Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-86-280, Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments4 April 1985Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments
IA-96-492, Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants25 November 1996Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants
IR 05000354/199700819 February 1998Forwards NRC Operator Licensing Exam Rept 50-354/97-08 (Including Completed & Graded Tests) for Tests Administered on 970929-1002Reactor Vessel Water Level
Job Performance Measure
Failure to Scram
ML18095A43324 July 1990Advises That NRC Initiated Formal Section 7 Consultation W/ Dept of Commerce on 900618 Re Util Preparation of Biological Assessment of Plants
ML18101A78513 June 1995Advises That Util Current Drawer I Will Be Changed to Drawer 0509,effective 950612.Ltr from Hancocks Bridge Post Ofc Encl
ML20054K95815 June 1982Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology
ML20055G43328 June 1990Forwards D Kwiatkowski of FEMA Transmitting FEMA Region I Rept for 881129-1201 Full Participation Exercise at Plants.Evaluation of 881202 Medical Drill Also Included in Rept.Encls Should Be Transmitted to Licensee
ML20058C77310 November 1993Notification of 931220 Enforcement Conference in Region I Ofc to Discuss Violations Noted in MOV NRC Team Insp
ML20058D32130 October 1990Documents Various Observations Made During INPO 900813-24 Evaluation Process at Facility
ML20059G16227 October 1993Notification of Significant Licensee Meeting 93-135 W/Util on 931207 to Discuss Hope Creek Motor Operated Valve NRC Team Insp Violation
ML20125C5212 March 1978Notification of 790309 Meeting W/Mark I Owners Group in Bethesda,Md to Discuss Changes in Mark I Long Term Plan as Reflected in Rev 3 to Mark I Owners Group Program Action Plan
ML20126L09710 June 1985Forwards Sargent & Lundy Idvp Observation Repts 1-48 & 50Finite Element Analysis
Battery sizing
Earthquake
ML20126L9906 June 1985Forwards Details of Progress to Date in Resolving Open/Confirmatory Items Identified in Facility Ser.Issues Requiring Staff Action Listed
ML20126M56417 July 1985Forwards Info Generated by Idvp Effort.Addl Correspondence Included in Author 850610,21 & 0702 Memos to Central FilesSafe Shutdown
Reactor Vessel Water Level
Fire Barrier
Slow transfer
Tornado Missile
Finite Element Analysis
Battery sizing
ML20127A50710 June 1985Forwards Sargent & Lundy Idvp Observation Repts 1-48 & 50 for FacilityFinite Element Analysis
Battery sizing
Earthquake
ML20127C2989 November 1984Forwards Operability Qualification of Purge & Vent Valves & Guidelines for Demonstration of Operability of Purge & Vent Valves.Info Sought Should Be Provided as Soon as Possible
ML20128C33221 June 1985Forwards Observation Repts 49 & 51-72 & Bechtel Resolution Repts for Observation Repts 1-25,27-38,41-44,46 & 47 Re Sargent & Lundy,Inc Idvp of Facility.Addl Correspondence Included in Butler 850610 MemoSafe Shutdown
Hydrostatic
Nondestructive Examination
VT-2
Finite Element Analysis
Battery sizing
Liquid penetrant
ML20128E03819 December 1975Discusses Review of Question Round One -Mark I Short Term Program Final Rept & Proposed Long Term Program (TAR-1989/ ORB-3-105 Rev One) & Requests Addl Info Be Provided.List of Addl Info EnclEarthquake
ML20128K24612 February 1993Notification of 930224 Meeting W/Bwrog in Rockville,Md to Discuss Hope Creek Amend Request & SE Status (Increase MSIV Leakage,Remove Leakage Control Sys & Use Ms Lines & Condenser for Treatment)
ML20128M70218 July 1985Notification of 850801 Meeting W/Util in Bethesda,Md to Present Util Plans Re Proposed Compression of Power Ascension Program
ML20129B70112 July 1985Notification of 850718 Meeting W/Util in Lower Alloways Creek Township,Nj Re 850715-18 Environ Qualification Audit
ML20129D2365 July 1985Notification of 850716 Meeting W/Util in Lower Alloways Creek Township,Nj to Discuss Util Organizational Structure
ML20129E64724 May 1985Notification of 850626-27 Meetings W/Util in Salem,Nj to Assess Status of Const Completion.Agenda Encl
ML20129K2565 November 1996Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness
ML20133A57625 July 1985Notification of 850808 Exit Meeting W/Util in Lower Alloways Creek Township,Nj to Discuss 850807-08 Electrical Audit
ML20133C34225 July 1985Notification of 850731 Meeting W/Util & Sargent & Lundy in Bethesda,Md to Discuss Idvp
ML20133H27210 October 1985Advises That Encl Draft Comments on Rev 0 to Offsite Dose Calculation Manual Forwarded to Util.Comments Not Representative of Manual Comments to Be Issued in Near FutureOffsite Dose Calculation Manual
ML20134C64415 January 1992Forwards Security & Safeguards SALP Input for Plants.Input Covers Period of 900801-911228Boric Acid
Downpower
ML20134C6504 May 1995Informs That Due to Pending EAs at Both Plants Scope of 950530 Eppr Has Been Reduced.Meeting Will Be Limited to 1 HSafe Shutdown
Boric Acid
Loop seal
Grab sample
Commercial Grade Dedication
Internal Flooding
Enforcement Discretion
Temporary Modification
Operability Determination
Through Wall Leak
Fire Protection Program
Fire Watch
Scaffolding
ML20134C7737 July 1993Forwards Security & Safeguards SALP Input for Plants Covering Period 911229-930619
ML20134C81416 January 1992Forwards SALP Input Relating to Emergency Preparedness for Period 900816-911231
ML20134D71624 October 1996Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary
ML20134K75423 August 1985Forwards Listed Correspondence Between Util,Sargent & Lundy,Inc & Bechtel Generated by Idvp Efforts
ML20134K8699 February 1996Partially Deleted Ltr Requesting OGC Interpretation of 10CFR50.5 Re Situation That Occurred at Util Plant
ML20135A63920 November 1996Summarizes 940602 Meeting W/Listed Individuals to Discuss Items of Mutual Interest Re Plant Performance & Improvement Plans
ML20135A8502 August 1993Discusses 930723 Pse&G Visit W/Listed Individuals to Discuss Items of Mutual Interest Re Hope Creek & Salem,Units 1 & 2 NPPNJPDES
ML20135B17913 December 1994Discusses Pse&G 941129 drop-in Visit W/Listed Individuals to Discuss Items of Mutual Interest Including Plant Hope Creek & Salem Generating Station Performance
ML20135B35727 February 1996Discusses 960222 Visit W/Listed Individuals to Discuss Issues Re Salem & Hope Creek Generating Stations
ML20135B37323 August 1996Partially Deleted Memo Re 960826 Drop in Meeting
ML20135B37823 August 1996Partially Deleted Memo Re Courtesy Visit W/Ej Ferland & Lr Eliason on 960826
ML20135B38313 September 1996Discusses 960826 Meeting W/Listed Individuals to Discuss Current Activities & Issues Involving Hope Creek & Salem Npps.Info Partially Deleted
ML20137A9319 January 1986Submits Evaluation of Util Proposal for Eliminating Postulation of Eight Arbitrary Intermediate Breaks in Main Steam Sys & Three Arbitrary Intermediate Breaks in RWCU Sys Inside Containment.Request Acceptable
ML20137B07825 November 1996Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants
ML20137G48314 August 1985Notification of 850828 Meeting W/Util in Lower Alloways Creek Township,Nj to Conduct SPDS Design Verification & Validation Audit
ML20137M38221 January 1986Forwards Sser Input Re Acceptability of Item F (Traversing Incore Probe Sys) of Proposed Deferrals of Sys at Fuel Loading Time.Proposed Postponement Acceptable.Salp Input Also Encl
ML20137Y0925 March 1986Notification of 860310 & 11 Meetings W/Util in Salem & Lower Alloways Creek Township,Nj,Respectively,To Discuss Readiness for Low Power Ol.Agenda Encl
ML20138J55311 December 1985Notification of 851219 Meeting W/Util in Bethesda,Md to Discuss Transition for Const to Operations Organization
ML20138M23716 December 1985Forwards Sser & SALP Input for Second in Series of Proposed Power Ascension Test Program Mods.Changes Acceptable Except for Elimination of Testing at Test Condition 4
ML20138P96920 December 1984Summarizes ACRS 296th Meeting W/Nrc & Util to Review Application for OL for Hope Creek Generating Station,Unit 1.Clarification of ACRS Congressional Testimony Re Proposed Rule to Limit Use of Highly Enriched U Also Discussed
ML20140B32413 January 1986Notification of 860117 Meeting W/Util in Bethesda,Md to Discuss Completion Status of Radiation Monitoring Sys Components