Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BYRON 2002-0005, Revision 1 to Byron Stations 1 and 2, Cycles 11a and 10a, Core Operating Limits Reports17 January 2002Revision 1 to Byron Stations 1 and 2, Cycles 11a and 10a, Core Operating Limits ReportsShutdown Margin
BYRON 2002-0023, Revision 3 to Cycle 11A Core Operating Limits Report27 February 2002Revision 3 to Cycle 11A Core Operating Limits ReportShutdown Margin
BYRON 2002-0033, Regulatory Commitment Change Summary Report28 March 2002Regulatory Commitment Change Summary ReportBiofouling
BYRON 2002-0034, 2001 Annual Radioactive Effluent Release Report26 April 20022001 Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
BYRON 2002-0035, Annual Environmental Operating Report15 April 2002Annual Environmental Operating Report
BYRON 2002-0038, Notification of Modification Completion in Support of License Amendment to Revise Technical Specification Requirements Associated with the Boron Dilution Protection System17 May 2002Notification of Modification Completion in Support of License Amendment to Revise Technical Specification Requirements Associated with the Boron Dilution Protection System
BYRON 2002-0040, Occupational Radiation Exposure Report24 April 2002Occupational Radiation Exposure ReportDeep Dose Equivalent
BYRON 2002-0050, Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles.26 April 2002Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles.Boric Acid
VT-2
BYRON 2002-0051, Response to NRC Bulletin 2002-001, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity.26 April 2002Response to NRC Bulletin 2002-001, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
BYRON 2002-0053, 2001 Annual Radiological Environmental Operating Report13 May 20022001 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
BYRON 2002-0056, April 2002 Monthly Operating Report for Byron Station, Units 1 & 215 May 2002April 2002 Monthly Operating Report for Byron Station, Units 1 & 2Offsite Dose Calculation Manual
BYRON 2002-0073, June 2002 Monthly Operating Report for Byron Units 1 & 215 July 2002June 2002 Monthly Operating Report for Byron Units 1 & 2
BYRON 2002-0074, Cycle 12 Core Operating Limits Report, Revision 26 August 2002Cycle 12 Core Operating Limits Report, Revision 2Shutdown Margin
BYRON 2002-0075, Response to Request for Additional Information Regarding Inspection Plans for the Byron Station Unit 2 Reactor Vessel Head During the Fall 2003 Refueling Outage in Support of NRC Bulletin 2002-0126 July 2002Response to Request for Additional Information Regarding Inspection Plans for the Byron Station Unit 2 Reactor Vessel Head During the Fall 2003 Refueling Outage in Support of NRC Bulletin 2002-01Boric Acid
BYRON 2002-0100, Cycle 11 Core Operating Limits Report27 September 2002Cycle 11 Core Operating Limits ReportShutdown Margin
BYRON 2002-0102, Steam Generator Tube Repairs Resulting from Byron Station, Unit 2 Cycle 10 Refueling Outage8 October 2002Steam Generator Tube Repairs Resulting from Byron Station, Unit 2 Cycle 10 Refueling Outage
BYRON 2002-0109, Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Head Penetration Nozzles25 October 2002Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Head Penetration NozzlesBoric Acid
VT-2
BYRON 2002-0110, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.25 October 2002Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
BYRON 2002-0111, Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs.25 October 2002Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs.Boric Acid
VT-2
BYRON 2002-0115, LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an Individual25 October 2002LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an IndividualFitness for Duty
BYRON 2002-0129, Generator Inservice Inspection Summary Report10 December 2002Generator Inservice Inspection Summary ReportNondestructive Examination
BYRON 2002-0133, November 2002 Monthly Operating Report for Byron Station, Units 1 & 216 December 2002November 2002 Monthly Operating Report for Byron Station, Units 1 & 2Offsite Dose Calculation Manual
BYRON 2002-0135, Day Inservice Inspection Report for Interval 2, Period 2, Outage 1 (B2R10)3 January 2002Day Inservice Inspection Report for Interval 2, Period 2, Outage 1 (B2R10)
BYRON 2002-5006, Steam Generator Tube Repairs Resulting from Cycle 11 Refueling Outage28 March 2002Steam Generator Tube Repairs Resulting from Cycle 11 Refueling Outage
BYRON 2002-5008, Steam Generator Inservice Inspection Summary Report13 June 2002Steam Generator Inservice Inspection Summary ReportNondestructive Examination
BYRON 2003-0017, January 2003 Monthly Operating Report for Byron Units 1 & 215 February 2003January 2003 Monthly Operating Report for Byron Units 1 & 2Offsite Dose Calculation Manual
BYRON 2003-0019, Annual Environmental Operating Report24 March 2003Annual Environmental Operating Report
BYRON 2003-0023, February 2003 Monthly Operating Report for Byron Station, Units 1 & 215 March 2003February 2003 Monthly Operating Report for Byron Station, Units 1 & 2Offsite Dose Calculation Manual
BYRON 2003-0025, Regulatory Commitment Change Summary Report1 April 2003Regulatory Commitment Change Summary ReportBoric Acid
Ultimate heat sink
VT-2
BYRON 2003-0035, Occupational Radiation Exposure Report30 April 2003Occupational Radiation Exposure ReportDeep Dose Equivalent
BYRON 2003-0036, Annual Radioactive Effluent Release Report26 April 2003Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
BYRON 2003-0043, April 2003 Monthly Operating Report for Byron Station Units 1 & 215 May 2003April 2003 Monthly Operating Report for Byron Station Units 1 & 2Offsite Dose Calculation Manual
BYRON 2003-0064, Revision to Reactor Coolant System Pressure & Temperature Limits Report17 July 2003Revision to Reactor Coolant System Pressure & Temperature Limits ReportHydrostatic
Pressure and Temperature Limits Report
BYRON 2003-0070, July 2003 Monthly Operating Report for Byron Units 1 & 215 August 2003July 2003 Monthly Operating Report for Byron Units 1 & 2Offsite Dose Calculation Manual
BYRON 2003-0079, to Byron, Unit 1 Cycle 12, Core Operating Limits Report and Revision1 to Byron, Unit 2 Cycle 11, Core Operating Limits Report28 August 2003to Byron, Unit 1 Cycle 12, Core Operating Limits Report and Revision1 to Byron, Unit 2 Cycle 11, Core Operating Limits ReportShutdown Margin
BYRON 2003-0093, Issuance of Core Operating Limits Report for Byron Unit One Cycle 137 October 2003Issuance of Core Operating Limits Report for Byron Unit One Cycle 13Shutdown Margin
BYRON 2003-0110, October 2003 Monthly Operating Report for Byron Station, Units 1 and 214 November 2003October 2003 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2003-0114, Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.12 December 2003Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
Through-Wall Leak
BYRON 2003-0115, Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.12 December 2003Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.Boric Acid
VT-2
BYRON 2003-0116, November 2003 Monthly Operating Report for Byron Station Units 1 and 215 December 2003November 2003 Monthly Operating Report for Byron Station Units 1 and 2Offsite Dose Calculation Manual
BYRON 2004-0002, December 2003 Monthly Operating Report for Byron Station, Units 1 and 215 January 2004December 2003 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2004-0004, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12)12 January 2004Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12)Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Moisture barrier
Pressure Boundary Leakage
BYRON 2004-0017, January 2004 Monthly Operating Report for Byron Station Units 1 and 213 February 2004January 2004 Monthly Operating Report for Byron Station Units 1 and 2Offsite Dose Calculation Manual
BYRON 2004-0028, February 2004 Monthly Operating Report for Byron Station, Units 1 and 215 March 2004February 2004 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2004-0030, Annual Environmental Operating Report16 April 2004Annual Environmental Operating Report
BYRON 2004-0033, Supplemental One to Licensee Event Report (LER) 454-2003-003-00, Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements Caused by Signal Noise Contamination31 March 2004Supplemental One to Licensee Event Report (LER) 454-2003-003-00, Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements Caused by Signal Noise Contamination
BYRON 2004-0035, Regulatory Commitment Change Summary Report1 April 2004Regulatory Commitment Change Summary ReportGrace period
BYRON 2004-0036, Issuance of Core Operating Limits Report, Cycle 125 April 2004Issuance of Core Operating Limits Report, Cycle 12Shutdown Margin
BYRON 2004-0037, March 2004 Monthly Operating Report for Byron Units 1 & 215 April 2004March 2004 Monthly Operating Report for Byron Units 1 & 2Offsite Dose Calculation Manual
BYRON 2004-0038, Steam Generator Tube Repairs Resulting from Byron, Unit 2, Cycle 11 Refueling Outage17 April 2004Steam Generator Tube Repairs Resulting from Byron, Unit 2, Cycle 11 Refueling Outage