ML19296A213
| ML19296A213 | |
| Person / Time | |
|---|---|
| Site: | Clinch River |
| Issue date: | 02/09/1979 |
| From: | Copeland R ENERGY, DEPT. OF, CLINCH RIVER BREEDER REACTOR PLANT |
| To: | Boyd R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19296A214 | List: |
| References | |
| 05-10, 5-10, NUDOCS 7902210186 | |
| Download: ML19296A213 (1) | |
Text
.m. t.,,,
,f . %
i [7)4 D
t
't
%a,1#
Department of Energy Clinch River Breeder Reactor Pirt ProRct Office R O. Box U Oak Ridge, Tennessee 37830 Docket f'o. 50-537 File: 05.10 February 9, 1979 Mr. Roger S. Boyd, Director Division of Project Management Of fice of fluclear Reactor Regulation U. S. fluclear Regulatory Commission Washington, DC 20555
Dear l!r. Boyd:
TOPICAL REPORT 0:1 STRUCTURAL fiARGIll BEYOiD DESIGN BASE (SMBD3)
Enclosed are seventy (70) copies of CRURP-3, Vol.1, " Energetics and Structural Margin Beyond the Design Base," dated January 1979.
This document provides technical assessments indicating that HCDA's would be non-energetic as well as information which supports and substantiates the CRBRP Project's position relative to Structural Margin Beyond Design Base loadings when energetic ilCDA's are assufied.
Tlie analysis and supporting scale model experiments that indicate the reactor coolant boundary would accommodate the SMBDB dynamic load requirements without loss of integrity are presented.
The responses previously submitted to the f1RC related to this topic will be updated-in a future amendment to the Preliminary Safety Analysis Report (PSAR).
(A Sincerely,
/
A,v y f f' s npg.%l
. O Md-M Rv/ond1,/Copf n
PS:79:041
!c~ ting Assistant Director for Public Safety
Enclosures:
As stated cc:
Service List Licensing Distribution Standard Distribution gg