Summary of 931213-14 Meeting W/W to Discuss Human Factors Engineering (Hfe) for AP600 Design.List of Meeting Attendees Encl
ML20059E481
Person / Time
Site: 05200003
Issue date: 01/05/1994
From: Kenyon T
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9401110200
Download: ML20059E481 (4)


Text

, f picw I UNITED STATES l t j NUCLEAR REGULATORY COMMISSION

((ikSf'f

  • {sy j

WASHINGTON, D.C. 20556-0001

%' ne January 5, 1994

....+

Docket No.52-003 APPLICANT: Westinghouse Electric Corporation FACILITY: AP600

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS HUMAN FACTORS ENGINEERING (HFE) FOR THE AP600 DESIGN On December 13 and 14, 1993, representatives of the Nuclear Regulatory Commission (NRC) and the Westinghouse Electric Corporation (Westinghouse) met to discuss how HFE principles are being applied to the AP600 design. HFE is discussed in Chapter 18 of the standard safety analysis report (SSAR) for the AP600. A list of attendees is enclosed.

At the beginning of the meeting, it was agreed that two subjects (the inspections, tests, analyses, and acceptance criteria (ITAAC) and the emergency response guidelines (ERGS) for the AP600 design) would be addressed during other meetings. Westinghouse indicated that it did not believe that the ERGS were required for design certification. The staff stated that it has concluded that the ERGS were required for design certification, but it was agreed to discuss the subject later.

Westinghouse opened the meeting with a discussion of what portions of Chapter 18 of the SSAR they wanted certified. The applicant stated that they wanted the NRC to certify the scope and process of selected aspects of their HFE program. This approach will allow the designer the flexibility to modify the design of the control room as technology changes.

The staff then described the type and level of detail!of information that will be required to support design certification. The staff then stated that it was willing to certify levels of detail beyond the scope and process should Westinghouse request such action. Other levels of detail that the staff is willing to review for certification include:

the detailed process (including the implementation plan) results for some completed elements (for all control room resources) a results for scme partially-completed elements (for some control room resources), and/or

  • the complete design Information contained in the program review model that is not certified will be addressed in the ITAAC.

Westinghouse was then requested to clarify what portions of Chapter 18 of the SSAR it wanted the staff to certify.

Then the meeting attendees discussed the staff's comments and concerns with Westinghouse's responses to the staff's requests for additional information n N'

< l 1000L fEC FM CE[fE(( fgpy 9401110200 940105 PDR ADOCK 05200003 A PDH

c l

?

January 5, 1994 i (RAls). At the end of the meeting, Westinghouse agreed to modify some of their responses to the RAls, including the matrix developed to re:; pond to .

Question 620.51. In addition, the staff agreed to forward information regarding HFE review topics for the AP600 (by element) and operating review ,

issues for the AP600 design certification review.

It was agreed to try to schedule the next meeting regarding HFE for the AP600 t design in February 1994, after Westinghouse responds to the concerns and i comments discussed during this meeting.

(Original signed by)

Thomas J. Kenyon, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors

, and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

As stated cc W/ enclosure:

See next page DISTRIBUTION:

iDocket< File PDST R/F TMurley/FMiraglia DCrutchfield ,

PDR WTravers TKenyon KShembarger ,

RArchitzel RBorchardt ACRS (11) EJordan, MNBB3701 #

JMoore, 15818 WDean, E00 JBongarra, 10024 GGalletti, 10D24 REckenrode, 10D24 MGareri, 8H3 HLi, 8H3 0FC LA:PDST:ADAR PM:PDSTIAdAR SC:PDST:ADAR NAME PShea 3 O S TKen[on RArcdibzel DATE Old/94 01/4/94 Ol/j/94 0FFICIAL RECORD COPY: HFEMTGSM.TK i

I f

P

e I

'4 Westinghouse Electric Corporation Docket No.52-003 .

cc: Mr. Nicholas J. Liparulo Mr. Victor G. Snell, Director Nuclear Safety and Regulatory Analysis Safety and Licensing Nuclear and. Advanced Technology Division AECL Technologies Westinghouse Electric Corporation 9210 Corporate Boulevard F.0. Box 355 Suite 410 Pittsburgh, Pennsylvania 15230 Rockville, Maryland 20850 Mr. B. A. McIntyre Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 Mr. John C. Butler Advanced Plant Safety & Licensing '

Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 Mr. M. D. Beaumont Nuclear and Advanced Technology Division Westinghouse Electric Corporation One Montrose Metro 11921 Rockville Pike Suite 350 Rockville, Maryland 20852 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C. 20585 Mr. S. M. Modro EG&G Idaho Inc.

Post Office Box 1625 Idaho Falls, Idaho 83415 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Room 8002 Washington, D.C. 20503 Mr. Frank A. Ross U.S. Department of Energy, NE-42 Office of LWR Safety and Technology ,

19901 Germantown Road Germantown, Maryland 20874 i

r i+ .

MEETING ATTENDEES HUMAN FACTORS ENGINEERING AP600 DESIGN DECEMBER 13 AND 14, 1993 NAME AFFILIATION Hulbert Li NRC/DRCH/HICB Thomas Kenyon NRC/NRR/PDST G. Galletti NRC J. Bongarra NRC/DRCH/HHFB Mario C. Gareri NRC/DRCH/HICB Kris Shembarger NRC/NRR/ POST Andrea Sterdis Westinge;Jse-AP600 Licensing (

John Carrera Westin9hsase-MMD J. Brian Reid Westinghouse-PISCS Emilie Roth Westinghouse-NATD-MMD J. Easter Westinghouse-NATD-MMD S. Kerch Westinghouse-NATD-MMD John O'Hara Brookhaven National Lab J. C. Higgins Brookhaven National Lab i