Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19208A694 | 14 September 1979 | Forwards Amend 51 to Psar.Amend Includes Updates Reflecting Change in Plant Ref Core to Heterogenous Fuel/Blanket Configuration & Other Updates & Revisions | Safe Shutdown Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Finite Element Analysis Overtravel Earthquake Fuel cladding Power change Flow Induced Vibration Coast down |
ML19211A745 | 14 December 1979 | Forwards WARD-D-0050,Revision 3, Facility Core Assembly Hot Channel Factors Preliminary Analysis. | |
ML19224C346 | 29 June 1979 | Forwards Amend 50 to PSAR | |
ML19249D874 | 20 September 1979 | Forwards Certificate of Svc for PSAR Amend 51 | |
ML19254D055 | 19 October 1979 | Forwards Psar,Amend 52 | |
ML19254D796 | 26 October 1979 | Forwards Affidavit Confirming Distribution of Amend 52 to PSAR to Designated Local Public Officials & EPA Representatives | |
ML19255E722 | 2 November 1982 | Forwards Addl Info Requested at Electrical Power 821019 Working meeting.Marked-up PSAR Pages Will Be Incorporated Into Future PSAR Revision.Addl Info Re Item 8.3.3.3.g Will Be Submitted 821201 | |
ML19257D023 | 31 January 1980 | Forwards Amend 53 to Psar,Amending Application for CP & Class 104(b) Ol.Certificate of Svc Encl | |
ML19259A725 | 3 January 1979 | Ack Receipt of NRC 781109 Ltr Providing Summary of Outstanding Items.Asserts That DOE Is Statutorily Obligated to Continue to Design Facility & Manufacture Hardware on Order,But Is Proceeding Along Path of Prudent Management | |
ML19260D830 | 7 February 1980 | Forwards Affidavit Confirming Distribution of PSAR Amend 53 to Designated Local Public Officials & EPA Representatives | |
ML19261B974 | 5 March 1979 | Forwards item-by-item Assessment of Resolvability of Open Items in NRC Staff Review.Requests Resumption of NRC-DOE Safety Review & Technical Interchange Activities | Ultimate heat sink Fire Barrier Post Accident Monitoring Incorporated by reference Turbine Missile Flow Induced Vibration |
ML19263B823 | 3 January 1979 | Ack Receipt of 781109 Gammill-Caffey Ltr Summarizing NRC Technical Staff Positions.Evaluation Will Be Concluded Shortly | |
ML19263E332 | 1 June 1979 | Forwards Responses to NRC Request for Addl Info Re Physical Security Plan.Plan Withheld (Ref 10CFR2.790) | |
ML19269C999 | 23 February 1979 | Forwards Amend 48 to PSAR | |
ML19270F607 | 16 February 1979 | Forwards Copies of Analysis of Hypothetical Core Disruptive Events in Clinch River Breeder Reactor Plant. Rept Is Major Ref to CRBRP-3,Vol 1,Energy & Structural Margin Beyond Design Base Submitted 790209 | |
ML19274D636 | 22 January 1979 | Responds to NRC 781218 Ltr Re IE Insp Rept 50-537/78-01.No Proprietary Info.Requests 2 Word Corrections in Rept | |
ML19281A064 | 16 February 1979 | Forwards WARD-D-0169, Clinch River Breeder Reactor Plant, Response of Plant to Postulated Loss of One Heat Transport Loop W/Failure of Both Reactor Shutdown Sys. | |
ML19283B666 | 28 February 1979 | Forwards Affidavit Confirming Distribution of Amend 48 to PSAR to Local Officials & EPA | |
ML19296A213 | 9 February 1979 | Forwards Topical Rept CRBRP-3,Vol 1, Energetics and Structural Margin Beyond the Design Base. | |
ML19305A778 | 11 March 1980 | Forwards WARD-D-0210, Predicted Steady State Thermal- Hydraulic Performance of Fuel & Blanket Assemblies in Plant Heterogeneous Core, Revision 1 | |
ML19305C624 | 25 March 1980 | Forwards CRBRP-3, Hypothetical Core Disruptive Accident Considerations,Vol 2:Assessment of Thermal Margin Beyond Design Base. Reactor Containment Integrity Maintained for at Least 24-h Following Event | |
ML19305D742 | 11 April 1980 | Forwards Revision 1 to WARD-D-0218, Structural Response of Scale Models to Simulated Hypothetical Core Disruptive Accident. | |
ML19309F367 | 4 April 1980 | Forwards Final Rept on Base Matls Tests for Cell Liner Steels. | |
ML19316B097 | 5 June 1980 | Confirms Distribution of Amend 54 to Psar.Certificate of Svc Encl | |
ML19318B614 | 27 June 1980 | Forwards Amend 55 to PSAR | |
ML19318D255 | 3 July 1980 | Forwards Affidavit Confirming Distribution of PSAR Amend 55 to Local Public Officials & EPA Representatives | |
ML19323G057 | 30 May 1980 | Forwards Amend 54 to Psar.Certificate of Svc List Encl | |
ML19331D322 | 22 August 1980 | Forwards Clinch River Breeder Reactor Plant Fuel Assembly Structural Analysis in Support of Final Design Review, as Partial Response to Question 7 of Tp Speis 751006 Ltr.Addl Rept Will Be Submitted | |
ML19331E278 | 5 September 1980 | Forwards Affidavit Confirming Distribution of Amend 56 to PSAR to Designated Local Public Officials & Representatives of EPA | |
ML19339B668 | 7 November 1980 | Forwards Amend 57 to PSAR | |
ML19339C576 | 13 November 1980 | Forwards Affidavit Confirming Distribution of Amend 57 to PSAR to Designated Local Public Officials & Representatives of EPA | |
ML19340D568 | 30 December 1980 | Forwards Amend 59 to Psar.Service List Encl | |
ML19341C248 | 26 February 1981 | Forwards Clinch River Breeder Reactor Project Circulation Verification Program Pretest Predictions for Fftf Natural Circulation Tests Initiated at 100% & 75% Power/Flow Conditions. | |
ML19345B303 | 26 November 1980 | Forwards Amend 58 to PSAR | |
ML19345B779 | 28 November 1980 | Forwards Prediction of Fftf Natural Circulation Test Results Using Clinch River Breeder Reactor Plant Project Methodology, & Demo Pretest Predictions for Fftf Natural Circulation Tests. Info Available in Central Files Only | |
ML19345C495 | 2 December 1980 | Forwards Certificate of Svc Confirming Distribution of Amend 58 to PSAR | |
ML20002C163 | 5 January 1981 | Forwards Certificate of Svc Re Distributionof Amend 59 to PSAR | |
ML20003B698 | 19 February 1981 | Forwards Certificate of Svc for Amend 60 to PSAR | |
ML20023B272 | 23 December 1982 | Forwards Addl Info Re PSAR Chapter 4, Reactor. Chapter 4.3,Item 1.e & Chapter 4.4,Item 1.d Will Be Incorporated in Amend 75 to PSAR Scheduled for Submittal Jan 1983 | |
ML20023B314 | 23 December 1982 | Forwards Addl Info Requested at 821118-19 Meetings Re Instrumentation (Chapter 7).Amended PSAR Pages Will Be Incorporated Into Amend 75 of PSAR to Be Submitted in Jan 1983 | Hot Short |
ML20023B316 | 22 December 1982 | Forwards Response to NRC 821012 Request for Addl Info Re Intermediate Heat Transport Sys Tee Overtemp Problem | |
ML20023C582 | 16 May 1983 | Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways | |
ML20023D403 | 20 May 1983 | Forwards Amend 77 to PSAR | |
ML20023D961 | 27 May 1983 | Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl | Probabilistic Risk Assessment |
ML20024A678 | 20 June 1983 | Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl | |
ML20024C162 | 8 July 1983 | Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 | |
ML20024D029 | 22 July 1983 | Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA | Probabilistic Risk Assessment |
ML20024D955 | 9 May 1983 | Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 | |
ML20027B944 | 30 September 1982 | Forwards Amend 71 to Psar.Amend Includes Responses to Requests for Addl Info,Revisions to Chapter 7, Instrumentation & Controls, Sections 17E & 17I & Other Updates & Revisions.Certificate of Svc Encl | |
ML20027C243 | 24 August 1982 | Forwards Response to NRC 820409,0514 & 0609 Ltrs Re Request for Addl Info.Responses to Questions CS 421.26,43,51 & 53 & CS 760.162,164 & 176 Will Be Incorporated Into Future FSAR Amend |