Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-86-162, Partially Withheld Rept of Inquiry Q-1-83-012 Re Alleged Deficiencies in Emergency Diesel Generator,Radiation Containment Sys & Qualifications of Contractor Personnel. Region I Will Inspect Generator Design & Operating Details | 3 May 1983 | Partially Withheld Rept of Inquiry Q-1-83-012 Re Alleged Deficiencies in Emergency Diesel Generator,Radiation Containment Sys & Qualifications of Contractor Personnel. Region I Will Inspect Generator Design & Operating Details | |
IA-86-596, Rept of Inquiry Q2-85-021 on 860919 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | 19 September 1986 | Rept of Inquiry Q2-85-021 on 860919 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | Nondestructive Examination Liquid penetrant |
IR 05000018/1986001 | 24 June 1986 | Insp Repts 50-018/86-01 & 50-183/86-01 on 860617.No Violation or Deviation Noted.Major Areas Inspected: Organization,Procedures,Audits,Surveillances,Surveys, Postings,Annual Repts & Independent Surveys | |
IR 05000018/1987001 | 23 September 1987 | Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03.Violations Noted.Major Areas Inspected:Evesr,Getr,Nuclear Test Reactor & Vbwr Facility Operation Programs & Emergency Preparedness Program | |
IR 05000018/1997001 | 9 January 1998 | Insp Repts 50-018/97-01,50-070/97-01 & 50-183/97-01 on 971204.No Violations Noted.Major Areas Inspected:Review of Status of Getr,Vbwr & ESADA Vallecitos Experimental Superheat Reactor | |
IR 05000070/1985001 | 8 October 1985 | Corrected Page 2 to Insp Repts 50-070/85-01 & 50-073/85-02 | |
IR 05000070/1998001 | 7 January 1999 | Insp Rept 50-070/98-01 on 991116-19.No Violations Noted. Major Areas Inspected:Review of Status of Three Shutdown Reactor Facilities,Getr,Vbwr & Evesr.Safstor Condition of Evesr,Getr & Vbwr Evaluated During Tour of Facilities | |
IR 05000070/1999201 | 1 July 1999 | Insp Repts 50-070/99-201,50-073/99-201 & 50-183/99-201 on 990607-10.No Violations Noted.Major Areas Inspected: Operation Program,Organizational Structure & Functions Program | Safe Shutdown |
IR 05000083/1982001 | 19 July 1984 | IE Safeguards Insp Repts 50-083/82-01 & 70-1068/82-01 on 820729-31.No Nocompliance Noted.Major Areas Inspected: Security Plan,Organization,Access Controls,Records & Repts, Testing & Maint,Locks & Keys.Portions Deleted | |
IR 05000124/1983001 | 20 December 1983 | IE Safeguards Insp Rept 50-124/83-01 on 831128-29.No Violations or Deviations Identified.Major Areas Inspected: Security Plan,Protection of Snm,Security Organization, Surveillance,Access Control & Alarm Sys.Portions Deleted | |
IR 05000124/1984001 | 15 June 1981 | IE Safeguards Insp Rept 50-124/84-01 on 810504.No Noncompliance Noted.Major Areas Inspected:Security Plan, Organization,Physical Barriers,Access Control,Alarm Stations,Communications & Testing.Portions Deleted | |
IR 05000157/1989001 | 11 May 1989 | Insp Rept 50-97/89-01 & 50-157/89-01 on 890425-26.No Violations Noted.Major Areas Inspected:Operation & Records of Triga & Zpr Reactors | |
IR 05000213/1982013 | 1 July 1982 | IE Insp Repts 50-213/82-13,50-245/82-14,50-336/82-15 & 50-423/82-07 on 820607 & 08.No Noncompliance Noted.Major Areas Inspected:Prompt Public Notification Sys | |
IR 05000213/1985099 | 13 August 1985 | Revised SALP Rept 50-213/85-99 for Sept 1983 - Feb 1985, Modifying Discussion Re Deviations from Normal QA Requirements & after-the-fact Determinations of Quality | |
IR 05000213/1988021 | 15 November 1988 | Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs | |
IR 05000224/1985001 | 31 May 1985 | Insp Rept 50-224/85-01 on 850528.No Violation or Deviation Noted.Major Areas Inspected:Actions Taken to Correct Findings Identified in Insp Rept 50-224/84-01 & Reexam of Radiation Protection Program & Reactor Operations Program | |
IR 05000224/1986001 | 16 May 1986 | Partially Withheld Safeguards Insp Repts 50-224/86-01 & 50-224/86-02 on 860422-24 & 0502 (Ref 10CFR2.790).No Noncompliance Noted.Major Areas Inspected:Plans,Procedures & Reviews Fixed Site Physical Protection of SNM | |
IR 05000224/1987001 | 28 July 1987 | Insp Rept 50-224/87-01 on 870713-16.Violations Noted.Major Areas Inspected:Environ Monitoring & Emergency Preparedness Programs,Reactor Operator Requalification Program,Audits & Reviews,Experiments & Health Physics Program | |
IR 05000228/1987001 | 23 January 1987 | Insp Rept 50-228/87-01 on 870105-08.Violations Noted:Failure to Perform Monthly Surveillance Checks & Failure to Fully Implement & Maintain Emergency Plan | Siren |
IR 05000228/1989001 | 11 April 1989 | Insp Rept 50-228/89-01 on 890327-30.No Violations Noted. Major Areas Inspected:Arrr Operation,Including Organization, Review & Audit,Experiments,Reactor Operator Requalification Training,Environ Monitoring Program & Procedures | Siren |
IR 05000228/1997201 | 11 July 1997 | Insp Rept 50-228/97-201 on 970603-04.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support,Implementation of Emergency Plan & Security & Safeguards | High Radiation Area |
IR 05000228/1998201 | 2 December 1998 | Insp Rept 50-228/98-201 on 981102-05.Violations Noted.Major Areas inspected:on-site Review of Selected Aspects of Licensees Class II non-power Reactor Operation Including Organization & Staffing & Review & Audit Functions | Exclusive Use |
IR 05000228/1999201 | 2 September 1999 | Insp Rept 50-228/99-201 on 990816-19.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Was on-site Review of Selected Aspects of Licensee Class II non-power Reactor Operation | |
IR 05000237/1982008 | 15 June 1982 | IE Insp Repts 50-237/82-08,50-249/82-09,50-254/82-09 & 50-265/82-10 on 820503-06 & 17-18.Noncompliance Noted: Inadequate Design Analysis for Effects of Component Cooling Svc Water Check Valve Slamming | |
IR 05000245/1985099 | 6 May 1985 | SALP Repts 50-245/85-99 & 50-336/85-99 for Sept 1983 - Feb 1985 | High Radiation Area Non-Destructive Examination Fire Barrier Weld Overlay Hydrostatic Reserve Station Service Transformer Local Leak Rate Testing Feedwater Heater Intergranular Stress Corrosion Cracking Systematic Assessment of Licensee Performance Safeguards Contingency Plan Exemption Request Control of Heavy Loads Fuel cladding Inattentive |
IR 05000247/1986026 | 22 September 1986 | Insp Rept 50-247/86-26 on 860826-28.Major Areas Inspected: Requalification & Initial Licensing Training Programs for Licensed Operators.No Tracking Sys for Assuring Compliance w/10CFR55.31(e) Requirements | |
IR 05000250/1986027 | 1 December 1986 | SALP Repts 50-250/86-27 & 50-251/86-27 for Nov 1984 - Apr 1986 | Fitness for Duty High Radiation Area Fire Barrier Temporary Modification Locked High Radiation Area Missed surveillance Systematic Assessment of Licensee Performance Integrated leak rate test Operability Determination Exemption Request Control of Heavy Loads Fire Protection Program Overexposure Overspeed trip |
IR 05000254/1972009 | 20 October 1972 | Insp Repts 50-254/72-09 & 50-265/72-09 on 720825-27,0907 & 28.No Noncompliance Noted.Major Areas Inspected:Events, Investigation & Corrective Measures Re Unit 2 Jet Pump Failure on 720820 | |
IR 05000254/1985013 | 11 May 1985 | Insp Repts 50-254/85-13,50-265/85-14,50-295/85-19, 50-304/85-20,50-373/85-15,50-374/85-15,50-454/85-20 & 50-455/85-14 on 850425 & 0503.No Violations or Deviations Identified.Areas Inspected:Radiological Environ Program | Offsite Dose Calculation Manual |
IR 05000254/1986003 | 13 February 1986 | Insp Repts 50-454/86-07,50-455/86-06,50-373/86-05, 50-374/86-06,50-254/86-03,50-265/86-03,50-295/86-03 & 50-304/86-03.No Violations or Deviations Noted.Major Areas Inspected:Radiological Environ Monitoring Program | Offsite Dose Calculation Manual |
IR 05000259/1986037 | 15 December 1986 | Partially Withheld Insp Repts 50-259/86-37,50-260/86-37, 50-296/86-37,50-327/86-58 & 50-328/86-58 on 860721-1031 (Ref 10CFR2.790 & 73.21).Unresolved Item Opened.Major Areas inspected:pre-employment Screening of Certain Individuals | |
IR 05000261/1985016 | 24 May 1985 | Insp Repts 50-261/85-16,50-324/85-13,50-325/85-13 & 50-400/85-17 on 850506-09.No Violations or Deviations Noted. Major Areas Inspected:Preoperational Radiological Environ Monitoring Program at Shearon Harris & QA at Harris Lab | |
IR 05000263/1987008 | 8 June 1987 | Mgt Meeting Repts 50-263/87-08,50-282/87-10 & 50-306/87-10 on 870526.Areas Discussed:Operator Licensing Program Implementation & Methods to Improve Performance in Operator Licensing | |
IR 05000264/1973001 | 24 October 1973 | Insp Rept 50-264/73-01 on 730920 & 21.Violations Noted: Reactor Operated W/Greater than 1.5% Delta K/K Excess Reactivity on 730125 Change to Operating Procedure Inserted in Operating Log,W/O Formal Approval | Shutdown Margin Power change |
IR 05000264/1975001 | 15 October 1975 | Insp Rept 50-264/75-01 on 750922-24.No Noncompliance Noted. Major Areas Inspected:Reactor Operations,Maint, Implementation of Modified Operator Requalification Program & Corrective Action on Noncompliance Item 73-01 | |
IR 05000264/1977002 | 17 August 1977 | Insp Rept 50-264/77-02 on 770719-22,26 & 27.No Noncompliance Noted.Major Areas Inspected:Reactor Startup & Routine Operation | |
IR 05000269/1982020 | 11 June 1982 | IE Enforcement Meeting Repts 50-269/82-20,50-270/82-20, 50-287/82-21 & 50-369/82-19 on 820521.No Noncompliance Noted.Major Areas Discussed:Corrective Actions Re Breach of Reactor Bldg Integrity Due to Uncapped Calibr Line | |
IR 05000269/1982025 | 28 June 1982 | IE Insp Repts 50-269/82-25,50-270/82-25,50-287/82-25 & 50-369/82-22 on 820607-09.No Noncompliance Noted.Major Areas Inspected:Validation of Retran Computer Code | |
IR 05000269/1984031 | 31 December 1984 | SALP Repts 50-269/84-31,50-270/84-31 & 50-287/84-35 for May 1983 - Aug 1984 | Safe Shutdown Probabilistic Risk Assessment Emergency Lighting Feedwater Heater Systematic Assessment of Licensee Performance Integrated leak rate test Exemption Request |
IR 05000269/1985013 | 11 June 1985 | Insp Repts 50-269/85-13,50-270/85-13,50-287/85-13, 50-369/85-18 & 50-370/85-19 on 850528-31.No Violation or Deviation Noted.Major Areas Inspected:Seismic Analysis for as-built safety-related Piping Sys | |
IR 05000269/1985014 | 13 June 1985 | Insp Repts 50-269/85-14,50-270/85-14,50-287/85-14, 50-369/85-19,50-370/85-20,50-413/85-21 & 50-414/85-20 on 850528-31.No Violation or Deviation Noted.Major Areas Inspected:Radiological Environ & Meteorological Programs | Annual Radiological Environmental Operating Report |
IR 05000269/1985022 | 11 August 1985 | Insp Repts 50-269/85-22,50-270/85-22,50-287/85-22, 50-369/85-25,50-370/85-30,50-413/85-32 & 50-414/85-30 on 850723.No Violation or Deviation Noted.Major Areas Inspected:Emergency Preparedness & Response Facilities | |
IR 05000269/1986032 | 10 December 1986 | Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys | Annual Radiological Environmental Operating Report |
IR 05000272/1986099 | 5 February 1988 | SALP Repts 50-272/86-99 & 50-311/86-99 for Oct 1986 - Dec 1987 | Safe Shutdown High Radiation Area Fire Barrier Weld Overlay Locked High Radiation Area Missed surveillance Systematic Assessment of Licensee Performance Integrated leak rate test Safeguards Contingency Plan Fire Protection Program Fire Watch Siren Overspeed trip |
IR 05000272/1988006 | 18 March 1988 | Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness | Inattentive |
IR 05000280/1982016 | 22 June 1982 | IE Insp Repts 50-280/82-16,50-281/82-16,50-338/82-16 & 50-339/82-16 on 820518-19.No Noncompliance Noted.Major Areas Inspected:Validation of Retran Computer Code | |
IR 05000280/1982018 | 23 June 1982 | IE Safeguards Insp Repts 50-338/82-22,50-339/82-22, 50-280/82-18 & 50-281/82-18 on 820616-18.No Noncompliance Noted.Major Areas Inspected:Security Organization,Program Audit & Access Control.Details Withheld (Ref 10CFR73.21) | |
IR 05000280/1984031 | 11 February 1985 | Insp Repts 50-280/84-31,50-281/84-31,50-338/84-39 & 50-339/84-39 on 841105-28.Deviation Noted for North Anna 1 & 2:failure to Provide Mgt Training to Shift Technical Advisors | Job Performance Measure Backfit |
IR 05000280/1988040 | 26 October 1988 | Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items | Safe Shutdown |
IR 05000293/1975002 | 21 February 1975 | Insp Rept 50-293/75-02 on 750116-17.Noncompliance Noted: Failure to Maintain Plant Release Rate of Iodines & Particulates w/half-lives Greater than 8 Days Below Level Set in Tech Spec 3.8.B.2 |