Summary of 961209 Meeting W/Westinghouse Re Schedule for AP600 Design.List of Attendees & Copy of Slides Encl
ML20133G185
Person / Time
Site: 05200003
Issue date: 01/13/1997
From: Kenyon T
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9701150209
Download: ML20133G185 (7)


Text

7 pwou ye 4

UNITED STATES j

NUCLEAR REGULATORY COMMISSION

\\..... p

January 13, 1997 APPLICANT: Westinghouse Electric Corporation FACILITY:

AP600

SUBJECT:

SUMMARY

OF DECEMBER 9, 1996, SENIOR MANAGEMENT MEETING ON THE AP600 On December 9,1996, representatives of the Nuclear Regulatory Commission (NRC) and Westinghouse met to dis:uss the schedule for the AP600 design. is a list of attendees. Attachment 2 is a copy of the slides presented by the staff.

The staff opened the meeting stating that the primary factors driving the schedule were the timely Westinghouse submittal of remaining deliverables and the availability of staff resources to support the review. Other factors to be considered included the decisions on the policy issues currently before the Commission, the level of detail of information in the Standard Safety Analysis Report, and the timely resolution of issues concerning the programmatic reviews and the key technical issues.

The staff met with Westinghouse on November 20 and 21, 1996, to schedule the detailed review milestones for each technical discipline. The staff consid-ered Westinghouse's proposed submittal dates and statf availability. The general results of the meeting was that the majority of the staff could deliver their final safety evaluation report (FSER) inpu'. to the NRC Projects staff in June 1997. The two exceptions were the Containment Systems and l

Severe Accident Branch (July 21,1997) and the Reactor 3ystems Branch (Octo-ber 31, 1997). As a result of further discussion the next week, the Reactor Systems Branch agreed to deliver their input by August 31, 1997.

These internal schedules would result in the issuance of an Advanced FSER to the Commission and Advisory Committee on Reactor Safeguards about November 1997, and the publication and issuance of the Final Design Approval around March 1998. The staff indicated that the rapid resolution of key technical issues would help expedite the schedule.

It also was evaluating whether contractor assistance would help improve the schedule.

i

\\ \\

\\f@

15oosa NBC FILE gENEP COPY 9701150209 970113 PDR ADOCK 05200003 A

PDR

. 1 January 13, 1997:

Westinghouse stated that the schedule was inconsistent with'their funding and their desire to complete the review in FY97. They indicated that they would appeal the proposed completion schedule to NRC/ senior management.

original signed by:

Thomas J. Kenyon, Project Manager Standardization Project Directorate Division of Reactor Program Management Office Of Nuclear Reactor Regulation Docket No.52-003 Attachments: As stated cc w/ attachments:

See next page i

1 DISTRIBUTION w/ attachments:

l

Docket File PDST R/F TQuay PUBLIC TKenyon JSebrosky WHuffman DTJackson DISTRIBUTION w/o attachments:

4 FMiraglia/AThadani, 0-12 G18 RZimmerman, 0-12 G18 BSheron, 0-12 G18 EJordan, T-4 D18 TMartin DMatthews ACRS (11)

JMoore, 0-15 B18 WDean, 0-17 G21 CBerlinger, 0-8 H2 BBoger, 0-9 E2 MVirgilio, 0-8 E2 Alevin, 0-8 E23 JBongarra, 0-9 H15 HBrammer, 0-7 H16 JKudrick, 0-8 H2 GBagchi, 0-7 H15 JNWilson i

l DOCUMENT NA u

... ME:

SUM c. c.,,

.n -..

c. c.,,

.n w. u.....

OFFICE PM:P4h[3kRPM l

D:PDST:DRPM

-l NAME TJKeny3n!%g TRQuay 41MA DATE 014?b/97 01/3)/97 OFFICIAL RECORD COPY t

2

Westinghouse Electric Corporation Docket No.52-003 cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD 20874 Pittsburgh, PA 15230 Mr. Ronald Simard, Director Mr. B. A. McIntyre Advanced Reactor Program Advanced Plant Safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 Eye Street, N.W.

Energy Systems Business Unit Suite 300 Box 355 Washington, DC 20006-3706 Pittsburgh, PA 15230 Ms. Lynn Connor Mr. John C. Butler Doc-Search Associates Advanced Plant Safety & Licensing Post Office Box 34 Westinghousa Electric Corporation Cabin John, MD 20818 Energy Systems Business Unit Box 355 Mr. James E. Quinn, Projects Manager Pittsburgh, PA 15230 LMR and SBWR Programs GE Nuclear Energy Mr. M. D. Beaumont 175 Curtner Avenue, M/C 165 Nuclear and Advanced Technology Division San Jose, CA 95125 Westinghouse Electric Corporation One Montrose Metro Mr. Robert H. Buchholz 11921 Rockville Pike GE Nuclear Energy Suite 350 175 Curtner Avenue, MC-781 Rockville, MD 20852 San Jose, CA 95125 Mr. Sterling Franks Barton Z. Cowan, Esq.

U.S. Department of Energy Eckert Seamans Cherin & Mellott NE-50 600 Grant Street 42nd Flocr 19901 Germantown Road Pittsburgh, PA 15219 Germantown, MD 20874 Mr. Ed Rodwell, Manager Mr. S. M. Modro PWR Design Certification Nuclear Systems Analysis Technologies Electric Power Research Institute Lockheed Idaho Technologies Company 3412 Hillview Avenue Post Office Box 1625 Palo Alto, CA 94303 Idaho Falls, ID 83415 Mr. Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road Germantown, MD 20874

i

~

SENIOR MANAGEMENT MEETING i

DECEMBER 9, 1996 MEETING ATTENDEES li8 tie ORGANIZATION THOMAS KENYON NRC/NRR/PDST J0E SEBROSKY NRC/NRR/PDST CARL BERLINGER NRC/NRR/DSSA BRUCE B0GER NRC/NRR/DRCH MARTY VIRGILIO NRC/NRR/DSSA TIM MARTIN NRC/NRR/DRPM ASHOK THADANI NRC/NRR BOB VIJUK WESTINGHOUSE BRIAN MCINTYRE WESTINGHOUSE CHARLES THOMPSON DOE PETER MURRAY WESTINGHOUSE ALAN LEVIN NRC/NRR/SRXB J. BONGARRA NRC/NRR/DRCH B0B MAIERS PADEP-BRP LYNN CONN 0R DSA, INC.

t H.L. BRAMMER NRC/NRR/DE J. KUDRICK NRC/NRR/SCSB l

G. BAGCHI NRC/NRR/ECGB JERRY WILSON NRC/NRR/PDST Attachment I

+

i AP600 REVIEW SCHEDULE e

Primary factors driving schedule Timely Westinghouse submittal of remaining deliverabbs

[

I Availability of staff resources to support the review l

e Other factors affecting schedule Policy issues t

Level of detail of information in SSAR Programmatic Reviews (ITAAC, Technical Specifications, ITP) 3 i

Reso'.ution of key technical issues (RTNSS) l E

5

~

i i

l i

t AP600 REVIEW SCHEDULE o

General Results - FSER to Project Manager i

June 1997 for the nudority of the branches l

Outliers i

- 7/21/97 for Containment Systems and Severe Accident Branch r

- 8/31/97 for Reactor Systems Branch

{

r Current Estimate Advance FSER - November 1997 l

Publish FSER/ Final Design Approval - March 1998

(

I

[

I

t i

t AP600 REVIEW SCHEDULE i

L o

Potential Expediters Rapid resolution of ITAAC and key technical issues Contractor Assistance l