Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
FVY-86-105, Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl10 November 1986Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl
LD-84-063, Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde26 October 1984Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde
ML17223A74526 January 1990Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N
ML17261A53018 June 1987Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys
ML18093A8286 May 1988Part 21 & Deficiency Rept Re Asea Brown Boveri,Power Distribution,Inc Low Voltage K-Line Circuit Breakers. Efforts Underway to Define Quantity & Type of Component Parts That May Need to Be Replaced
ML18153C1012 February 1990Part 21 Rept Re Two of Three Pc Cards in GE Type SLV11A1 Over/Undervoltage Relays Failing to Produce Output.Short Between Leads Would Result in Damage to Component 1C5. Sketch of Threshold Detection Board Encl
ML19257A52226 December 1979Deficiency Rept Re Drop Rod Analysis.Interim Changes Will Be Implemented Pending Westinghouse Topical Rept Containing plant-specific,long-term Solutions
ML19259A7174 January 1979Containment Tendon Deficiency Interim Rept.Describes Insp & Tests of pre-stressing Tendon Button Heads That Developed Unusually High Number of Defects.Final Rept Containing Evaluation of Test Will Be Submitted
ML19259C2096 June 1979Deficiency Rept:Nonconformance of Ventilation Steel Stack.Nondestructive Examination Revealed Crack in Stack. Permanent Repair Under Study.Final Rept Will Be Submitted by 791001Nondestructive Examination
ML19289C9155 January 1979Interim Deficiency Rept on Button Heads Splits of Tendons Used to pre-stress Concrete Containment.Ref 781130 Nonconformance Rept 78-19.Describes Planned Test Program. Final Report Will Be Submitted by 790415
ML19290E23527 February 1980Final Deficiency Rept Re Isolated Defects in Stub Columns. All Stub Columns Repaired.Single Spacer Plate of Same Matl on Order.Insp Made of 100% of Unit 2.Insp of Unit 1 70% Complete
ML19296D88629 February 1980Second Interim Deficiency Rept Re Failure of Two Field Anchorheads for Horizontal Tendons Used to post-tension Concrete Containment.Addl Tendons Detensioned to Minimize Asymmetric Loads on Containment Bldg
ML19302F75823 April 1985Corrects Typo in Second Interim Deficiency Rept 84-03 Re Installation of Butt Splices in Electrical Connectors.Rept Should Have Indicated That 564 Splices Documented But Not Inspected
ML19309F9288 April 1980Supplementary Deficiency Rept Re AH90 & NH90 Series Actuators Supplied by Itt General Controls.Itt General Control Will Supply Actuator Force Values & Torque & Damper Torque Values Will Be Compared.Customer List Encl
ML19309H95115 May 1980Interim Deficiency Rept 3 Re post-tensioning Anchorhead Failure.Acceptance Criteria Being Developed by Inryco,Inc to Establish Acceptability of Replacement Anchorheads.Testing Completed by 800630,w/final Rept Submitted at That Time
ML19320A80227 June 1980Interim Deficiency Rept Re Failure of post-tensioning Anchorheads.Generally Concurs W/Inryco 800530 Rept.All Category B Heat Treat Lots Will Be Tested.Replacement Anchorheads from Accepted Heat Treat Lots Will Be Installed
ML19325C95229 September 1989Part 21 Rept Re Potential Common Failure of SMB-000 & SMB-00 Cam Type Torque Switches Supplied Prior to 1981 & 1976. Vendor Recommends That Switch W/Fiber Spacer Be Replaced
ML19325E08616 October 1989Followup Part 21 Rept Re Class 1E Battery Chargers W/ Transformers Running at Temps Exceeding Those Used in Qualification Rept When Operating at or Near Full Load Rating of Equipment.Listed Corrective Actions Underway
ML19330A37720 June 1980Part 21 Report Re Installed Tech-Sil,Inc Matls Containing 5% Gel Which Cannot Be Traced in Original Formulation.Cause Not Stated.Unused Matl Has Been Returned to Vendor. Noncompliance Rept 9 Encl
ML19330A61423 July 1980Deficiency Rept Re Intermittent Contact Operation of W-2 Switch.Util Will Not Implement Interim Fix Unless No Permanent Solution Is Available Prior to Fuel Load.Util Will Monitor Westinghouse Recommendations
ML19337A67019 September 1980Final Interim Deficiency Rept Re MSIV Leakage Control Sys E32 Being installed.E23 Equipment Cannot Meet Functional Requirements to Relieve Steamline Pressure.Mods Being Implemented & Will Be Completed Prior to Fuel Load
ML19339A1722 October 1980Interim Deficiency Rept Re Cracks in Insulation of Certain Feed Through Conductors of Entrance or Exit of Epoxy Module Portion of Penetration.Rework Procedure Has Not Been Formally Submitted.Supplemental Rept Expected by 810101
ML19341A39919 January 1981Final Deficiency Rept Re Electrical Termination Lug Design. Insp of Control Room Panels & Replacement of Improper Lugs Completed
ML19341A40119 January 1981Final Deficiency Rept Re Valve Yoke Matl in Anchor/Darling Valves,Initially Reported on 801218.Schedule Has Been Established for Shipment of 138 New Yokes Between 810227 & 0424.Defective Yokes Will Be Replaced & Destroyed
ML19347C0728 October 1980Final Deficiency Rept Re Small Pipe Hanger Design Deficiency.Review Program Documented & Audits of Design Control & Review Performed.Surveillance Program to Monitor Work Instituted.Periodic Repts Will Be Submitted After Insp
ML19347C75224 December 1980Provides 30-day Notification of Possible Deficiency Re Incorrect Suppression Pool Water Vol in Fsar,Initially Reported 801126.Caused by Diffused Responsibility for Calculation.Pool Temp Transient Will Be Reanalyzed
ML19347F50811 May 1981Interim Deficiency Rept,Originally Reported on 810409,re Containment post-tensioning Breakdown of Vendor Qa/Qc Program.Caused by Undersized Anchorhead Brushings.Inryco, Inc Finalizing Analysis.Final Rept Will Be Sent 810731
ML19347F62318 May 1981Final Deficiency Rept Re Insulator Cracks on Epoxy Module Portion of Amphenol Sans Electrical Penetrations.Rework of pre-crimp Penetration Modules Has Been Completed.Rework of post-crimp Modules Will Be Completed by 810701
ML19351A2949 October 1989Part 21 Rept Re Potential of Ambient Compensated Molded Case Circuit Breakers to Deviate from Published Info. Instantaneous Trip Check Will Be Instituted on All Class 1E Thermal/Magnetic Ambient Breakers Prior to Shipment
ML19351E5842 December 1980Interim Deficiency Rept Initially Reported on 801106 Re Westinghouse Electro-Mechanical Div Mfg 3-inch Gate Valves, Model 3GM88 Failing to Close Under Preoperational Test Conditions.Westinghouse Developing Generic Solution
ML20003B66317 February 1981Final Deficiency Rept Re Inadequate Qa/Qc Procedures for Cable Installation,Initially Reported on 810116.Thirty-two Hatfield Electric Procedures Have Been Revised Re Installation of Class IE safety-related Cable
ML20003B67820 February 1981Interim Deficiency Rept Re Motor Terminal Block Voltage Ratings in Limitorque Valve Controls,Initially Reported on 810121.Blocks Will Be Replaced by Bolted lug-to-lug Taped Termination.Final Rept Will Be Sent by 810715
ML20003F18210 April 1981Final Rept Re Resolution of W-2 Switch Intermittent Contact Operation,Initially Reported on 800623.Adequacy of Basic Switch Design Confirmed.Switch Mfg Process Revised,Adding Steps to Reduce Internal Contamination During Assembly
ML20003H32229 April 1981Final Deficiency Rept Re Low Power Range Monitor Connectors (Type 901-200),initially Reported on 810324.Qualification of Connectors & Solder to Design Requirements Tested & Verified
ML20005G6835 January 1990Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced
ML20008E31619 September 1980Deficiency Rept Re MSIV Leakage Control Sys.Addl Liquid Bleedoff Drainline Installed Downstream of Heaters to Prevent Venting & Back Flow from Sump
ML20008F2216 March 1981Interim Deficiency Rept Re Insulator Cracks on Epoxy Module Portion of Amphenol Sams Electrical Penetrations, Initially Reported on 801020.Tests on pre- & post-crimped Modules in Progress.Next Rept by 810601
ML20008F9224 May 1981Suppl to Final Deficiency Rept Re Suppression Pool Water Vol Contained in 801224 Ltr.Formal Documentation of Updated Pool Temp Transient Analysis Will Be Contained in May 1981 Chapter 6 of Design Assessment Rept
ML20009D45315 July 1981Interim Deficiency Rept Re Motor Terminal Block Voltage Rating Limitorque Valve Controls.Installation of Bolted, Lug to Lug Taped Termination Will Be Completed 811102. Progress Rept Will Be Submitted by 810915
ML20009D52216 July 1981Deficiency Rept Re Design Deficiency in Hydrogen Recombiner Sys,Initially Reported 810616.Discharge Lines Will Be Rerouted & Connected to Penetrations M-104 & M-106.Design Documents Have Been Revised & Issued for Const
ML20009G27324 July 1981Interim Deficiency Rept Re Vol Control Tank Level Control Sys,Initially Reported 810618.Potential for Adverse Control & Protection Sys Interaction Will Be Reviewed & Revised Per Westinghouse Recommendation.Next Rept by 810924
ML20010A26831 July 1981Updated Interim Deficiency Rept Re Hfa Relay Bobbin Assembly Cracking,Initially Reported on 810325.Availability of Replacement Matls Primary Source of Delay in Initiating Work Required.Work Will Begin 810803
ML20010A61224 July 1981Deficiency Rept Re Motor Operated Valves at Facilities, Initially Reported 810618.Recommendations for Mods Made by Westinghouse
ML20010C73212 August 1981Part 21 Rept Re Incompatibility Between Crosby 6X10 & 8X10 Safety Relief Valve Solenoids.Vendor Will Inspect Assemblies Using Stricter Acceptance Criteria
ML20011F19422 February 1990Part 21 Rept Re Abb 27/59 Relay Catalog Series 211L.Solder Connections to Printed Wiring Runs on Bottom of Circuit Board Deteriorated Due to Thermal Stress.No Actual Failure Occurred & Relays to Be Changed at Next Outage
ML20011F59722 February 1990Part 21 Rept Re Solder Connections in Abb 27/59 Relays Deteriorated Due to Thermal Stress,Causing Bonding of Printed Wiring Pattern to Glass Epoxy Circuit Board.Interim Circuit Board W/Larger Pads & Higher Wattage Will Be Used
ML20012A90127 February 1990Suppls 900213 10CFR21 Rept Re Chilled Water Sys Operation. Evaluation of Crystal River Determined That Postulated High Energy Line Break in Intermediate Bldg May Be Subj to Steam Loads Higher than Normal Loads,Causing Rising Water Temp
ML20023D03623 October 1981Deficiency Rept Re Errors & Discrepancies Contained in HVAC Matl Certifications.Procurement Documentation Will Be Revalidated,Document & Records Mgt Program Will Be Developed & Qa/Qc Personnel Will Be Added.Also Reportable Per Part 21
ML20024A3479 June 1983Interim Deficiency Rept 83-07 Re Reactor Coolant Pump 1A Bearing Failure.Initially Reported on 830503.Defective Pump Internals Returned to Westinghouse to Determine Cause of Failure.Damaged Internals Replaced.Final Rept in 90 Days
ML20024B6351 July 1983Interim Deficiency Rept 82-10 Re Inadequate QA Provisions in Structural Steel Installation Insp Records.Initially Reported on 821119.Reinsp Continuing.Final Rept Will Be Issued by 840201