Summary of 961119 Meeting W/Util in Rockville,Md Re Licensee AP600 Fire Protection Analysis
ML20133C254
Person / Time
Site: 05200003
Issue date: 01/03/1997
From: Diane Jackson
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9701070090
Download: ML20133C254 (4)


Text

.

52- @ 3

  • f clo u 4 UNITED STATES

[4 E8 S NUCLEAR REGULATORY COMMISSION if WASHINGTON, D.C. 20666 4 001

...../

January 3, 1997 APPLICANT: Westinghouse Electric Corporation FACILITY: AP600

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS WESTINGHOUSE AP600 FIRE PROTECT ANALYSIS The subject meeting was held at the Westinghouse Electric Corporation (West-inghouse) office in Rockville, Maryland, on November 19, 1996, between John Butler, Jim Winters, and Don Hutchings of Westinghouse nd Jeff Holmes, Jim Lyons, and Diane Jackson of the Nuclear Regulatory Comt (sion (NRC) staff. 1 The purpose of the meeting was to discuss certain unresolvea open items related to standard safety analysis report (SSAR) Section 9.5.1 and 9A. The i open item tracking system (0ITS) should be updated to reflect this meeting. )

OITS# 314 - Action Westinghouse Westinghouse described its fire protection configuration for safety-related and ran safety-related systems. The initial water source for safety-related fire hose stations is the passive containment cooling system (PCS) tank. A )

manual main system.

valve is available to switch to the underground non safety-related fire The PCS water source has a maximum, gravity-driven flow capacity of 75 gpm to tk farthest two fire stations. The staff expressed a concern regarding this 'ited amount of water for the initial fire protection i response.

Westinghouse will investigate a change to the PCS. The non-safety-related, high flow, firemain would be the initial water supply for fire protection, rather than the PCS tank. A manual valve would be available to supply water from the PCS. A COL action item would be added to instruct the operator to open the connection valve. i OITS# 309 - Action Westinghouse The staff requested clarification on the AP600 zone of influence and discussed the use of fire barriers.

(a) Westinghouse will revise the SSAR to indicate " zone of influence" is not used outside of the containment. Inside the containment, zone of influence is defined as a fire zone. .

(b) Westinghouse will review the description of fire zone separation in hh U

Appendix 9A, including a discussion of 3-hour fire barriers around main cable runs.

(c) Westinghouse will provide, by letter, a sketch of the ADS module I indicating the valve arrangement and structural steel thickness. t c7001a NRC FitE CENTER @

9701070090 970103 PDR ADOCK 05200003 A PDR

January 3, 1997 (d) Westinghouse will review the SSAR description to ensure the use of 3-hour fire barriers that are non-combustiole inside the containment.

OITS#'308 - Action NRC/ Action Westinghouse The staff expressed a concern regarding the assurance of sufficient fire protection water designated'in post-72 hour consumables.

1 The staff will discuss internally the adequacy of the post-72 hour

~

consumables.

Westinghouse will provide the letter number and date for the SECY response on post-72 hour actions and consumables.

OITS# 323 - Action Westinghouse The staff requested clarification of the design considerations for smoke control.

Westinghouse will confirm applicability of certain standards to the'AP600 and revise the SSAR as necessary. j i

The staff will provide certain fire protection codes regarding smoke control  ;

that need to be reviewed for applicability to the AP600. j The staff provided a list of the following codes to Westinghouse following the l meeting. j

1) NFPA 90A - Air conditioning and ventilation systems l
2) NFPA 928 - Guide for smoke management systems in malls, atriums, and large ,

areas

3) NFPA 92A - Recommendations and practices for smoke control systems
4) ASHRAE standard - Smoke control systems for buildings l original signed by:

Diane 1. Jackson, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-003 cc: See next page DISTRIBUTION:

See next page DOCUMENT NAME: A:SPL11 19. MIN

  • see previous concurrence ,

Ta sommlue a sepy of this doeusnont,IndooTo in the ben: *C" = Copy without setachment/encioews 'E" = Copy wRh attachment /encloswo *r = No copy 0FFICE PM:PDST:DRPM SPLB:DSSA l D:PDST:DRfti o l NAME DTJackson:sf i'W JLyons

  • TRQuay "77T7 DATE 98/%/@ '() 12/31/96 12/ /M idR OFFICIAL RECORD W -

bh 7

i Westinghouse Electric Corporation Docket No.52-003 cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD 20874 Pittsburgh, PA 15230 Mr. Ronald Simard, Director

, Mr. B. A. McIntyre Advanced Reactor Program 1 Advanced Plant Safety & Licensing Nuclear Energy Institute j Westinghouse Electric Corporation 1776 Eye Street, N.W.

Energy Systems Business Unit Suite 300 Box 355 Washington, DC 20006-3706

Pittsburgh, PA 15230

, Ms. Lynn Connor Mr. John C. Butler Doc-Search Associates Advanced Plant Safety & Licensing Post Office Box 34

. Westinghouse Electric Corporation Cabin John, MD 20818

Energy Systems Business Unit Box 355 Mr. James E. Quinn, Projects Manager l Pittsburgh, PA 15230 LMR and SBWR Programs GE Nuclear Energy i Mr. M. D. Beaumont 175 Curtner Avenue, M/C 165 i

Nuclear and Advanced Technology Division San Jose, CA 95125 l

. Westinghouse Electric Corporation One Montrose Metro

' Mr. Robert H. Buchholz  !

11921 Rockville Pike GE Nuclear Energy Suite 350 175 Curtner Avenue, MC-781 Rockville, MD 20852 San Jose, CA 95125  ;

l Mr. Sterling Franks Barton Z. Cowan, Esq.

U.S. Department of Energy Eckert Seamans Cherin & Mellott NE-50 600 Grant Street 42nd Floor 19901 Germantown Road Pittsburgh, PA 15219 Germantown, MD 20874 4

Mr. Ed Rodwell, Manager Mr. S. M. Modro PWR Design Certification i

Nuclear Systems Analysis Technologies Electric Power Research Institute Lockheed Idaho Technologies Company 3412 Hillview Avenue Post Office Box 1625 Palo Alto, CA 94303 Idaho Falls, ID 83415 Mr. Charles Thompson, Nuclear Engineer

AP600 Certification NE-50 l

) 19901 Germantown Road Germantown, MD 20814 i

}

. _ . . . . - .. .. . . . - .. . . - - . .- -=

2

, 1

- DISTRIBUTION w/attachmeAti:

Docket file ' '

PUBLIC PDST R/F a FMiraglia/AThadani,'0-12 G18 RZimmerman, 0-12 G18 i BSheron, 0-12 GIS TMartin i DMatthews i

, TQuay WHuffman 4 -TKenyon 4 JSebrosky DTJackson EJordan, T-4 D18

ACRS (11) .

l JNoore, 0-15 B18 i WDean, 0-17 G21 4

JHolmes, 0-8 D1 l JLyons, 0-8 D1 i

1 l

l f

i t