JAN 217525 MEl'.0RANDUM FOR: Elinor Adensam, Director DISTRIBUTION EKR Project Directorate No. 3 1 Docket: File; Division of BWR Licensing NRC PDR Local PDR FROM:
Gus C. Lainas, Assistant Director PD#3 Reeding for BWR AD/BWR, PWR-A,B Division of BLR Licensing DWagner EHylton
SUBJECT:
HCPE CREEK GENERATING STATION - SUPPLE!! ENTAL SAFETY EVALUATION REPORT INPUT - COMPLETION OF TIP SYSTEll Plant Name:
Hope Creek Generating Station Docket No.:
50-354 Licensing Status:
OL Responsible Branch: BWR-PD#3 Project Manager:
D. Wagner Revicw Branch:
RSB Review Status:
Complete In response to your memorandun dated January 6,1986, the Reactor Systems Branch has reviewed item F (the TIP systen) of the proposed deferrals of Hope Creek systems at fuel loading time. We find this proposed postponement to be acceptable. Our evaluation is enclosed. is our input to SALP.
O.-
l Si n~1 by Gus C. Lainas,' Assistant Director for BWR Division of BUR Licensing
Enclosures:
As stated cc w/ enclosures:
R. Bernero L. Phillips D. Wagner CONTACT:
H. Richings, X29418
- Previously concurred:
RSB RSB AD
- HRichings
- LPhillips G at as 01/16/86 01/16/86 01// / /86 8601280250 860121 PDR ADOCK 05000354 A
/
~%,
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
c j.
wAsHiNorow, o. c. 20sss
'+4..... /
JAN 211956 4
MEMORANDUM FOR:
Elinor Adensam, Director BWR Project Directorate No. 3 Division of BWR Licensing FROM:
Gus C. Lainas, Assistant Director for BWR Division of BWR Licensing
SUBJECT:
HOPE CREEK GENERATING STATION - SUPPLEMENTAL SAFETY EVALUATION REPORT INPUT - COMPLETION OF TIP SYSTEM Plant Name:
Hope Creek Generating Station Docket No.:
50-354 Licensing Status:
OL Responsible Branch: BWR-PD#3 Project Manager:
D. Wagner Review Branch:
RSB Review Status:
Complete In response to your memorandum dated Januar Branch has reviewed item F (the TIP system)y 6, 1986, the Reactor Systems of the proposed deferrals of Hope Creek systems at fuel loading time. We find this proposed postponement to be acceptable. Our evaluation is. enclosed. is our input to SALP.
e d -'
i Gus C. Lainas, Assistant Director for BWR Division of BWR Licensing
Enclosures:
As stated cc w/ enclosures:
R. Bernero L. Phillips D. Wagrer CONTACT:
H. Richings, X29418 i
I
Enclosure Acceptability of Item F of Hope Creek Construction Item Deferrals Item F of the attachment of the November 29, 1985 letter frora PSE&G discussing Hope Creek Deferrals proposes to postpone the performance of the Traversing Incore Probe (TIP) Preoperational Test until prior to initial criticality of the Hope Creek plant. The TIP system is used for calibration of the Local Power Range Monitors (LPRMs) when they are to be used for monitoring core thermal limits. Since such monitoring is required only for core power greater than 25% of rated the TIP system is not needed below 5% of rated power. The Source Range Monitors and Intermediate Range Monitors provide the needed core protection at these low power values.
On the basis that the TIP system is not required to be operational until core power is greater than 25% of rated we conclude that postponement of the TIP system preoperational system test as proposed by the applicant is acceptable.
O
=
l i
,,, _ _ ~
j..
e 4
SALP INPUT FOR HOPE CREEK 1.
Management Involvement l
The documentation presented with the proposed test change request was satisfactory.
i Rating:
Category 1 2.
Resolution of Technical Issues The documentation showed a clear understanding of the technical issues involved.
l Rating:
Category 1 3.
Responsiveness to NRC Initiatives 4
There were no NRC questions Rating: ' None l