Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
JAFP-01-0246, Proposed Change to the Technical Specifications Regarding Allowable MSIV Leakage (JPTS-01-004)9 January 2002Proposed Change to the Technical Specifications Regarding Allowable MSIV Leakage (JPTS-01-004)
JAFP-02-0015, Response to NRC Regulatory Issue Summary 2001-21, Licensing Action Estimates for Operating Reactors.22 January 2002Response to NRC Regulatory Issue Summary 2001-21, Licensing Action Estimates for Operating Reactors.Missed surveillance
JAFP-02-0029, Improved Technical Specifications Submittal6 February 2002Improved Technical Specifications Submittal
JAFP-02-0035, Facility Ltr Qualification Requirements Clarification Dtd 2/13/0213 February 2002Facility Ltr Qualification Requirements Clarification Dtd 2/13/02
JAFP-02-0048, 2001 Personnel Radiation Exposure Summary Report12 February 20022001 Personnel Radiation Exposure Summary Report
JAFP-02-0051, Semi-Annual Radioactive Effluent Release Report for July 1, 2001 Through December 31, 200128 February 2002Semi-Annual Radioactive Effluent Release Report for July 1, 2001 Through December 31, 2001Offsite Dose Calculation Manual
JAFP-02-0052, Annual Report, Safety Relief Valve Challenges and Failures, for James A. FitzPatrick Nuclear Power Plant28 February 2002Annual Report, Safety Relief Valve Challenges and Failures, for James A. FitzPatrick Nuclear Power PlantCorrosion bonding
JAFP-02-0064, Revised November 2001 Monthly Operating Report for James A. FitzPatrick15 March 2002Revised November 2001 Monthly Operating Report for James A. FitzPatrick
JAFP-02-0070, Proposed License Conditions Supporting the Implementation of Improved Standard Technical Specifications27 March 2002Proposed License Conditions Supporting the Implementation of Improved Standard Technical Specifications
JAFP-02-0097, 2001 Radiological Environmental Operating Report30 April 20022001 Radiological Environmental Operating ReportGrab sample
Annual Radiological Environmental Operating Report
Chernobyl
JAFP-02-0115, Registration of Spent Fuel Cask Use21 May 2002Registration of Spent Fuel Cask Use
JAFP-02-0124, Revision K to Proposed Technical Specification Change (License Amendment) Conversion to Improved Standard Technical Specifications11 June 2002Revision K to Proposed Technical Specification Change (License Amendment) Conversion to Improved Standard Technical SpecificationsReactor Vessel Water Level
Scram Discharge Volume
JAFP-02-0138, Updated Markup and Retyped Technical Specification Pages for Proposed Change to the Technical Specifications Regarding Allowable MSIV Leakage10 July 2002Updated Markup and Retyped Technical Specification Pages for Proposed Change to the Technical Specifications Regarding Allowable MSIV LeakageSquib
JAFP-02-0139, James a FitzPatrick Core Operating Limits Report, Revision 12 (Cycle 15 Update)10 July 2002James a FitzPatrick Core Operating Limits Report, Revision 12 (Cycle 15 Update)
JAFP-02-0142, June 2002 Monthly Operating Report for James A. FitzPatrick15 July 2002June 2002 Monthly Operating Report for James A. FitzPatrick
JAFP-02-0146, Updated Markup and Retyped Technical Specification Pages for Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling...17 July 2002Updated Markup and Retyped Technical Specification Pages for Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling...Ultimate heat sink
Stroke time
Qualified Offsite Circuit
Recently irradiated fuel
Offsite Circuit
JAFP-02-0159, Implementation of Technical Specification Amendment No. 274 (Improved Technical Specifications) from James A. FitzPatrick8 August 2002Implementation of Technical Specification Amendment No. 274 (Improved Technical Specifications) from James A. FitzPatrick
JAFP-02-0193, Core Operating Limits Report Revision 13 (Cycle 15 Update)24 September 2002Core Operating Limits Report Revision 13 (Cycle 15 Update)
JAFP-02-0194, Proposed Revision of Relief Request VRR-06 for In-Service Testing Program30 September 2002Proposed Revision of Relief Request VRR-06 for In-Service Testing ProgramStroke time
Power-Operated Valves
JAFP-02-0195, Letter Regards 10 CFR Part 21 Notification EC-1 Overcurrent Sensors Failed Prematurely2 October 2002Letter Regards 10 CFR Part 21 Notification EC-1 Overcurrent Sensors Failed Prematurely
JAFP-02-0199, September 2002 Monthly Operating Report for James A. FitzPatrick14 October 2002September 2002 Monthly Operating Report for James A. FitzPatrick
JAFP-02-0200, Core Operating Limits Report Revision 14 (Cycle 16)14 October 2002Core Operating Limits Report Revision 14 (Cycle 16)
JAFP-02-0210, 10 CFR 50.46 Reporting of Changes in Emergency Core Cooling System (ECCS) Evaluation Model12 November 200210 CFR 50.46 Reporting of Changes in Emergency Core Cooling System (ECCS) Evaluation Model
JAFP-02-0212, Proposed Revision of Relief Request No. VRR-04 to JAFNPP In-Service Testing Program12 November 2002Proposed Revision of Relief Request No. VRR-04 to JAFNPP In-Service Testing Program
JAFP-02-0225, October 2002 Monthly Operating Report for FitzPatrick, Rev 112 December 2002October 2002 Monthly Operating Report for FitzPatrick, Rev 1
JAFP-02-0251, In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16)26 December 2002In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16)VT-2
EVT-1
JAFP-03-0050, March 2003 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant14 April 2003March 2003 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant
JAFP-03-0052, 2002 Personnel Radiation Exposure Summary Report15 April 20032002 Personnel Radiation Exposure Summary Report
JAFP-03-0056, Annual Radioactive Effluent Release Report for January 1, 2002 Through December 31, 200223 April 2003Annual Radioactive Effluent Release Report for January 1, 2002 Through December 31, 2002High winds
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
JAFP-03-0065, Summary of Plant Changes, Tests, & Experiments for 2001/2002 as Required by 10 CFR 50.59 & 10 CFR 72.48, & Summary of Commitment Changes for 2001/200212 May 2003Summary of Plant Changes, Tests, & Experiments for 2001/2002 as Required by 10 CFR 50.59 & 10 CFR 72.48, & Summary of Commitment Changes for 2001/2002Safe Shutdown
Unanalyzed Condition
Non-Destructive Examination
Post Accident Monitoring
Temporary Modification
Code Reconciliation
Control of Heavy Loads
Fuel cladding
EVT-1
Liquid penetrant
Fire Protection Program
Early Warning Fire Detection
JAFP-03-0067, April 2003 Monthly Operating Report for James A. Fitzpatrick Nuclear Power Plant15 May 2003April 2003 Monthly Operating Report for James A. Fitzpatrick Nuclear Power Plant
JAFP-03-0068, March 2003 Monthly Operating Report for James A. FitzPatrick, Revision 114 May 2003March 2003 Monthly Operating Report for James A. FitzPatrick, Revision 1
JAFP-03-0070, Transmittal of Annual Radiological Environmental Operating Report 200215 May 2003Transmittal of Annual Radiological Environmental Operating Report 2002Annual Radiological Environmental Operating Report
JAFP-03-0083, May 2003 Monthly Operating Report for James A. Fitzpatrick Nuclear Power Plant12 June 2003May 2003 Monthly Operating Report for James A. Fitzpatrick Nuclear Power Plant
JAFP-03-0096, James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing Program8 July 2003James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing ProgramHydrostatic
JAFP-03-0097, June 2003 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant9 July 2003June 2003 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant
JAFP-03-0107, Proposed Relief Request No. VRR-09 to the JAFNPP In-Service Testing Program28 July 2003Proposed Relief Request No. VRR-09 to the JAFNPP In-Service Testing Program
JAFP-03-0108, Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension28 July 2003Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval ExtensionSafe Shutdown
High winds
Probabilistic Risk Assessment
Coatings
Design basis earthquake
Large early release frequency
Earthquake
JAFP-03-0111, Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds Pursuant to 10 CFR 50.55a (g)(6)(i)4 August 2003Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds Pursuant to 10 CFR 50.55a (g)(6)(i)
JAFP-03-0113, Relief from ASME Code, Section XI, Appendix Viii, Supplement 10, Performance Demonstration for Ultrasonic Examination Systems.5 August 2003Relief from ASME Code, Section XI, Appendix Viii, Supplement 10, Performance Demonstration for Ultrasonic Examination Systems.Dissimilar Metal Weld
JAFP-03-0115, July 2003 Monthly Operating Report for James A. FitzPatrick12 August 2003July 2003 Monthly Operating Report for James A. FitzPatrick
JAFP-03-0124, CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models28 August 2003CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models
JAFP-03-0130, August 2003 Monthly Operating Report for James a FitzPatrick Nuclear Power Plant15 September 2003August 2003 Monthly Operating Report for James a FitzPatrick Nuclear Power PlantDownpower
JAFP-03-0137, Operator Licensing Examination Data9 October 2003Operator Licensing Examination DataGeneric Fundamentals Examination
JAFP-03-0140, (JAFNPP) - Proposed Relief Request No. VRR-09 to the JAFNPP In-Service Testing Program15 October 2003(JAFNPP) - Proposed Relief Request No. VRR-09 to the JAFNPP In-Service Testing Program
JAFP-03-0154, October 2003 Monthly Operating Report for James a FitzPatrick7 November 2003October 2003 Monthly Operating Report for James a FitzPatrickPower change
JAFP-03-0169, November 2003 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant8 December 2003November 2003 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant
JAFP-03-0179, Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds, Per 10CFR50.55a(g)(6)(i)30 December 2003Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds, Per 10CFR50.55a(g)(6)(i)
JAFP-04-0004, December 2003 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant12 January 2004December 2003 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant
JAFP-04-0012, Physical Security Plan, Revision 2219 January 2004Physical Security Plan, Revision 22