Interim Deficiency Rept Re Vol Control Tank Level Control Sys,Initially Reported 810618.Potential for Adverse Control & Protection Sys Interaction Will Be Reviewed & Revised Per Westinghouse Recommendation.Next Rept by 810924
ML20009G273
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/24/1981
From: Tramm T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, 2345N, NUDOCS 8108040069
Download: ML20009G273 (1)


Text

. _ _ .

i N Commonwealth Edison C ) One First National Plaza. Chicago Illinoi_s O^ Address Reply to- Post Office Box 767 Chicago, Illinois 60690 July 24, 1981 m e ft

\

(P"N Mr. James G. Keppler, Director Directorate of Inspection and

+,

Nbib h'll' Enforcement -

Region III /100$ M " '

U.S. Nuclear Regulatory Commission U'5. Qpou 799 Roosevelt Road y /8 Glen Ellyn, IL 60137

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Volume Control Tank Level Control System 50.55(e) Deficiency Report Number 81-04 NRC Dockets Nos. 50-454/455/456/457

Dear Mr. Keppler:

On June 18, 1981, Commonwealth Edison notified Mr. John Neisler of your office of an apparent reportable deficiency in the Byron /Braidwood Volume Control Tank (VCT) level control system.

This letter fulfills the thirty day reporting requirement of 50.55(e) regarding that item.

On May, 21, 1981, Westinghouse Electric Corporation notified the NRC and Commonwealth Edison of the potential for an adverse control and protection system interaction. A single random failure in the VCY level control system, in the absence of operator action, could lead to a loss of redundancy in the high head safety injection system. Details of the concern were reported to the NRC on May 21, 1981, in a letter from T. M. Anderson to V. Stello.

The significance of this deficiency is still being evaluated. Plant operating procedures will be reviewed and revised in accordance with Westinghouse's recommendation. The results of the continuing evaluation will be made available to the NRC by September 24, 1981.

, Please address questions regarding this matter to this office.

Very truly yours T. R. Tramm Nuclear Licensing Administrator cc: Director of Inspection and Enforcement lm