L-02-068, Order for Interim Safeguards & Security Compensatory Measures

From kanterella
Jump to navigation Jump to search
Order for Interim Safeguards & Security Compensatory Measures
ML021560391
Person / Time
Site: Beaver Valley
Issue date: 05/31/2002
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-02-068
Download: ML021560391 (2)


Text

SAFEGUARDS INFORMATION Beaver Valley Power Station Route 168 F

O P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077-0004 L. W. Pearce 724-682-5234 Vice President Fax: 724-643-8069 May 31, 2002 L-02-068 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Order for Interim Safeguards and Security Compensatory Measures On March 15, 2002, the FirstEnergy Nuclear Operating Company (FENOC) submitted a response (L-02-022) to the NRC Order for Interim Safeguards and Security Compensatory Measures for Beaver Valley Power Station (BVPS) Units 1 & 2 issued on February 25, 2002.

In conjunction with this response, FENOC submitted a request (L-02-030) for an extension of time until June 6, 2002, to submit an answer and request a hearing for Interim Compensatory Measure B.2.a.

Evaluations to determine appropriate actions for compliance with Interim Compensatory Measure B.2.a have been completed for BVPS.

Based on these evaluations, BVPS intends to comply with the requirements of Interim Compensatory Measure B.2.a, as described in the Enclosure to this response.

No request for hearing will be filed by BVPS in regards to this matter. Complete implementation will be achieved no later than August 31, 2002, as required by the Order.

The information contained in the Enclosure to this letter is considered Safeguards Information under the provisions of 10 CFR 73.21, and is thereby exempt from public disclosure.

If there are any questions concerning this

matter, please contact Mr. Kenneth E. Halliday, Manager Nuclear Security at 724-682-5072.

I declare under penalty of perjury that the foregoing is true and correct. Executed on May 31, 2002.

_i e ely, ENCLOSURES CONTA!N SAFEGUARDS INFORMATION, UPON SEPARATION LW. Pearce TIAIS PAGE 1S DECONTROLLED SAFE-GUARDS INFORMATION J~

SAFEGUARDS INFORMATION Beaver Valley Power Station, Unit No. 1 and No. 2 Order for Interim Safeguards and Security Compensatory Measures for BVPS L-02-068 Page 2 Enclosure (contains Safeguards Information) c:

Addressee (4 copies of enclosure)

Mr. D. S. Collins, Project Manager (w/o enclosure)

Mr. D. M. Kern, Sr. Resident Inspector (1 copy)

Mr. H. J. Miller, NRC Region I Administrator (2 copies)

Mr. Glenn Tracy, Chief, Reactor Safeguards (1 copy)

Mr. S. J. Collins, Director, Office of Nuclear Reactor Regulation (1 copy)

ENCLOSURES CONTAIN SAFEGUARDS INFORMATION. UPON SEPARATION THIS PAGE IS DECONTROLLEO SAFEGUARDS INFORMATION