xp "X SY2 'X H" I-Wg A W4- \\_ W-5156"X 5"Ay l' -2Y2"
- NOTE: ALL MAT'L TO BE SA-36 U.N.O.
- STRESS I i 7ZI WeSLD klvuU
- Ty_
.1 WI to-Sp Ros C-4~j N OTE I. IIAN(CER -F %6-v2.CODE LpfES) 1 .SEISMI J WVTO#+/-AUr S( DATA PnfiNT ht3 (3/-68 (8 S4 ( .r 7.. .f Q it LOCATION PLAN AREA 20/,&/f CRI TI CAl. c, Cl.ASS 2 EC rA 7:V 7 7..; ;I,lV. P I, I - I-ks DETAIL r v Iw - :>:>- vI,-7
- 4. -C.o> td
&b 3t C 7_1 Z4 :1, ffi o HYDRO LOAD ELEVATION A A ( V/$e'rCA4I. jgA/AT R l4x l-w-Cx6-113 C i,,S4 1pri, I3P _tz^wfge-&-0A1CfZn oe-tifI l A, _I_ E 5mEp p'FCR.#F-/15.3-nrtv fE Ft v I 5 I 0 ts S PMLStVtl ELECTAIC AN GAS COWAXY H01'CT EEK GENEIATI4G STATION W IA 2 uATZ SAN FU~IJC tSCO 0Y BY ftH'K A i i hEG kR % ,so 1f zj2D.. Ol 7,&tE, 41g1 REF. PIPE _ DWGS. T-e o2-S47/ X'1nw ,g E IEELCL2O. ,L..8700.V. '5 DRAWING NO. iREV. PIPE SUPPORT REACTOR BLDG. "PCI/ 7'RB UPiPLY V EX-u57r JO NO. + IO955 / p 0-0oo6 -,<z I C, Syr / 6= 2 4-. Z., P. 4I44 i - - '--" .4 -I r -0 l
SER RESPONSiBLE FOR VERIFYING REVISION, STATUS AND CHANGES WG 1-P-FD-036-H0I 13 002 6 PRIN4TED 2'.041202 PlAN 8 -6 m p-o;oB T/S. EL 9952 34 1/ 'r~ _i-r- 2 FF) -,1,t i I v i-FD-oo6-,q13 >vWs. P -o;S2 6ZE:C!710 5Ce- 'V1 - -k I L - -- - j to ~~13 MAFA~ NV. -P-E32-r 55'-I-P.IFD-°G§l "Tr-' IT, '-kiEV I- .5 IEN I ! V I I I S aB_ ='K r PU L!C &ERVICE ELECRIC AND GAS COMPANY RE 5O HOPE CREEK GENERATING STATION OWES. PIP-NOS. I L 2 UNITS SAN TEE PIPE SUPPORTREAC6oT EBLDG. -B NO. DRAWING NO. REV. tl/PG1 / .fiPLyzt/$7 10 855 /p FD-00 -/-/43( 2 _r 2 1.1 - .!=- - r-&;r'j -1 f.;: z~.g Z:,_:, 7._ ';;Z 1 ,i
RESPONSIBLE FOP VERIFYING REVISIOI'N, STATUS AND CHAN:3ES 1-P-FD-0C16-H014 001 2 PRINTED 20041202 _C nZE sc o T I W '- 2/a'3 LCAD -z(5E TABLE BLV>k; 35i t 2o'" 0.0. STIPP C-LAMPw-igf OLT _ TS 8 L 'A 4 T'SIx 1 L x V Y2L St#cPor 7Ž7?-f
- Jt',T) s TCI 1-;
V2
- -2.'
.I (b T5So: ( ^Y S .7 I TS. I LG 7, VZZ _7SgsSx/tfI_ XIf Ho Jt 7-0 r~V/7 -) 8 T rs IOlo r v'i 4 1G fi-rr-t atJ
- Ire, 9
2 fPYo 81Z &2 sL-10 (2 _ x I o'/z x' 'i o'z L4 Ct STRESO. PAOB. fjo.a-Q l- & D ____,14=-l
- 284 (3 -)r~-x
\\L. B- / }. LOCATION PLAN AREA 20 /rII NOTE
- 1..IIANCER CRITICAl.
20" pPI 2.CDDE SEcr El Cl.ASS 2- \\ J 3.SEISMIC CATEnORY I
- ,~
FORCE WT. A l R UAsET -t MEZ. St i ULTO F. 1 I U'PS72 I T98A o D ) ELEVhTION A A (.6 rt-WEtsr RS-rRpAI IrJ R-. ,-/-. XR Igo -FD-00b-H1 lM0/SFSP FDw rSIAM 17&" G4=-." /NCOY FCX ?/iogEiy l FFh1I!#O _ F L of ot 4,7 I) Alt -- II-L WJ 18 gAr 10AAf I tw l I nCV pt M c t I t I SW I IB PL K;1F1YtCXELtcK MM MU CO WXX l SYS ISO 1S DO 6r0 "3ft CREEK GENERATING STATIOI REF. 1= STEEC-070 2-iS.'r I RE' 12 PIPE SUPPORT JREBCTR
- R NOC)
DRAWING NO I REV ICc '8( IJU ' 5 H15. Io5F i-HPC 7JP6 UF>L4~ XHUS
- r.
.t..
- EP RESPONSIBLE FOR VERIFY IING REvISIONA, STALUS AlNDID CHANGES
\\'Gi lP-FD-O5c-HO' 4 002 2 PRINTED 20041202 ."vu I Nso. I -l OMEtTIt A:o 176'42 PLPAN E-E 1AAFr.NC). I..F:D-oOi-t4I 4 I A~rl oI... -F -. 5'm - Xv
EREP RESPONSIBLE FOR VERIFYING REVISIOlN, STATUS A14D CHAJAK;LS '1G i-P-FD-006-H01 4 003 2 PRI4NE.D 20041202
- ! dwUwl 4 11V rz.
i
- ER PESPONSIBLE FOR VERIFYING REVISION, STATLIS AND CHANGES VC. 1-P-FD-006-H015 001 3 PRINTED 20041202 ITEWd l j
FIG. s / ,$,If T3O Ct NO. IG R ME Ge-MK EC=. 6,eI-AP: Ae OK2 7_G__ W- =4-olvI 1", ACC.EA-E.RATIO -VA Mb. 'L.- _ l E&A R O7-T.j \\WATOWT Re7 ln G 4 IAZ t L 2~ 641t4i-O L. 7 __ 1 x 4 YCUT -To x1 -6 ZZ p
- ,ML'
-4 ____l x O -G lq-- .L4 _ Y 0 -- /IIL C. WmiE-: ALL MAI'L.70 !75 5(o W Q..0. STRESS PflOU.No.31 (Q) .& Dy.P.114 'v MATCH PQCFDWA00 5WgrFw5G LOCATION PLAN AREA 20/011 NOTE 1.IIANGER CRITICht. 2. CO DE TIE:_ C I.ASS 5 3.SuISMic FAT EORY r
- 4. 1INTAbLL4- 091EMTAoK o
f-M 4 I ' ALL NOT rXcP O Col 1°0M vcO ICAL IW POEtt tE FAULTEi 1. F---o M, LI IC 3,ooc4I s gwl.Pe-R APv *rrjYIC5 -TPa 1 TL LY. "I'% ELEVAT1OH A A mA~mK tso, I -FP-00(a-Hlrq = al~tl~d2-Z 7 t-7 ro} JAI ZrtIVArvr At AAI I IA. n e5,
- f.
A I I- --.Irl I W. 1-4 I ae-I'V. -1 -I-fl LZWkll lll-H;v PO~R HWAL.,Ina T8b511-tNiE--F Wh -Al.- lK zIV __34 115 R SI P E m sEP I' tt4coKR o7 (7 W-RcN 4CP-l MrO l 5 G 62 lo Poi otL3'" 0 IlwoT To t.5 "xv arrtl I rz I Y. I a to 3 CIAI YtlgX 0 tGtS: ta _O_. RF0c aw= asvctc ACt;Y4 C77I Sy SYIso IZPF-I EV. Io YtXe CnEK QEWErMTW ST^l.Z n EF -P PE SUPPORT Z EACT LOG o Dr.AWING NO REV H P C _ I -_ _ _ _ _ __ ' f4T. ) I 3 2 S ~ -m__
SER R.ESPONISIE E FOR VERIFYIN4G REVISTOIC)1,I, STATUS AND CHAI itES WG 1-F-FD-0C)6-H015 002 3 PRINTED 20041202 OT E: CL)'CLEAZAiJCr-I,,R;) BE MAW- -%At'ws1 DETVV::-A' IT=-VA-20 Z I ,6^b -t, l f 1 we e, 4-
- Z. E=
= = _.... _ ~ ~ , r }n 11'~-t s-et n -'By"
nKEal CHANGE5E DO'CUM-ENT 1I4TE_ 20041210 PART 2 - MODIFICATION MD
- TESTING, FORM WC.DE-WB.WZ-0003-7 240DIF1CkTION DOCUMENT COVER SECTION 5.0 SHEET MD NO.: H 35 CHANGE NO.: 4EOC-3507 PACY1AGE 1N0.:
03 CP REV. NO.: 0 PAGE 14O. REV. NO. 1 0 DOCUMENT CHANGED: DWG# 1-P-FD-006-H015 (PROVIDE TYPE, NUMBER AND Rev. 3 SHT/VOL NO.: 001 REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE IMDE: Replace ex:isting snubber with LISEGA Hydraulic Snubber as detailed below : Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin 1-P-FD-006-HOJSA PSA0035 307256RE1 30-1003-1501 30-1003-150 New Cold New Hot New Flp SruReod Set (CS) set (BS) Strokeud Removed (in.) (in.) (in.) (Y / N) ( IN) N/A N/A 5.88 Y N Construction / DOC. Updater Note:
- 1.
"Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "1Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. 0j ORIGINAL ISSUE M. C. Chang 8-1-97 T. Nickerson 8.12-97 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE MCRs Page 1 N luclear Common Page 2 of 3 (Page 1 and 3 contains the Instructions) Rev. 6 go 5
(N::D HAIJGE' DOCLIMENT '_1I1i ED 2004 1210 PI.RT 2 - 110DIFICKTION Em TESTING, SECTION 5. 0 P'OR1 NC.DE-W.BP.ZZ-0003-7 MODIFICATION DOCUMENtn COVER SREET MD NO.: H 3 6 CHA-uNGE NO.: 4E0-T3507 PACKA.GE NO.: 03 CP REV. NO.: 0 I PAGE NO. 1 0 PIEV. 10. DOCUMENT CAINGED: DWGfi l-P-FD-006-H015 Rev. 3 SHT/VOL NO.: 00. (PROVIDE TYPE, NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE MADE: Replace existing snubber with LISEGA hydraulic Snubber as detailed below: Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin I Stud /Pin 1-P-FD-006-H0l5B PSA0035 307256PRE1 30-1003-1501 30-1003-150 New Cold New Hot New Flip Shroud Removed (in.) On.) (in.) (Y / N) (Y IN) N/A N/A 15.88 YN Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. 0 j ORIGINAL ISSUE M. C. Chang 8-1-97 T. Nickerson 8-12-97 REV. REVISION PREPARED PEER REVIEW 1INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE 1_CRs Page 1 ,.WI. Nuclear Colmon Page 2 of 3 .(Page . and 3 contains the Instructions) Rev. 6
RER REsPoNSIBLE FOR VERIFYIG REVISINO1, STATUS WiG 1-P-FD-006-H017 001 I PRI14TED 20041202 ANMD CHANGES __S rnrw No I HO p i;EC' FIG. NO. DESCRIPTION+ 2 1 1 STRESS PRO8. NDoC-i -ffIw), & D.P 74 ' J LE _2 *77* of I LD>CATION PLAN AfIEAio/51 ( CEF, I NOTE 1.HiANWIER CRITICAl. 2.CDDE SrC.T ¶L C1.ASS 2 3.SEISMIC CATEr.ORY I ELEVATION A A ( EA K E V I I *0 o 2 INMUC SltMcM tLfECTXIc C:& CWAAY HVI CREEK GENERATING SITAIO Wu14 B'tH'KPE -ENGE S sYs ISO 1froo c~ REF. P.tE rnwr~ I gm I1 2 LMcT VRE SUPPRT REACTOR BLDG HPCt TUWZ(Q. SUPP'.-' EKHUST -AP ki7
-ER RESPCONSIBLE FOR VERIFYING REVISION, STATUS A14D CHA NIGES VG i-P-FM-006-H017 002 1 HRINTED 204 1202 I
1ER RESPONSIBLE FOR VERIFYING REVISIOll, SlAIUS Al4D CHA14UE-VG 1-F-FD-O06-H018 001 2 PRINTED 20041202 r M 9 ITEM4 I14 FIG. 140. I/ 1/4 -fYI l.kT 'L I M0+4 GA::SQOA-RESi&..WITH OUTr Cj..fAMP LOD-7 !y ,W -L /15,ACCELERATIOTN __02__ 2 I~ 43 S A o.D. S-t I=PF C-LAM f'WITH LI - oL-r '3 4 T VYJ~ L&/b LC: SEE. O-TAEl-4 I______ NO0TE: ALL MAT'L TO BE SA-35 L.; N.O. STRESS PROB. NO. rq P. B/S jL. S7FID Z Lj F.)F NOTE I. HANCE P 2.CWDE&I 3.SEISMI
- 4.
INiSTr ELEVATION AE ~ ~Lf J E 01-C -Q'/ 1892 a 2-I K QrTEEL. LclcAl'o.4 LOCATtON PLAN AREA,2o /al~ I I CRITICAL. -:CUr ¶l CL.ASS 2 C flhTEGORY I ITEM 1 SHALL Not Isozao i/poa#j 'A lij io'I' ( VEgZT I r-At-GrQ LAt'36E V-) /i2\\W't(leAJr-V? R' FIAL(R CALC. 4 W1CoRP?.faY42ri riav loTEI AIt V I SO I N e 5 __J PUBLIC SERVICE ELECTRIC AND GAS COMPANY HOPE CREEK GENERATING STATION r SA? fNAA'C0 REF PIPE- _~.. 7 DWGS C-BI_~ ORAW.ING NC) REV .4-R-D-&oo-Nr (i 2r -I PIFRE SUP-PORT. REACTOR BLDG. IHPCI TUL15 SLJPPL-f '4, E7CHALItST X38 NO 10855 C .1. -
iSEp RESPONSIBLE FOR VERIFYING REVISION, SIAIU U AND UHAli.-L sWG i-P-FD-006-H01 002 2 PRINTED 20041202 E^F 5 I E r F - s P s 6 11 I H rr~ljse 4.O' ,IExK-r r=P-5
- Tt P 1[7, e-EL. 56'. S".
(UEF=.) r I J STEEL LOC PLAN 51/z4r I DE:TAI L-1 MARK N0. W-F D-o0o -H I8 YS I[so PUBIC IERVICC LECTtIC IND GIS COWAAY HOPE CREEK GENERATING STATION REF. DWGS. Nos. I 5; 2 WITS PIPE SUPPORT REACTOR BLDG. DRAWING NO. P.EV. 2 _ l - P-F= D -O 6o( - H15 fo), HPCI TUZS SUPPLI 4 Ef4IHAUSST
NIlEC; CHAI.I^E DOC:UIMEI4T II ;TE) C204 110 PKRT 2 - 11ODIFICKTION }JD TESTING, SECTION 5.0 FORM N:.BE-WB.Z-0003-7 110DIrICz-.TION DOCUMEhT COVER SHEET MD ND.: H 337 CHANGE NO.: 4E0-3507 PACKAGE NO.: 03 C? REV. NO.: 0 PAGE NO. i 1 REV. NO. 0 DOCUMENT CHANGED: DWG# 1-P-FD-006-4101B Rev. 2 SHT/VOL 1NO.: 001 (PROVIDE TYPE, NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE tgDE: Replace existing snubber with LISEGA Hydraulic Snubber as detailed below : Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin l-P-FD-006-H018 PSA035 307256RE1 30-1003-150 30-1025-150,L=12 New Cold New Hot New Flip Shroud Removed Set (CS) Set (HS) Stroke F h Remove (in.) On.) (in.) (YIN) (Y /N) N/A j N/A 58 Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and -Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL l 4 /& A ISSUE LM. C. Chang 97 T.Nickerson 971 0 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO._
SUMMARY
BY & DATE & DATE MCRs Page 1 \\w_ Nuclear Common Page 2 of 3 (Page 1 and 3 containo the Instructions) Rev. 6 ,- ? I
- ER RESPONSIBLE FOR VERIFYING REVISION, '
- IAlUS ANU UHAN`SA,
'VG l-P-FD-006-H019 001 3 PRINTED 20',41202 I li t won Il I L. lO sA MECIFT I qN Klo... _~ 1c. LI Z ErI I T Pl-< Co1lep, PIV4 r 4 G 2 1405 I '-'L6 wt-AstfH lb" re t Ce I1 oUIT i.I ILD A t " 'i NUT 5 2-290 1" WF-LuE.ss -iNU T, - 4 Dlo 49 Y9 8'-9" C-c Lt. SEE S&L. LOC.. PLP% !CLIT 7o E, J'T ArJD £LEv'rlojA 8 8 P. 3 4ibST tFFwEC P-ATE, POvioaE Awo lr4ZT^LL PER rD>FTAIL P_05SES (BILL o= MAT'L COT. OI stir 2 oF 2 C. `6 c rr; G 1 I 4, 1'-5 STRESSPROBl. NO.c-B51(,N% @),& 3,P, Y19 /' (Ty H ci p) 0zt>2 I "j jR *nls EL. ___91_ 9 m> A' F1XSTd4 -A-oAv 1 1 I lLOCATION PLAN PIPE FAIRICATO .f AREA 201/ r II NOTE I.I. HANG~ER CRITICAL N I" 2.CDDE SECT T; Cl.ASS 2 3.SEISH[L rATE(ORY I n v (55 2I t1 n9 4g M4.P.OVPIE 7>H^oRYscippogT I-Thfn '1I' /Y'. IIwo IW 7'_o3/' ( t 20" PtPe HYDRO LOAD 0 //,6Z/ ELEVATION AA LOAD MARK NO I-F--OO-HiS 0PVp~} VIs Fi5 'i~ BY t:'K EN Ft( r LT l I s laisoo HalE CREEK GENERAT)O SATF OlEF. ,s 1 I &2 WT9 IWGS ST(ECD7O3l.&T t j PIPE SUPPORT REACTOR R.G)OHNO DRAWING NO REV HPC) fLJRB SUPPL'q EYwAU l-P-Ft)Tlor~,.I () 2 F-0 ELi a:1 cl) 'ir 'I I,>11 1 s f l >W tU lBO;
SER RESPONSIBLE FrD VERIFY'ING REVIS1IQH. STATUS AND CHANGLS WG 1-P-FD-006-H019 002 3 PRINTED 20041202 61__ F. O1.0 DEQD NCC. DESCQIPTIOWN W'. L 9 I 200. SPECIAL RtSCE CLACP C C_- Pec ITTCrL>;tJvJlELL sTss REr1r 6A-412b- & Pdc~rEL Ou(.insTr No. 10S ______-l2-to R (" f6 1' NOTE: ALL MAT'L TO E SA.-36 U.N.O "7,, .1. Q 00c I !£ Cn .~' P illrs X sf 1°55 .CJ-'-i /PLAN B-(6 &l (LUG ORIENTATION) /Ai 151" 30' STEEL LOC PLAN ~MARK HQD. I -F D 0b -H 19
- --5Lcs 51,'J.
Ol 0s ?1 t -t _I IiIa S. ByRKMIIN~ MJAILIC SERVCE ELECTRIC ANO GAS CDM AR'Y HOPE CREEK GENERATING STATION P. OWiS.PIPE wxS. I a 2 UNITS SA F nSTE~m PIPE SUPPORT REACTOR BLDG. 3040. DRAWING NO. 6EV. 10855 IPF2-F2 Hpc -LJF13SupL4~ X~kS_(. AV,_ ..,,rvfL
SER RESPONSIBLE FOR VERIFYING REVISION. STAT.-US AND CHAHG:LtL 1-P-FD-006-H022 001 1 PRINTED 20041202 40 FPIG. W I FL [tOro W V i I L ___RAc__ r, T. P., Vt KIP' -A I L _E_-_'v L 5 D 4 R -5 G CziEtr cur ) a\\ U I c I 'hV (£ '~7 5 LCCT(F1rLD CLJT rf /Jd:CEs5SR ) .IC. PaŽ;^: rHR PLt (SeFE T. 3. FTELDCUr, TWT rG fI/7T H4 7H6 nA ErEM OF 7-WE ( FILL OF sAATtRI-l crjt. ' b-tT. 2 oF r ) NOTE ALL MATL TO B F 3SSA-36 U4 0 I MIhESrP~AOB.ND 3 DP I ? ION r-6 t It j I 'I t G .' i I At I7L' - I 7I e, L j/D, /.. \\ F-v 10 I I-8 W trNI Gh I -r-tr f ~~PIsPEgsatt c SY I ,lO7XA It4 VAL V F-0_ LOCATION PLAN L _<pp. -c1eN tF -NOTE -20DE 5-C-AS5 . xYX0 U) 3.5UISM5FC ('ATEr;ORYI e 7 F )R~~~~CEgi0k~dW "-4. 55 1 CE 10 ID Ic: Li) ) (I %,.rYLlt4DRCAL WALL_ \\ HYD RAO LOAD 'E.x.l I .s T F 'TYP T L ELEVATION A A (F -N:5Wu 35EW SUB) LOAD MARAK NO I-sn S t'fr5.5s UUD fiot F~f%11L 5T/'RtF55 CtALC-..VNEI /N1AIC R._)/ lv pj. c R lo.Kp-tsud Cz f a.Z F, I v.., o 0, I llf-fi BY I RsitL-Gl HOPI CREEK OE"EKATlNC rTATICJ AJ F F Fir(. I-I1& 2 ur4Ty i l OWOS I ¢ t r j s IPE SUPPR P1 efoiz BLDG. LHFC I -ftuJ 5uPPL"' a bxAtJTf JOB ND la855 DRAWING HO0 REV [-.F SFo J 0F-2D-w) / I 50- I -OF 2 t L .NJ "P4 11 V.r . _;,ml
'ER RESPONSIBLE FOR VERIFYINIG REVISION, SIATUS AND CHACk.HL JUG 1-P-FD-006-H022 002 1 PRINTED 20041202
- f0Vlal,
- 0.
I W
- ANIEUI CHA1TC'E DOr,-liY.l FINr11ECD 2100412;10 PAKRT 2 - MODIFICKTION PAND TESTING, SECTION FORM 14C.DE-WTB.ZZ-0003-7 MODIFICKTION DOC'UEFT COVER SHEET 5.0 FIvD 14
- H 3 8 CHANGE 14N.: 4EO-2-5G7 PACK.GE NO.:
03 CP.REV. NO.: 0 PAGE NO. REV. NO. 1 0 DOCUMENT CHANGED: DWG# I-P-FD-006-H022 Rev. 1 SHT/VOL I10O.: 001 (PROVIDE TYPE, NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUALG CmANGE TO BE INADE: Replace'eni:sting snubber with LISEGA lydraulic Snubber as detailed below : Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin l-P-FD-006-H022 PSA0003 305256P?1 30-1003-075 30-1003-075 New Cold New Hot New Fl_ Shroud Removed Set (CS) set (HS) Stroke Flp SruReod (in.) (in.1n__ _) (Y / N_ (Y /N) N/A N/A 5.B8 I . N Construction / DOC. Updater Note:
- 1.
"Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL ISSUE M.C. Chang 8-1-97 IT. Nickerson 8-12-97 0 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER NO.
SUMMARY
BY & DATE & DATE MCRs T Page 1 a'i Nuclear Common Page 2 of 3 (Page 1 and 3 contains the Instructions) Rev. 6
S ER Wc3 RESPONSIBLE FOR 1-P-FD-008-H003 VERIFYING REVISION, STATU3 AND CHANGES 001 5 PRINTED 20041202 IEtu No0 weo P U 0 FIG. Nt). Of SCA. toN W4.x 13 >C S~' C. LE N, C-) T lsr E-LV/ A_____ 3 ~ ~2. ) (. 2 2 / Y-8 *%4' 7 L. & 4 .2... -L 2 '. '- VY >L Tie'/ %9 .L rn E; ALL _(VJT'LTQ SE5A-Y,MUq-4p ~~~~~~STU = PROM. N. 4 3 ) \\, D P i1 Q LD Is-) O .'~s z~7 C I2.7~ OO - 7d Vd S~eS I LO(- L 6-r L A / oX Z 3/ b0 LOZATION PLAN 0 4 4 OTEAREA 20/6 / EL 9o-c.11 e .HAN CER CRITICAL. 2 ) D4:22, CLL SS F 3.SEISMIC CATEGORY ~ i Foai,4-IWI C T'" -FA" L SC-I IA A P ~ ~ ~ e £ I Y S O IB Y N G PULX*alli= uI.DrIMIC A= CWW catwJ3v} SYS ISO -3r -0 143K CMEEIK GEJ$-IATW02 STXTIMO PAEF. PIPE-SAN FAAUdZC SEEL C,- PPE SUMDORT - vz EACT,-, aLDG. c % $ S - ( t J ~ C T / A C.t .33 NO. DrAwimG No. A I PEV. !0655 (t-e-F-p -c o& --Ho3 C ~ r,.i An, TI' or 3
31-R RESPONISIBLE FOR VERIFYING REVISION, STATUS AND CHANGES N,5 1-P-FD-00&-H003 002 5 PRINTED 20041202 al,, Ga_ Ig. 187 i°' (E)~IBS) I i -1l ;-T0 ( -C -3I I a I2" - 'rr EzC. T~r - I
- mLL, rv, A-A y A mWf.,
- 0 WIZZ L Q SE-CM.
G -~ LN 1 f DS I MARK NO, I-F-2_c2-IIQ3 REV. _._P Pt I_ Y~'OSR ~ v.t>AreJ P ttl v s o., s ___I BENG~ PUMLICB ERVICE ELECTRIC AND GA COMPANY ,7 HOPE CREEK OENERATING STATION REF ko. 1 b 2 UNITS D Ft ITEEi C-07 5-1 g PIPE SUPPORT BLDG. NO. DRAWING I40. REV. F-K CfOSS-GONHfeT VA-CLUM 10855 I (e) 15Kw'tsmF0ls 0
SER RESPO14SIBLE FOR VERIFYING REVISION, STATUS AND CHANGLS WG 1-P-FD-OSS-H304 001 6 PRIIITED 20041202 ITEM E NO FIG. SIZE __DEs____AT_ J T L NO REO'o NO._
- t.
95o gg2GsLr ^//z soIA?--/ f 7^/539g8S~f-A\\'" 3 / / is/
- 25
/&4gT s7~d
- Kt
-45 $-r'J' e, # zo'/ A_ ff ~~
- f.
13'- I 0tAC CsLlv F5Mo'E Ig E0 LA) CU 105 r i i 3 9i 1 ? /2 / I t L TO / 4 ' x 3 j WA4 !J< L 0 1t iq,( FEl -CtJT1O 51T) £f.t SLt6 OC g Q. S Al L MAfL 10 fiE GA-5(p§ U.-j.QO STPES-PROB. No. ,8 tv19* \\SRt RO D ,f ft'RP -- f \\N e t >,v s7,90 Te-1 LOCATION PLAN Sf-t gAR EA0/El/] NOTE
- E.3-54fllS;of
- 1. HANCER
- CRITICAL, E$,3@
2 --CI) 0 t2,DE 5egC -2. AS S 2 NEO .} A 5O 3.SEISMIC CATErORY / -lye=4. FIlm.%= To CUT~ 1Q LA-r-Iv.tJ-r HYDROLOA _L IAIN Az-A LOAD rA L s MA Nsis O .I P 2 rcvOaETIE Pt IE V Il t PI._ ILK IM C L & 1 E p -TEW 7 SYS 1 5 i 7 I tt~l CtAfZ "tTREF. PIPE. ~~~~~~~~W S.stE 07-, IL i PEPf $UPPORT 2kICI RLDG.
- 424, cEaB2 COMMaZr V6cUtA4q 1 Z zeozA raeus "F NO.
DRAWING NO. IREV. F - 10855 I-P-FD O -A/104 (Q) L2_'I
.ER RESP04NSIBLE FOR VERIFYIN4G REVISION, STATUS AIJD CHANGES -v1G i-P-FD-003-H005 001 5 PRINTED 2'0041202 HO I NOlFIG llZ
- E DE5CRtt T10 AT ' L
.1 R_ FO. _sze__ 4 ~~STROI(E.&Y "00 r~PIPE._____ LOAD ,S ~HS HL Mt{ZSgEERATIONQ =.02p (Z57-fiz7 7 h4ATL PER B&PV. CMDE SECT. 111 2 45 (~x ~~x 6i C-C LZFIVsIr4 (£si=5,7L/ Z~~./w 4/, XL X 6'
- -C I-N r -)
STRESS POB. No. 1 x0:7' HtI. / e AyI 7 .srur Yc2.J V t4 oF. fT)E zteojr AOR / M65.Lf OF M 7O7. I // LOCATION PLAN i AREA 2CI 4i I NOTE 1.ANnER CRITICAL L( 2.C DE3K, CI.ASS 2 3.SEISMJC CATErORY L
- 4. FIIav 1ro cwr muL..
bo,wr LA r774 q 47l S1-L2/,i HYDRO LOAD flEV T 5 - ; S t O tt S lOA D PFL: SU"Cr ELECrihJC APO MWS ¢: WY __i__SYSISO_______ MM:K aEEK: GBEfiERTr 5T~n0 R1 EIF. PIKE PM I1t 2 L44 S^W fF0NM DeS.F~, E o 7o3 -./ s-tr, J &4e IE SUPPORT 2e.7-m ro No. DRAWING NO. l*EV. a/qw ceo55-cQam -cr 5 ~ K ~ ~ 2 A 7 ~, L /
-.ER RESPONSIBLE FOR VERIFYING REVISION, STATUS AND CHANSES MG 1-P-FD-008-H005 002 5 PRINTED 20041202 ITEM NO. aIG. SIZE OESCRIPrTiO, reo NO._ .L_. 7 LLIEL. E.G85414& 5~crlotvA - A = JE 5H T. / F ,5SE $Q~7.- 0J =6 Pi E I sI C N 5E PMLIC:E1FVlCE ELECTRIC AND MU~ COM-A ~ Y$IO HPE CREEK GENERATING STATION REF. PIPE_________ 2 UNITS "DWGS. SA)4AJ%5F OSTEEL PIPESUFZF.T I C7D2 BLDG J38140. DRAWING No. REV. /et CROSS - C0A.A/ECr 1 /4 1085 S p Ae~ E /Ve~i~i 7zI~ s I /' c N s -O BY CH L tueIC5~WcE3 7LEI;CAH G UY. r 6 .t.- *r~ - 27e!-~n...
- .o rtq~.w s
- <s~-;:t
JSER RESPONSIBLE FOR VERIFYING REVISION, STATUS AND CHANGES )WG 1-P-FD-OOS-H1005 003 5 PRINTED 20041202 ITEll,1 NO. FIG. SIZE DESCRIPTION l N. REDI N,0 ,~__ _--NO-- _55c TI .AI I REVAT1fEVI&I OtisEN __ L CERVir -ELECTFICAHOGA.bAY ISO._ HOPE CREEK GENERATING STATMO _________flip,____ ._.__TEEI PI SUPPO~RT ;edC7e SLOG. N. DRIAWING U0NPt.v A/ 2. &, o sS - CO, VA/3-E7 V 4 C UJ&/4 ~ŽE~5~1t24 7&eI$1055 I P-FD -0081/4'17056&2) .=4 =~~ __-n l S~t...c~-J~b^.ua_.wu~P~l+-olt\\J.z .et^...................... ,y...
!EII':ED) CHA4GE r£ I.Cl-IJME1JT II4TED 20CI41213 PART 2 - MODIFICATION AN@D TESTING., SECTION 5.0 FORM NC.DE-WKB.ZZ-0003-7 HODIFICATIO14 DOCU=EIT COVER SKEEET MD NO.: H 85 CHAN4GE NO.: 4EO-3507 PACKAGE NO.: 03 CP REV. NO.: 0 PAGE NO. REV. NO. 1 0 DOCUMENT CHANGED: DWG# 1-P-FD-008-HODS Rev. 5 SHT/VOL NO.: 001 (PROVIDE TYPE, NUJMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHI4.NGE TO BE MADE: Replace existing snubber with LISEGA Hydraulic Snubber as detailed below : Henger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin l-P-ElD-008-H005 PSA0001 303656RC1 30-1003-050 30-1025-050,L=5.5 New Cold New Hot Ne'" Fip SruReod Set (CS) Set (HS) Strokeud Removed (in.) (in.) (in.). (YIN) (Y IN) 1.8 1.74 4 N N Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. ORIGINAL ISSUE M. C. Chang 8-]-97 T. Nicherson 8-12-97 0 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE MCRs Page 1 x-Nuclear Conlon Page 2 of 3 (Page 1 and 3 contains the Instructions) Rev. 6
- ER RESPONSIBLE FOR VERIFYN11G
- REVISION, STATUS AND cHANUL;L VG 1-P-FD-008-H006 001 3 PRINTED 20041202
>. WEG'D Nto.c l tT L I E1 G 's Vq,*dB~tadi^n w/Pl ¢*1 CtG co)< 2 1 '/28" d wl 5 TOE ___ _rr 4 4 N t-I I2 '12 X 2 - O t1 "TDE E 2 ft9 1.2' 1~C Ey Nut 7 1 S DOGLE &hPipeCL-np F ____T 9 W/2X72X 7w{c ' -c .txE tEVATION AA) tO
- 2.
_,x t5 P-?rac P ___ NOTE: ALL KT'L TO BE SA-36 U.N.o.
- , 7 'r[8 1
I SIRESS PR I 7X. J 3-4 a) I /I 99- *7J OB. 1NCt. 7r 7 (TTO LI /Ž- PT 'i W36Y3oo "Q:_. r R~~fFAMING DETAILf/ EXIS EE DWG P OSD2( MT ) LOCATION PLAN
- 2 t~.O~4M iPEAREA20J/911 1.HANCER CRITICAL T
Z 6 W36X - .2CODE SEOCV21 CLASS P )7r'iv4PTE 7 / qlzg 3.SE 1'SHC CATEGORY E36Sr ='& EL. 84'- Ii S RZ= <?s852. 6 " PIPE STEEL LOC PLAN T ~HYDR UYD( I w11
- i ELEVATION A-A PIPE LOAD.AAL+/-
L MARK NO. I-FP -oo--Ao6 \\\\/ssu ffo p' CIN 4. d rkl j CS ALC 14/ 7~OFJp 1JJ,0. 1 OL. Ft VjATE RE V IU I O I 7 B c,6-ft ptuLi. 8mv='t kl J X= CJ CDWLuY SYr IS o XO= C4EEZ GMERATWG STAMN REF. PIPE PE ts;. t a 2 FtT DWGS. PIPE SUPPORTREAGTOR BLDG. JONO. DRAWING §0. REV. R.HARCR05-COVVECT WC4s 1/f553 REA KER5 FROM _O/U _p( RT-657S 4
JSEP RESPONSIBLE FOR VERIFYING RE\\3ION, SIATUS A14D CHAINUU' IWG I-P-FD-008-H007 0CI1 6 PRI1NTED 20041202 ITEM N FIG. 1 SIZE DESCRIP1 ION ,.c _ 'REO'Q T _11 _ t59 -,A 50 /240 ' A / 5/ZE 3 PiA-e 6 2 <'P/,ds ASf _uP,~ ~# i- --.~' 7 fr1cC4-'A /C4 O 5-/=CA AzZ45 7o, _I_ 34-z 2 AS 5~O Xv 7 3/a 3 -l e',.4 3/a X' 7 r 7 ~-- . a I - - NOTE. ALL MAT'L TO BE SA-36 U.N.0. _4-ETI /. [/SEL (9, 8_ EgiS'r Lot2x7Z 3'.2;l wtl-p-F V4 -9 NFLq - 7 N I 1t 2i EC-T. 13-/ E-1 t $ 8~~~4 l -PF-°Uo Lb-REsSs ROBA4O. N & Dp H7 i bT W12 x1ig IR ~ II m s 3 X UGR. Lo. 3 L OCAIlU4 PLAN AREA 20/B/I NOTE i.'IIANrEP Cf R I 1 I CAT. 2.CDDE5E;-.7I (;.rA5s 2 3.51:1 SM 1c r'I(t;(.RY M A MARK NO -L FD-008 -tO7 ELEVATION A.A I I. F) A i4-7 377Z7 r~l 24 tE6 S D A-Sgf 1 -Jsc ~sI w S
- !r, W
_t_ F V I S l.D S BY H'K E(
- 5 ENG
=Lr-StlV= EL*CtC AQ COM 0JY SYS ISO Lj-BC-06 REVJ' t HWE CMEEK CENERATING STAXN (TREF. PIPE &= I a 2 r .1 DWGS. STEE C- 080-/ 5 RE PIPE SUPPORTREACTORBDG. JOB NO DRAWING NO. REV R.HLR. CROSS-CONNECT 4CUVM 16B355 I_-P-FD-o08-8107(Q) 6 BFEIKER.S FRL,/4 TORUS_
JSER RESPONSIBLE FOR VERIFYIIc; REVISOI1I4, SIAIUS ANU CHAN'ITL ,WG I-P-FD-008-H0O8 001 3 PRINTED 20041202 I 0L lz -r r 4 7 U p.. -4.
tL) t L t 1Ib LL tIUr V L Ir I II 1' Vi NP ,- I Ai U. A%4Li Ml Vn'k7 viG 1-P-FT--005-H009 001 4 PRINTED 20041202 ,{. 1:1G. l St2E OESC tFST'L 1 1 i i 51'5! / lAY STRUT ASSY, O.D. _PE 1 - *_i
- 0. 0.
.~ .ol -16e t g;, 5 ov 240-0141 < /, _6# ~.ef4'~/-? I I I I\\I-c*- STRESSPROB.?IO.COO--Q & D.P. NOe a 9 17 )+/-.co) -x T Z (t.C02A) CIZ )30 (a Ii'or,5' .ELc-I'/p LOCATIDN PLAN tt-6 U"PIPE AREA 2 O/8/i NOTE 1.HANCER CRITICAL. 2.GDE SEC. T ClASS 2 3.SEISMIC CATECORY / MARK NO I-FD -0086-o9 x I a m r4m N;i-ELEVATION A.A ( EAST-W6EST REs7-RA/NT) tha5M To W0c9. Ad-5tuILT Fv. 0. I AT "'*t v I it I o 5Y Uc CUM cursYstso I-P- BC-Q-6 RCV.L H;Oft CMEEr 08oCtATO TAM FIER TE I. I,t1 WCS. P SEUPpOR fT eAC oKBLDQ bt NO. DRAWING NO. REV. I HR CR°OSS-GOc14 tCT VACUUM S I-P-FD50D--qHO?(Q V I.. E611\\ERS ~ F- 0Ml 10 P(Z
jSER RESPONSIBLE FOR VERIFYING REVISION, SIAIUS A1LD UHANCr4G~ )W'J 1-P-FD-OO8-HO13 001 1 PRINTED 20041202 14=Lr-=r rll-IF .----.-,M -.
ISER PESPONSIBLE FOR VERIFYING FRE\\'iSIOINI, STATUS A14D CHAN-GES )'WG 1-P-FD-0CC-HJ013 002 1 PRINTED 203412912 6flTID A - MARK NO. I-2-6f_ .Je. Vvn' 6NF I ,£ 2, 1-4gp m ) F Iv ral ^ g V I I I o __I I BY HKEI JLIC I ER VICE ELECTRIC AND GAS CDM.ANY Ko P IPE HOPE CREEK GENERATING STATIDN it. I A 2 LW ITS 1 F STEEI PIPE SUPPORT rAc-r BLDG., JOB U. DRAWING NO. REV. IRZI 66SS CDiECT CVAUV 10855 IP r -I -44z-X, - -1,c-- r7v=; - r.v 'lklvs-,= =mlliUil, F . ;,I. ,I,.
SER HL'-I't)sL0IBLL HJP VLEIFYIiH'Jj VLVIU\\. bAIUL ANU LtAIAN'oL vvG 1-P-F[I-0O8-HCO14 001 2 PRINTED 2004',202 ItEhw -L G. t ItE _ L _ 7 7W/ Roe 1A 2 o ___e_-CAET 51Z-3 45 A A\\27 I 1 x 2~ 1 x/.44715"LG,. (ro .lrr 5u I W&iS./"/ 7 /A"LX/ O' k~ A/ Giu/ p /' X x 0-L 6' D,/ ) 6 F 137Sf)5C 7/#YA2x A-(5.E" C5-g') ) I fe 1 i Z" e14Z 04654-j L XoAd./Cb'?Et cT OU PA(*. Mp U) 0 _~TE~t PLA /4L W~! o' UD<L~,N/JZDcr0/ g, evo .#,4 f t1 r ,C)^SA-3C L,-A S~ESSF06 + p*-.'. rCt Ki 3> 5../ 1 -x " T--t I /a) .56 DE61AIL I k&," 1-i / fK 15, °F- %vg( I I I I& v/ 1 f-4 \\ v-Fo-j9 ILOCATION PLAN AREA q9/B/ W. EL.B-/O,_-A I*TE 1.11ANG.ER CRITICAl. Yofo 2.CDDE -ri7jI CI.ASS 2 PIPE VA LV F'.SE:IT" CATECORV = RoTATECD 'N -S9 D*OADD mAR No 1-F-.) -o A-H 14 AtV AU P I V I 0 Pe S BY b'KSENG BY K ? E T L U = UIL=:= A Et ~f l SYS ISO/- P t C-°S(Y I S MOM CMEEt MRATP STATM REF. PE
- 2. ia=
OWGSI STEU C->o7-5:!'v.- -PE SUPPMT R6ACT? De R0 MAWING NO. REV 2HR cCROsS-CONIV6.CT VA CuUI4 10855 I-P-FC,-008-H/4 1 2H1; SIP T. O F
JSER RESPcONSIBLE FOR \\VERIFYING REVISI01N, STATUS AND CHAN4G7ES )WG 1-P-FD-00-H014 002 2 PRINTED 20041202 IV, S1ppe.. ( 11LVSE ZV X( Sr-CYLIWPRICAJL WALL PLAQ STiEEL LocATIOM MARK NO. /-F) -00'-w11 l4leS/T. / oF 3 Ii5t~iS o~gl
- v. AIsJ
^ 3 v, s *o VA
- ll BY 1H'KOES1LPVENG PLILIC CERVICE ELECTRIC AND GCL COWANY ISO KOWE CREEI: GENERATING STATION REF.
PIPE-NOS. 1 & 2 UNITS M F tTEE' PIPE SUPPORT ECr,. BLDG. N DRAWING NO. A HR CPOS5 - Co,4 rY YAC UtLh 10855 (-P-F0 -coo-H 24-BsRFAeEPts F;i9m -frotS ____5__£ 2 or 3
1SER RES PON&IBLE FOR VERIFYIIAv REVISION4, STATUS AND CHANGE r )WG' 1-,: -FC,-O'-HDA 003 2 PPIIIED 2C0041202_ i '-TA C, W9,1Z 5X7'Wge A IU-62Z 7' V V.' $a
- cjl, (MI,4.
2 Ir oc -) DE TAIL I I Of 7A / I . LE7,41/- SeCT B3-B T mo@v I. - 's>1j JEc SqEF- / oF.3 -- i ",Ss I Jv1 i-r ! r.II rP It C v
- e I C W. V IBY mouc m#t cwpvc
"=C. omoa= NOR M GVERATM4 ZTATM -IF 1 L2U=Tt i I PF' SUPORT REACTOR BLDG. ,eHR R - COvIECT VACUL/lh
- 1A<
5 pe7r1 eus 10 85. 10855 RFEF. PUt.-. _~~¶ DF.A ",V% v.< CM V. ) -F-,CC) -0 06ef14 2
- 2.,-
.L r
SEfsRt' Ht-O'Iow--LL tD1I' VLHIETINU H'LVIltIN, ;ilAIV' ANU UhANML:J O/G l-p-mD-oos-H015 0C01 2 20li. G-041202 r _O FI. ME:...-...,,9, =4-" STR KF. W'ADDITIONAL REAR BR~~ LO I V I.U -uzG, SyC. I1 L r- - OrV 3 75 bwS)55-!L 8 F1CU tT 7V $Ul I ' 7-z 4 x.V X ?3-4s{/.. CLT Tt7 5411 7)Zz~s; Ps I r4 tf 7"12 "X2t'- os __ -T-camz 7-~/^,"/,q 7,1a rS! sy0 a3 - lr-ws '7 -,-0 /5 7 2 v m f SrE Prim. uwg@C-D, OP. H4 v 7 76-3e 1 I f __= /1 ,6@ Lr-ATION PLAN T g ^f W s L zARtEAD 1611 I Ct6t.HIANGEP CRITICAL. t1< 5JEX002 tF/VY3.SEISMFC CA\\T£rORY J >1Ir .8/rnotZlFORC WT 16s +NRM Ib CZ ma-tSl HYDRO tOAD 2oc> SECTIDIV - -- D MARK N VI5f: t~R rCH-2 P-74.1 t &Col$P~-VFC4. 3 2rsfi1m rcpat ^t
- ct" P'JBY
'-MDNHGK~-- p' '-_ - "= CfT= sA lmfPzC-16 com wv sysis OVOKE rEEK QMATM2 TTATM~f REF. pipe C= t L 2 Vx= lOwl-AS SEt. C - 0f To{ 2 5 RFNSE VJ-P0;
- R6WfOR,
,LG P.H.I CR. 5 5 - CO vMCE C a flAMI AegRF" Sp~ rkW4 -rpts 1:.0c NO. DKAW'ING NO. I REV. I' z f(0855 f-P-PD -006-HI.F.Fa)I LLo I I_. ^ _.A e .11111".Mltllm 9 1 m- .. -. ir mazy - ?= -f Z -z' 'fXomow-O.:-N ; C 12 imapel-containedionithis.mic
NLG 1 -P-FtUi' 'I 5 lE t 002 v Fit 2 M., rLNVf IZ2U0, 412 2 A I 1,4U ItA L: fJG: l- !-FO-O -HO 15 00 RITD20420 I. J it Ii I I11 4 i .~@ Ii 2 5T p~*U u %91IL~rA ho VWA CLW wn G.* z I= -A C
- ~~;
1~l~c~t~ti t t raiicrofilme - na'ouol tismir
- SER RESPONS&IBLE FOR VEFIFYING-. RLVISIO'. 'IAlUS ANLD UHAN',Lt
- WG 1-P-Fi-008-HO15 003 2 PRINTED 2004120^G A
_/ 1 NO. AFVPc S& .P 770,' V IrVA' 7 / /37S_ S/4"Y 7" J,'ICML L/-8VLT' 4 B-7__16_ C 7/13,,5it. D 2 7 112" i-v//IEX AuT5 8 / X 3 i 5 / // 2 7'4x 3 11 O-3 117 12 - 6 X 12X-Z F6.FLP L/T _O ) 70 /3 / 73 S E x 4'12 "X/'-8" Z /4 / l/l x1'-2 "Zil e /1 / Q g' A4 6(iclFZ 0 7D _A J el 7_) L. .4T4 fZ -"~mz 6'Q -f.fRS z~~ __St MARK NO. /-F-12-// Am BY H'K EOOVENGP' KM LIC ERVICE ELECTRIC OkN GA. CDW-"Y RE________PIPE____ H-Df-E CREEK GENERATING cS(T1044DWGS _RA.1rNG O,. ___EV PIPE SUPPORT REA~CTOR BLDG. JOB 1O DAIN0O.RV R,~AR /y, R-CROSJ -MEC S: S., I' .5 .r. =- -.~ I ___).q~JSS -1 = -c'7.H i = 2 .'a--cloliv l V V'ir, !V'Mi AwW; 4;^ =-j 4, wAi. j.4i
,MED CHAN.GE DOCU4ENT I, :TED 2OG4,_210 PART 2 - MODIFICKTION 1fND TESTING, SUCTION 5.0 FORMt NC.Dl-WB-.ZZ-0003-7 MODIFICATION DOCUMENT COVrER SHEET MD NO. : H 86 CHAL4GE NO.: 4EO-3507 PACKAGE NO.: 03 CP REV. 1O0.: 0 PAGE NO. REV. NO. l DOCUMENT CHANGED: DWGV 1-P-FD-008-H015 Rev. 2 SHT/VOL NO.: 001 (PROVIDE TYPE, IUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE MADE: Replace ei:isting snubber with LISEGA Eydraulic Snubber as detailed below : Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud / Pin l-P-FD-008-HOlSA PSA0001 303B56RC1 30-1D03-050 30-1003-050 New Cold New Hot New Fip SruReod Set (CS) Set (HS) Stroke lp Shroud Removed (in.) (in.) (in.) ( /IN)1(IN) 1.6 1.91 4 N N Construction / DOC. Updater Note: 1
- 1.
"Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. I ORIGINAL ISSUE M. C. Chang 8-1-97 0 T. Nickerson 8-12-97 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE MICRs Page 1 Nuclear Common Page 2 of 3 (Page 1 and 3 contains the Instructions) Revs. 6
AIAKED CHnNGE DOCVUMENIT HilJrED 20-04 1210 PART 2 - MODIFICATION AND TESTING, SECTION 5.0 FORM NC.DE-WB. AZ-00C3-7 MIODIFICKTION DOCMtIET COVER SREET MD NO.: H 67 CHANGE NO.: 4EO-3507 PACKkGE NO.: 03 CP REV. NO.: 0 PAGE NIO. REV. NO. 1 0 DOCUMENT CHANGED: DWC-# 1-P-FD-008-H015 Rev. 2 SHT/VOL NO.: 001 (PROVIDE TYPE, NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE IASDE: Replace eXisting snubber with LISEGA. Hydraulic Snubber as detailed below : Hanger Existing Replaced by New LISEGA Part no. No. Snubber Snubber Pin Stud I Pin I-P-FD-008-H015B PSA0001 303856RC1 l30-1003-0501 30-1003-050 New Cold New Hot New Flip Shroud Removed Set (CS) Set (iS) Stroke a / N) AIN 1.6 1.91 4 N N Construction / DOC. Updater Note:
- 1. "Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2. "Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns.
3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. 0 ORIGINAL ISSUE M. C. ChAng-1-97 .1 T. Nicl~crson B-12-97l REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO. SUMMAPRY BY & DATE & DATE MCRs Page 1 1~. Nuclear Common Page 2 of 3 (Page 1 and 3 contains the Instructions) Rev. 6
ISER RESPOWSIBLE FOR VEPIFYING REVISION, STATUS AND CHANGES WG l-P-FD-006-H020 001 4 PRINTED 20041202 ITEL' hO IG 5 lZE o DEScrUVTION MAT' L 110 "Ea 0 HO. __T 1 1 307 7,/9 MECHANICAL-SHOCK-ARRESTOR. = PIPE O.D. - -V2. ,STROKE.
- 2.
/ MV3 , iS ' V 4(" ? T. = I LOAD = -uL, W -8..4g ACCELERATIOt'=.02g, MAVT'L PFR P & PV, CUDE SECT8.11 2 TSG 6G X 6 /v 0-4.S G'R.E (Ft-,curjcuA-_ .4 L._ x i .5._ No' 3LL1A ' 4 SA-36 1U NsoTES ALL. MAT'L To BE SA-36 IJ.N.O.___ _t.f -- -A _ -'1-LAr JJ 0-S T _E, PROB. - (. STRESS PROS. N10.4&L 3-Q , P D.P,.LJY 20 +/- 1 C.12q Lo)
- (t 14,W)
Sk m Ii .a*<D> IT _ fE .I,. EL t-1-1-\\ LOCATION PLAN AREA2O/B/l I iNOTE 1. IIhNER 'CRI T] C'Al.
- 2. 2 mDE 5ECTIT CL.ASS 2
3.SFJSMiC '.Iv-rI(lORY 1 - .. 4fL s
- L1Aa.4T QT L..
t T FOFME itl .4 c I JI(CD ED 1 FAtJ¶U ELEVATION A-A (E-w SAIL l.5AvPSME frV~k Fr->R.H-2i99 265EJR 5) M°I-FD-C~$-H20 f v : L UTI 41A I t/ T MCv AyT R 1 V I 5 1aO I S BY KPE AN fUaLICtE ELEC*CA CA JY sys IlSO 1-P-B REV9 W`E (MEEK GENERAT)G STATKM ____l_EF__ U P e 2 .ls F OlSTEEL It73s fSRc PIPE SUPPCRTREACTORBLDG. .B NO. DRAWING NO. REV. RJ-(R. CRo5S-CoNA'MECT VACU/ML// 5f0 f5 It I--FZOO6--/2O(UJ9 4 BREAKER rtO 7zU - /, 4rcg>q, 4-. t
JJKED' CHANIC.E DOCUMENiT 1IN4TE-D 20r041210 PORT 2 - MODIFICATION idX TESTING, SECTIOi 5.0 FORM NC.DE-WB.ZZ- 0003-7 MODIFICATION DOCU1E Nr COVER SHEET MD NO.: H 84 CHANGE NO.: 4EO-3507 PACKAGE NO.: 03 CP REV. NO.: 0 It I 1 li ou2/ PAGE NO. REV. NO. 1 '0 DOCfiriENT CHANGED: DWG# 1-P-FD-006-H020 Rev. 4 SHT//VOL NO.: 001 (PROVIDE TYPE; NUMBER AND REV. THAT CHANGE IS BASED ON) ACTUAL CHANGE TO BE MAfDE. Replace existing snubber with LISEGA Hydraulic Snubber as detailed below : Hanger Eristing Replaced by Neuw LISEGA Part no. No. Snubber Snubber Pin I Stud / Pin II-P-FD-006-020 IPSAO.50 301856PE2 l30-1003-0381 30-1025-038,L=4 New Cold New Hot New Flip Shroud Removed set (CS) Set (HS) Stroke (in.) (in.) (in.) (Y I N) (Y/N) N/A I/A 4 N N Construction / DOC. Updater Note:
- 1.
"Flip" refers to whether or not the new snubber body is to be reversed from its original position.
- 2.
"Shroud Removed" refers to whether or not the new snubber housing is to be removed due to interference concerns. 3 "Flip" and "Shroud Removed" condition may be changed, from what is specified, as long as it is properly documented (as-built) on this MD. 4 Remove any design load information that appears on the drawing. 0 ORIGINAL ISSUE M. C. Chang 8-1-97 T. Nickerson 8-12-97 REV. REVISION PREPARED PEER REVIEW INSTALLED INSTALLER & DATE NO.
SUMMARY
BY & DATE & DATE MCRs Page 1 %-11 Nuclear Common Page 2 of 3 (Page 1 and 3 contains the Instructions) Rev. 6
FK'SFlv)lUE~lSI1LL F()1K VfLHIrYIJ06 HLVl~l(N, 2:;1AIUSi ANL) CHANUI'S I-P-FCD-DL)6-H021 001 3 PR<INTED 2004120" l ,olANrD 5 tI_-E DEzrolr. ION 1,VT'lL -l fy
- iB Sway S trut A ssv.,.$
e L EX&" M Lo;ad-:- 5~v _VlT s4-t1 X c-c L!;. ('r! &f;V. A -A ,5r4. Loc, 1LAt) 4 4-t+13 7T-5 C - Ct. ,( SEE IFJrE--L Loc.---PlA). 7N~ 4tE ALL MAT'L TO BE SA-36 U.N.O. G -~ ~s. NO Cof Rl1 S S I S D ATA PO0 I NT -21 2 k l +/-.,Di67 +/-2T& ,,w~i,8'\\ te~s. IR i. -x-' \\ 9 J2) /F< t WeAa Af t ^:lI-MAXIO-TtN PLAN -lyfl -V' (-rP ) 1 1 - N)T ES-: FJ8*1. HANGER CR IT ICmL t _ L I2. CCDDESEFCMLAU Z _t A
- 3. SEISMI lC CATEGOKRY I
4 W t+ Llrill0R UFE OPerATOR 4a5.p~~~T 1i/5~g1Eg OE pD7A,-rD so° (FF1 R 3 rA8 Irf PY01. 2g D Sr,6UL CU.PAA ELEVATION A-A 72-2S 1 01:5 1 vcqrT/CAL E-S-JRINT ARKA R NO. lFQ-o-2 nEtVlDATF r I v I It I o N a JBY K E i ENG s p-eg%<. c,' 7 "O H'E UkeEK GENERATING STATID l REF. ME JSA fm* rg. STEEL13/, FPI PIPE s5urDORT REACT09, E3LD MEND. lDRAWsING NO. lRS lR~tRcRC2S~Carlgc qucIC)85 lIP-F&oCHZQ 616_e9 FRM 7oU it= Ib i.* r_,w c..... , I ~ l .1.
H-1-FD-CEE-1879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damage in RF12 12/12/04 Revision 0 Attachment C: Lisega Snubber Outline Drawing JRA )4 A-Si -.-rm P"twe'"ST prImei ,-rtc i, -1 Rd 5 3Z; 1013 120rryJ Ut Div,", nd A V& -tM 4-,3(2, PU4 v (!2 ns ),--r. rrvrlt A 716 -Yk) 3U MCM 131 _WX5 Ircn SA IM rc
- CO 31AS VIn M
-"31, 0i mmiftor k, 0,96 X)f ffa 10 172 FIq 10 igt !$ 141 sit M c 3114 on Sara& fS
- d-15#V IN1013 131 A 'M lu 0
(I-Was M10 XS fact'; a rtd i "if, 54 f.?-'# :-4,4p 7 fU-,0Z:Ib, CIS 'U.*51 kywz:Vrf L-d 7vdaurq 1a Pt ir-A
- 417S 2--ntrA -.4r--
TY
- M-09.
VItcrI.-brcf 174 f 173 472,4 Mad qevb-go IN 2 7fKi 1159 Gey-civil A.'Y F r., f 1 _;CP2 V.-cc,,Ze,Itrs tet 173.01 30 72 3 2 2 0 1 3 1) Z A EM T-; 1.1 AWO' e- -1, 3* I V LI 5 E la Fa I HAVtSion E.7-11 Page Cl of C12
H-1-FD-CEE-1879 Hope Creek HPC1 Exhaust Piping Supports Analysis of Reported Damage in RF12 12/12/04 Revision 0 r" V11M 'Os 155t) 112 I f0v air C"Fwc I e, - 20;z man 2 vnm 0 ryhrom Fd to - ff4 A RI M-j CO 'SS A M-AM TA Y*c &fmave, atrie't 72 fm 0 X- -!6 OS ;'If A, 117 711)1 I
- 4.
54 In rl - t 3710 010 Pw V -6,2 -;Z-4 -. I. SqM-C 0,0 31war4t. gry'Ya I- -t 2trr II III 17344 w4hikutrn. ,I;nlf* SA 'r. FG 3 Et I 31% RMW cesworr 2J L-FQ6 D-,-OU;N-05,9 M75 fine rrty -,rtaf vat re $,-O 779 0 W. 1 rw!.,Tl-RN 13101i-!- W Ls wM VS f 'O - PrN 3 2 AA V ~cw J.- ,Clear -.'x Owl-P M11,77* V, rF d j 'T V LISIEGR Page C2 of C12
H-1I-FD-CEE-I1879 Hope Creek HPCI Exhaust Piping Supports Anal~ysis of Reported Damage in RF 12 12112/04 Revkision 0 ,L% 0 _a~,_ibev~S ta................. _o0~tw5_...... t1r;3~teSA , 1;1.ett _!..A
- fi4~~~~~~~~~~~3r.ttq.l..........,- --.-......-{f-2'.w_,t
~ ~ ~ ~ ~~~~~~o '.C. b A f_._. i ] -o ~~ ts l._ _.* twr tSe__* .~~~~~~~~~~~~~~~~~~~~! -. it_ -Umttt fftt , _rn5JlvD 3_P___
- i,329**C J??,
i Rnn~~s~fnsr a.2_ fla~~~g.-vart 3 4,_ s. t hed Sh e._4 tmrhto.y F D-tl1111 irkt nV !^t6-*,n. . tOz ! ; 7 l.1r lret...... . _ss. I._ __S@>{ez t7.nit7 ,t,i ( tr~P,, s~~ (t74k
- r.
ofw.8;. _p-bl 0.0:I3C X_., .6-- _ W t t ~~~~~~~~~~C A E,[_ 0ti ¢,X, ', r.tre,,I l >>_r r ~~~~~~~~~~~~AYo .- 1e* H d5fZSZ,_ -s _4 Jl i i-6¢ _I 1,, __._~ j,_&. _.,& 5._ tI LI Kr Page C3 of C12
H-1-FD-CEE-1879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damage in RF12 12/12/04 Revision 0 327 f 4 -.Z' 72 t-T,FTO-- fUrivirpist6n I rM 0'69. IO f3f A 73' 140 37217 ?V;Z !MCt in, T.",( )3irlf ithit AG F3. f4critt W, tnzi M.- MS 0: bmvJ "cm..72M -Z__ 5-winrM 'etrive to" tc-istrudion.1m 61 rL-Dt ;*Xt 4 02W !Z 53 r I SA It? TP 3N Q Pd XQ 15 foil MO
- C.
e Si .qf 44 1417
- t410S, cf--rvc rf "C' Z1,
- YX-;-
f999 Gr 3 Z Z 0 3 0 7 Z L I !S F-G A Page C4 of C12
H-1-FD-CEE-1879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damage in RF 1 2 12/12/04 RPv;t;nn 0 3 M4 -,'O 77 A TX I $,.less 14 4 - 51,57 MV e ZlVarf prar-sq" (3t5"t) 47 "L WWI U C&O CLF r Mr-ml nit af z Z IM W. k t I St '!,P,) forr W. le M I I t bp !Cru C2-m-i Po-, -rao 71 I 1410 1-91 e's UT" 11440 13 190. I&S f63 270 .,k347,rp -IN rwr Ever SSA In Ms C1.11 b'd A 71k-", V7 rvi Y;Ocrt) lit 22 -7 '-M SA Iql 91-4 CLIJ -n; A vT claV--ge-S:t e On C -Tor. S- -.C, C.Yd. "an 4- v C IFRS Lbrwr P-- v be -f C y08-07 .13U iu G S .,ef -77 0 - F? 2 CI _--cvl4nl. L15 IE IG R LWL rf.- e Page C5 of C12
14-1-FD-CEE-1879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damap-e in RF12 12/12/04 'Pt-11;c;nn II IALV c3n -d-7-L -- - t N r 1518.57ml-Cr 6 nm 1 F'j L-M mA vriv TetvLy; Khstmoe 18 VIY!n N"Jv tmo;. - 221 1 -Am St] mi - C TM 1_2910. rold)nq 4D of -etas I trqla -P 21. to I ?".Fe ;ww""m M 3'rairl L I t Ikt t rI :t'; tl) F 'ES IS I 15 Thin 76!5517 -Cs .7;m le L 13 F prkslcft ILISE'C-A IV.'Y ne r0cl A 41 C')cm I f 49 06. j 22 0 2 FM VIL I 5 F-G AV Page C6 of C12
14-1-FD-CEE-1879 Hope Creek HPCI Exbaust Piping Supports Analvsis of Renorted Darnape in RF 1 2 12/12/04 n (,25 75 - 2 P. 1 ras S-ans LE i I an 6mbdiff lfhrMdrdv;'7 73 T cr :.cn 1.,e I L tIF ..gfo r-rw7-j'v USEGA ID?!4 hp Stuckr MmNltps I n M 05,03. Su 72.6 2 2 -0 3 0 7 2 AV Page C7 of C12
<Z. CD 4 14.-n tU (A -t I o ~ t'Jm 0 C A-m st ~ O nv 11. 3.3 3.5 3.7-
- 3. 2 C)
Co 0 CO co 0 t ;C7/1 ~ ],pD IMCIn.Ot? -15SX0 1Bd 7t5I',#~b 72 _gYrtt 1_ = I.........
- 7T,4k-,O-;~xS.........l*Wiw f74 I ?tr@
21 &bQqs:9t~rfit 13210-t6;~ 3 4 0F7-2 3 ! IpI_ M U,__ I '= re~ I j39ec25~,rug ___________1 wr t.- II7 P :4 1 L L-L....H ___1__ I .*.H-. E - '3 O. 3 L - 7 ? rII I3Z-7 CD 0UK cn t'3 C0 I_ I Ir~g& 11j O=-t ..P sCtufOvUCI, augr. 3 30 r2.c T?:>7 I Ochfm-Ala:mo I- #*O il I .2.2401a 4o 772 1. rwss. l, 4_ I- I g7X 7 i /. l 4 aI .yC/ I eraa. 12J.?i4i i TurfJ _s ceorial 1 27t07 L-Z -i .1 2-a p .,..vw....,.,, l,
ID i- . () t CD t 3x 0 Cj2 o 0 ~ ~4. o Li co I 0 0 0 . H , is s po, 0Ii 1;77i 5 U6
- 77L i TlOw7 i
i viI.7' v tLLS JM.t
- *'. ~ J a $ ~ L i 5 z J L
V ib r s ^ gn !NL 1 i L L 2 '. 'ie I 1 i t r k r L -. Chien i irkerc en ' j I t ?r??.2QV SPCJ a :cflfw de~ nr bri Is':r: Cl C; Wrtxpje~i;j -. ^ Ze~cji;s tr.
- v E
'ost.ec CNr. Pac rt
- c. *t We° C
Uib £ W e 1-I ,.e:/t .d tb .ftw ."-Jr OIN r:I161 FYsIu dD' reseroir Specfltrkoibeni, 6u 5 30 72.5 0 rsvl 0lE VIS]rp 7:1 IB.7 i D7ur I Nftnc i '1; ?7 aaarbl. I I tir i n fl S- . v 8:.2 i I~ or j Ietvef§+
n gcss;ni frurne de 45' umr 42;e verset2z gt eidnei
- >oO CD.
= i, Z
- ¢ CD 0
C f C D 0 CO stz old U 00 Q1 14 6.1 6.2 - 6-, 63 H-I - /r j.-. 'I I I !I ..) GQ CD 0 0 C-) L
- ..F miung 4 r9
,V X? { 9hz r', R"C f r i I I nI 4 I I I I I I I I CD tlJ _s. O O (O 4Ick 'il Z -7
- 5.
/ .. fl*i Io~y I I. I 5; -t ,,It I I i '4? W tg71-mi W77. J *J-fI-
- J. *.fl9 I
I A I 3A224-4-C02 'to 'Hoom? I (rst. hcitysi.10 40,f 9. S,,,. ze;CAAV" gJ, Mr. tevJf. It :.- ,HWoa J lL^Hcr E-WOee autiob L - ,Lret.iHcr ______ f_ .Lt IOb L - f Vw manf ,sT-I 76d ,,poI t:1,70 A=rOa,c:, nm SChuf.- tzO;r, kna.01, .?0 72. ! LISEISFI {V 20 72A fPR, I DVI:UM I l'i,7,e
- cw,
_~~ 1I -.t I d* , I P -u 3 2 2f 3-4-2 d07 021 0 -~ A.
(T) -, I i > Z -3. 0 COD r4 00C 0 M (d2 r-: I t 'a. F,5' CM tqC 0 tI -_'IO C2 0 0t-8.3 0 CA 0 0O d-f1 2 5UfP-er2 ,A
- t
.v c Yu. Aes .w M, 'Ientn r.!
- 5b
~ §f;~ts n fi con;r¢ L ,,flcle cow 02tdet VW 2 D'§ °~S 7!9 S_ VPJ LIS E U R 3 a C",i7 ~ 2 cr Nam f;wj'nrnj~ e 5-1 3 4 E 5 Z 5 7; 0i
H-I -FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Damage in RF 12 12/12/04 Reviqionn 0 1-Rvk, I ~.
- ,.F lr.
- 0LI-2 Page C12 of C12
H-1-FD-CEE-I 879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Darnape in RF12 12/12/04 Revision 0 Attachment D Causal Factor Evaluation for Pipe Support Observations Possible Cause Existing Data Supporting Cause Data Required to Confirm Cause P Existing Data Refuting Cause Data Required to Disprove Cause Tandem snubber test failure (1- -FD-006-H15A & B) Water hammer overload from piping a Both snubbers failed in an damaging snubbers apparent overload condition Inspection of frame, pads, pins, and devises showed no evidence of impact, wear, or damage The piping support configuration on both sides of the damaged snubber precludes overload without damaging the adjacent supports. The adjacent supports have been inspected or examined and are satisfactory. Hydraulic snubber test machine anomoly Previous and subsequent tests were satisfactory The replacement snubbers passed their test requirements Snubber internal active component Lisega tear down indicates Evaluate extended HPCI run failure internal poppet sticking and a entering R12 and assess impact mechanism that permits failure on snubbers on test machine. There is no physical indication on piping or pipe support frame that suggests a high load on the snubber There is a cycle limit on the snubbers. Extended HPCI run entering R12 may have affected performance Snubber as found setting not pe design(1-P-FD-006-H22) Error in data collection ISI records not complete ISI complete NUCR evaluation Some evidence in ISI records and establish condition at shows the snubber has been in installation 20210035 this condition since installation Disassembled and reinstalled with Pipe supports not always treated wrong setting with appropriate reverence during maintenance Significant rotation of piping and valve due to waterhamer The valve this snubber supports is vertical Adjacent struts and clamps do not show any evidence of rotation Page Dl of D2
H-l-FD-CEE-1 879 Hope Creek HPCI Exhaust Piping Supports Analysis of Reported Daamage in RF12 12/12/04 Revision 0 Strut misaligned 15 to 20 degrees (1-P-FD-006-H04) Significant axial movement of None piping and valve due to waterhamer Rupture disk failure wvould be Confirm rupture disks tested likely with nearby waterhamnmer satisfactory loads that would cause this large a Complete inspection of bellows displacement. 20213732 Axial restaint from nearby struts is significant. Axial pipe movement unlikely. No apparent axial damage at wall penetration bellows Inspection data error Engineering walkdown Complete NUCR associated observed less than 4 degree with 20210440 angle, within construction tolerance. Verification walkdown by originator of issue confirms no issue None Snubber Extension Tube Bent (1-P-FD-006-H20) Excessive Load from waterhammer Support is bowed, a possible indicator of overload Adjacent supports and components show no evidence of high load. Inappropriate snubber lockup Snubber tested satisfactory in RF12 expanded inspection Field misuse Extension tube 7/8" in diameter Calculate lateral capacity is susceptible to damage if climbed on or hung from. This is a conjested area with frequent valve work. Spring Can Movement larger than design (l-P-FD-006-HI01) Water Hammer Movement above design thermal movement Movement above design thermal movement is small 1/8 to 1/4 inch. Nearby Maintenance Hanger is at turbine exhaust Confirm maintenance since last outlet and is likely to be spring can painting disturbed by piping disassembly during turbine maintenance Turbine Induced Vibration Additional deflection is small, vibration deflection is possible. Page D2 of D2}}