Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20056E15117 August 1993Summary of 930802 Meeting w/GE,C-E & Westinghouse in Rockville,Md Re Status of Design Certification Reviews for Each Revolutionary & Passive Reactor Design.List of Attendees & Handout EnclDesign basis earthquake
License Renewal
ML20056F0869 August 1993Summary of 930714 Meeting W/Westinghouse Representatives in Rockville,Md Re AP600 Main Control Room & Technical Support Habitability.List of Attendees EnclLicense Renewal
ML20057A6771 September 1993Summary of 930810-11 Meeting W/Westinghouse to Discuss I&C Sys Designs AP600.List of Attendees EnclProbabilistic Risk Assessment
Operability Determination
License Renewal
ML20058F15418 November 1993Summary of 403rd Meeting of ACRS on 931104-06 Re NRC Confirmatory Test Program in Support of AP600 Design Certification
ML20058G32324 November 1993Summary of 931110 Meeting W/Westinghouse to Discuss Matls Used in Design of AP600.Attendees Listed in Encl 1
ML20059C7187 April 1993Summary of 389th ACRS Meeting on 920910-12 in Bethesda,Md Re Comments on Staff Review of Westinghouse AP600 Design,Nrr Action Re IPE for FitzPatrick Nuclear Plant & Status of Implementation of Findings of NRC Regulatory Impact SurveySafe Shutdown
Probabilistic Risk Assessment
Design basis earthquake
Earthquake
Chernobyl
ML20059E2104 January 1994Summary of 931201 Meeting W/Westinghouse to Discuss RAP for AP600 Design.List of Attendees EnclProbabilistic Risk Assessment
ML20059E4815 January 1994Summary of 931213-14 Meeting W/W to Discuss Human Factors Engineering (Hfe) for AP600 Design.List of Meeting Attendees Encl
ML20059J1935 November 1993Summary of 931026 Meeting W/Util in Rockville,Md Re Focused PRA & Proposed Resolution to Addresse Regulatory Treatment Issue of non-safety-related Sys for AP600.List of Meeting Attendees & Util Presentation Slides EnclProbabilistic Risk Assessment
ML20071M6504 June 1992Summary of 920603 & 04 Meeting Re Assessment of Mods Needed to Rosa Facility to Simulate AP-600,to Agree on Instrumentation Requirements,To Develop Test Matrix & Estimate Cost of ModsLoop seal
ML20128N82618 February 1993Summary of 921006 & 07 Meeting W/Westinghouse in Monroeville,Pa to Discuss Instrumentation & Control Sys of AP600 DesignProbabilistic Risk Assessment
ML20129G76129 July 1996Summary of ACRS Subcommittee Westinghouse Std Plant Designs Meeting on 960719 in Rockville,Md to Gather Info Re SECY-96-128, Policy & Key Technical Issues Pertaining to Westinghouse AP600 Standardized Passive Reactor DesignSafe Shutdown
ML20129G82323 July 1996Summary of ACRS Joint Subcommittee Probabilistic Risk Assessment & Westinghouse Std Plant Designs Meeting on 960605 in Rockville,Md to Gather Info Re Westinghouse AP600 Level 1 & Shutdown PRAsProbabilistic Risk Assessment
ML20129G98028 October 1996Summary of 961015 Telcon W/Util to Discuss thermal-hydraulic Uncertainty RAI Responses.Questions on RAI Responses,Summary of W Responses & Update to Open Item Tracking Sys Based on Results of Telcon Encl
ML20129K38720 November 1996Summary of 961027 Meeting W/Westinghouse Ofcs in Monroeville,Pa to Discuss Details & Effectiveness of Revised Design of Ph Control Sys Which Uses Chemical Baskets of TSP List of Attendees,Agenda & Handouts EnclBoric Acid
ML20132A88111 December 1996Summary of 961112 Meeting W/W in Rockville,Md to Discuss AP600 Scaling & Pirt Closure Rept.W/Agenda & Handouts
ML20132D23117 December 1996Summary of 961113 Meeting W/W in Rockville,Md Re AP600 Itaac.List of Attendees & Handouts EnclUltimate heat sink
Squib
ML20133C2543 January 1997Summary of 961119 Meeting W/Util in Rockville,Md Re Licensee AP600 Fire Protection AnalysisFire Barrier
ML20133C2653 January 1997Summary of 961122 Meeting W/W in Rockville,Md to Discuss How Wcobra/Trac Oregon State Univ Long Term Cooling Final Validaton Rept (WCAP-14776) Addresses Concerns Re Computer Code for AP600 Long Term Cooling AnalysesGOTHIC
ML20133C96931 December 1996Summary of 950620-22 Meeting W/W in Monroeville,Pa Re Passive Containment Cooling Sys of AP600 Design.List of Attendees & Agenda Encl
ML20133E1968 January 1997Summary of 961220 Telecon W/W to Discuss AP600 Asi Questions.Summary of Actions & Highlights of Questions Discussed Listed.List of Participants EnclBoric Acid
Grab sample
Coatings
Squib
ML20133E6778 January 1997Summary of 961231 & 970103 Telephone Conference Between J Winters of W,J Holmes & D Jackson of NRC Re Certain Unresolved Open Items Involving Std Safety Analysis Rept Section 9.5.1 & 9ASafe Shutdown
Fire Barrier
Emergency Lighting
ML20133G18513 January 1997Summary of 961209 Meeting W/Westinghouse Re Schedule for AP600 Design.List of Attendees & Copy of Slides Encl
ML20133G18910 January 1997Summary of 961223 Telcon W/W Re Questions NRC Issued to W in on AP600 Scaling & Pirt Closure rept,WCAP-14627
ML20133N28716 January 1997Summary of 961120-21 Meeting W/W Re Review Milestones for AP600 Design Certification.W/List of Attendees & Milestones Identified During Meeting
ML20134B72329 January 1997Summary of 961218 Meeting W/Westinghouse in Rockville,Md Re Issues Associated W/Fire PRA for AP600.List of Attendees & Handouts EnclHot Short
Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
ML20134B76128 January 1997Summary of 970109 Meeting W/W in Rockville,Md to Review W Preliminary Calculations & Discuss Pertinent Open Items Related to AP600 Seismic Margins Analysis.List of Attendees & Documents Discussed at Meeting EnclProbabilistic Risk Assessment
ML20134G8394 November 1996Summary of 960926 Meeting W/W in Rockville,Md to Discuss Status of AP600 Notrump Level Swell & Benchmark Validation Calculations
ML20134H5266 February 1997Summary of 970107 Meeting W/W in Rockville,Md to Discuss W AP600 Fire Protection AnalysisHot Short
Safe Shutdown
Fire Barrier
Emergency Lighting
ML20134Q14320 February 1997Summary of 970204 Meeting W/Westinghouse in Rockville,Md Re Proposed Design Changes in Response to NRC Policy Position in SECY-96-128 on post-72 Hour ActionsBoric Acid
Fire Barrier
Post Accident Monitoring
Emergency Lighting
Finite Element Analysis
ML20134Q20125 February 1997Summary of 970210 Telcon W/Listed Participants Re Staff Comparison of Scdap/Relap Analysis W/Maap Results for AP600 3BE Core Damage Sequence
ML20135D9793 March 1997Summary of 970121-22 Meeting W/W in Monroeville,Pa to Discuss Issues Associated W/Insights Form AP600 PRAProbabilistic Risk Assessment
Squib
ML20135E4924 March 1997Summary of 961220,970129-30 & 0219 Telcons W/W Re AP600 Adverse Sys Interaction Rept WCAP-14477.List of Participants EnclSquib
ML20135E4954 March 1997Summary of 961209-13 Meeting W/W in Monroeville,Pa Re Audit W Calculations & Discuss Pertinent Open Items Related to Ssar Sections 3.7 & 3.8 on AP600 Structural Design. W/List of Attendees,Agenda & HandoutsSafe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Finite Element Analysis
Earthquake
ML20135F81611 March 1997Summary of 970130 Telcon W/W to Discuss Draft Safety Evaluation Rept Open Item 19.1.3.1-9 on W Updating Shutdown PRA ModelSquib
ML20136E9997 March 1997Summary of 970130 Telcon Between Listed Members of W & NRC Re W Retraction of Request to Apply leak-before-break Methodology to AP600 Feedwater LineSafe Shutdown Earthquake
Nondestructive Examination
Earthquake
Liquid penetrant
Dissimilar Metal Weld
ML20136H69214 March 1997Summary of 970211-12 Meeting W/Westinghouse in Los Altos,Ca Re Issues Related to AP600 Source Term.List of Attendees Encl
ML20137C07018 March 1997Summary of 970114-16 Meeting W/W in Rockville,Md to Discuss W AP600 Structural Modules.W/List of Attendees,Agenda,List of Open Items Proposed for Discussion & List of Technical Questions from 960522-23 MeetingSafe Shutdown Earthquake
Hydrostatic
ML20137C84921 March 1997Summary of 970321 Telcon Between NRC Staff & W Re Exvessel Severe Accident Phenomena
ML20137C90824 March 1997Summary of Telecon on 970313 W/W to Discuss Staff Comments Wgothic Computer Code & Passive Containment Cooling Sys Rept
ML20137G69327 March 1997Summary of 970210 & 0307 Meetings W/W in Rockville,Md Re Fire Protection Analysis Unresolved Open Items Related to Ssar Section 9.5.1 and 9ASafe Shutdown
Fire Barrier
ML20137N0502 April 1997Summary of 970205 Meeting W/W in Rockville,Md to Discuss Issues Associated w/AP600 Itaac.List of Meeting Attendees & Handouts EnclProbabilistic Risk Assessment
ML20137N0637 April 1997Summary of 970311 Telcon W/Listed Participants to Discuss Resolution Paths for Open Issues in AP600 Structural & Seismic Analyses Design Review
ML20137N0717 April 1997Summary of 970305 Meeting W/Listed Individuals of W in Rockville,Md to Discuss Improved Means for Closure for Wgothic Computer Code & PCS Design Review
ML20137Q2207 April 1997Summary of 970401 Telcon Between R Schreiber,K Deutsch, H Li,M Gareri & J Sebrosky.Prupose of Telcon to Provide Preliminary Assessment of W on Approach for Resolving Staff Comments
ML20137Q8699 April 1997Summary of 970324 Meeting W/Util in Rockville,Md Re Possible Water Hammer Events Observed During AP600 Testing
ML20137U44710 April 1997Summary of 970312 Meeting W/W & Consultants in Rockville,Md Re AP600 Application of Wcobra/Trac for LTC Analyses.List of Attendees Encl
ML20137U45011 April 1997Summary of 970325 Meeting W/Scientech,Inc in Rockville,Md Re AP600 Design Review on PCS & Wgothic Computer Code.List of Attendees EnclCoatings
ML20137Z38722 April 1997Summary of 970407 Meeting W/W in Rockville,Md to Provide W Feedback on Status of Review of Ssar Sections 9.5.1,9A & Fire Protection Analysis.List of Meeting Attendees & Meeting Handout EnclSafe Shutdown
Fire Barrier
Emergency Lighting
ML20138E40429 April 1997Summary of 970313 Meeting W/Westinghouse in Rockville,Md Re Overall Conclusions from AP600 Notrump Computer Code Final V&V & Addl Documentation Which Will Be Included in Revised Final V&V ReptBoric Acid