L-00-072, Annual Financial Report - 1999 for Beaver Valley Power Station, Unit 1 and 2 | 24 May 2000 | Annual Financial Report - 1999 for Beaver Valley Power Station, Unit 1 and 2 | |
L-01-035, Retrospective Premium Guarantee | 28 March 2001 | Retrospective Premium Guarantee | |
L-01-160, Letter Forwarding Beaver Valley Power Station, Unit 1, Fourteenth Refueling Inservice Inspection Report | 2 January 2002 | Letter Forwarding Beaver Valley Power Station, Unit 1, Fourteenth Refueling Inservice Inspection Report | Boric Acid Hydrostatic VT-2 |
L-01-163, Cycle 15 Steam Generator Tube Inspection 90 Day Report | 2 January 2002 | Cycle 15 Steam Generator Tube Inspection 90 Day Report | Boric Acid |
L-02-002, G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse | 15 April 2010 | G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse | Boric Acid Nondestructive Examination Pressure Boundary Leakage Through-Wall Leak |
L-02-003, Inservice Testing Program, Proposed Revision 2G | 4 January 2002 | Inservice Testing Program, Proposed Revision 2G | |
L-02-021, Bulletin 2001-01 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles | 28 March 2002 | Bulletin 2001-01 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles | Boric Acid Through-Wall Leak |
L-02-026, February 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 | 7 March 2002 | February 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 | |
L-02-030, Request for Extension of Time to Submit an Answer and Request a Hearing | 15 March 2002 | Request for Extension of Time to Submit an Answer and Request a Hearing | |
L-02-034, Annual Radioactive Effluent Release Report for 2001 | 29 March 2002 | Annual Radioactive Effluent Release Report for 2001 | Annual Radioactive Effluent Release Report |
L-02-038, Technical Specification Bases Change Submittal | 19 April 2002 | Technical Specification Bases Change Submittal | |
L-02-039, Report of Facility Changes, Tests and Experiments | 22 April 2002 | Report of Facility Changes, Tests and Experiments | Boric Acid Temporary Modification Foreign Material Exclusion Scaffolding |
L-02-040, Supplemental Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | 19 April 2002 | Supplemental Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | Boric Acid VT-2 Through-Wall Leak |
L-02-041, Annual Financial Reports & Certified Financial Statements for Perry Nuclear Power Plant, Davis-Besse Nuclear Power Station & Beaver Valley Power Station | 24 April 2002 | Annual Financial Reports & Certified Financial Statements for Perry Nuclear Power Plant, Davis-Besse Nuclear Power Station & Beaver Valley Power Station | Boric Acid Incorporated by reference Backfit |
L-02-043, Supplemental Reply to Order for Interim Safeguards and Security Compensatory Measures | 17 April 2002 | Supplemental Reply to Order for Interim Safeguards and Security Compensatory Measures | B.5.b Mitigating Strategies |
L-02-044, 2001 Firstenergy Corp. Annual Report Completing Requirements for Retrospective Premimum Guarantee | 16 April 2002 | 2001 Firstenergy Corp. Annual Report Completing Requirements for Retrospective Premimum Guarantee | |
L-02-047, Year 2001-2002 Steam Generator Examination Reports, Describing the Results of the Steam Generator Eddy Current Examinations That Occurred During the Unit 1 14th Refueling Outage & the Unit 2 9th Refueling Outage | 7 May 2002 | Year 2001-2002 Steam Generator Examination Reports, Describing the Results of the Steam Generator Eddy Current Examinations That Occurred During the Unit 1 14th Refueling Outage & the Unit 2 9th Refueling Outage | |
L-02-048, Request for Regulatory Conference | 19 April 2002 | Request for Regulatory Conference | |
L-02-051, Annual Man-Rem Report | 29 April 2002 | Annual Man-Rem Report | |
L-02-053, Annual Environmental Report, Non-Radiological | 30 April 2002 | Annual Environmental Report, Non-Radiological | Grab sample Zebra Mussel Veliger Biofouling |
L-02-054, Reply to Request for Information Concerning Beaver Valley Power Station Responses to NRC Bulletins 2001-01 & 2002-01 | 10 May 2002 | Reply to Request for Information Concerning Beaver Valley Power Station Responses to NRC Bulletins 2001-01 & 2002-01 | Boric Acid Pressure Boundary Leakage Through-Wall Leak |
L-02-055, 60-Day Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | 17 May 2002 | 60-Day Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | Boric Acid Nondestructive Examination VT-2 Pressure Boundary Leakage Pressure boundary leak Scaffolding |
L-02-056, April 2002 Monthly Operating Report for Beaver Valley Power Station | 7 May 2002 | April 2002 Monthly Operating Report for Beaver Valley Power Station | |
L-02-059, 2001 Annual Environmental Report, Radiological | 15 May 2002 | 2001 Annual Environmental Report, Radiological | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
L-02-062, Ninth Refueling Outage Inservice Inspection Report | 23 May 2002 | Ninth Refueling Outage Inservice Inspection Report | Boric Acid Packing leak Non-Destructive Examination Hydrostatic VT-2 |
L-02-063, Inservice Inspection Program, Proposed Revision 11 | 8 July 2002 | Inservice Inspection Program, Proposed Revision 11 | Boric Acid |
L-02-067, Revised Decommissioning Funding Report for 2001 | 4 June 2002 | Revised Decommissioning Funding Report for 2001 | |
L-02-068, Order for Interim Safeguards & Security Compensatory Measures | 31 May 2002 | Order for Interim Safeguards & Security Compensatory Measures | |
L-02-072, Emergency Preparedness Plan Implementing Procedure (Volumes 2 & 3) | 8 July 2002 | Emergency Preparedness Plan Implementing Procedure (Volumes 2 & 3) | |
L-02-074, June 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 | 8 July 2002 | June 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 | |
L-02-077, License Amendment Request No. 179 | 24 July 2002 | License Amendment Request No. 179 | Stroke time Tornado Missile Probabilistic Risk Assessment Large early release frequency Power-Operated Valves Turbine Missile |
L-02-078, License Amendment Request Nos. 307 & 178 | 7 August 2002 | License Amendment Request Nos. 307 & 178 | Foreign Material Exclusion |
L-02-079, Mid-Cycle Core Operating Limits Report Revision | 31 July 2002 | Mid-Cycle Core Operating Limits Report Revision | |
L-02-080, Supplemental Information in Support of LAR No. 301 Positive Moderator Temperature Coefficient | 3 September 2002 | Supplemental Information in Support of LAR No. 301 Positive Moderator Temperature Coefficient | |
L-02-081, Fitness-for-Duty Program Six Month Report | 7 August 2002 | Fitness-for-Duty Program Six Month Report | Fitness for Duty |
L-02-082, Preparation & Scheduling of Operator Licensing Examinations, NRC Regulatory Issue Summary 2002-09 | 19 August 2002 | Preparation & Scheduling of Operator Licensing Examinations, NRC Regulatory Issue Summary 2002-09 | Generic Fundamentals Examination |
L-02-086, Emergency Response Data System | 7 August 2002 | Emergency Response Data System | |
L-02-087, Withdrawal of License Amendment Request 297 | 4 September 2002 | Withdrawal of License Amendment Request 297 | Exemption Request |
L-02-088, Supplemental Information in Support of License Amendment Requests 300 (Unit 1) and 172 (Unit 2) | 19 August 2002 | Supplemental Information in Support of License Amendment Requests 300 (Unit 1) and 172 (Unit 2) | |
L-02-090, Notification of Completion of Security Compensatory Measures for Beaver Valley Power Station, Unit No. 1 & No. 2 | 29 August 2002 | Notification of Completion of Security Compensatory Measures for Beaver Valley Power Station, Unit No. 1 & No. 2 | |
L-02-092, Transmittal of Commitment Changes & Report of Facility Changes, Tests & Experiments for Beaver Valley Power Station Unit No. 1 & Unit No. 2 | 30 August 2002 | Transmittal of Commitment Changes & Report of Facility Changes, Tests & Experiments for Beaver Valley Power Station Unit No. 1 & Unit No. 2 | Safe Shutdown Fire Barrier Temporary Modification Fire Protection Program |
L-02-093, Supplemental Information in Support of LAR No. 165 New Fuel Storage Racks Enrichment Limit | 11 September 2002 | Supplemental Information in Support of LAR No. 165 New Fuel Storage Racks Enrichment Limit | |
L-02-095, Response to Bulletin 2002-02, Reactor Pressure Valley Head and Vessel Head Penetration Nozzle Inspection Programs | 11 September 2002 | Response to Bulletin 2002-02, Reactor Pressure Valley Head and Vessel Head Penetration Nozzle Inspection Programs | |
L-02-100, Response to a Request for Additional Information in Support of License Amendment Request Nos. 298 & 170 | 17 October 2002 | Response to a Request for Additional Information in Support of License Amendment Request Nos. 298 & 170 | Offsite Dose Calculation Manual Process Control Program Fire Protection Program Grace period |
L-02-101, 10 CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models | 25 September 2002 | 10 CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models | Loop seal Safe Shutdown Earthquake Fuel cladding |
L-02-105, Revised Response to Generic Letter 88-14, Instrument Air Supply System Problems Affecting Safety Related Equipment, Related to Condensate Polishing Instrument Air System | 22 November 2002 | Revised Response to Generic Letter 88-14, Instrument Air Supply System Problems Affecting Safety Related Equipment, Related to Condensate Polishing Instrument Air System | |
L-02-108, Emergency Preparedness Plan and Implementing Procedures (Volumes 1, 2 & 3) | 16 November 2002 | Emergency Preparedness Plan and Implementing Procedures (Volumes 1, 2 & 3) | Safe Shutdown Boric Acid Reactor Vessel Water Level Earthquake Pressure Boundary Leakage |
L-02-112, Supplement to License Amendment Request Nos. 295 and 167 | 2 December 2002 | Supplement to License Amendment Request Nos. 295 and 167 | Shutdown Margin High Radiation Area Hydrostatic Pressure and Temperature Limits Report |
L-02-115, Response to a Request for Additional Information in Support of License Amendment Requests Nos. 300 & 172 | 2 December 2002 | Response to a Request for Additional Information in Support of License Amendment Requests Nos. 300 & 172 | |
L-02-121, Updated Information Regarding Bulletin 2001-01 & Bulletin 2002-01 | 8 January 2003 | Updated Information Regarding Bulletin 2001-01 & Bulletin 2002-01 | Boric Acid |