Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000344/LER-1979-013, Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl18 January 1980Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl
05000344/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl22 June 1982Forwards LER 82-008/03L-0.Detailed Event Analysis Encl
05000344/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Encl28 June 1982Forwards LER 82-009/03L-0.Detailed Event Analysis Encl
05000344/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy8 July 1982Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy
05000344/LER-1982-011, Forwards LER 82-011/03T-0.Detailed Event Analysis Encl26 July 1982Forwards LER 82-011/03T-0.Detailed Event Analysis Encl
05000344/LER-1985-013, Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER24 July 1986Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER
05000344/LER-1986-003, Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-3211 September 1986Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-32Safe Shutdown
05000344/LER-1987-014, Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 87110128 August 1987Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 871101
05000344/LER-1988-019, Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement21 April 1989Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement
05000344/LER-1988-025, Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C0117 February 1989Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C01
05000344/LER-1988-046, Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 89031528 February 1989Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 890315
05000344/LER-1988-049, Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-04914 April 1989Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-049
05000344/LER-1989-007, Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties28 September 1989Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties
05000344/LER-1989-012, Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 8908098 September 1989Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 890809
05000344/LER-1990-015, Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations15 October 1990Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations
05000344/LER-1992-010, Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-1025 January 1993Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-10
05000344/LER-1992-026, Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration Surveillance28 December 1992Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration SurveillanceSafe Shutdown
Fire Barrier
Exemption Request
Continuous fire watch
IR 05000344/19780182 October 1978Forwards IE Inspec Rept 50-344/78-18 on 780918-20 During Which No Items of Noncompliance Were Noted.Inspec Involved Activities Re Special Nuc Matl,Lic NPF-1.Rept Is Withheld Under 10CFR2.790(d)
IR 05000344/19780191 December 1978Forwards Rev Page 7 Correcting Typographical Error in Inspec Rept 50-344/78-19
IR 05000344/198201018 June 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-344/82-10.Util Will Conduct Fire Brigade Retraining on Recurring Basis Over Successive 2-yr Periods
IR 05000344/198301829 September 1983Discusses Insp Rept 50-344/83-18 on 830620-24 & 0726-28 & Forwards Notice of Violation & Notice of Proposed Imposition of Civil Penalty.Failure to Comply W/App R Requirements Due to Inadequate Control of Engineering Activities.W/O EnclCoatings
IR 05000344/198500830 May 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/85-08
IR 05000344/198502314 August 1985Forwards Insp Rept 50-344/85-23 on 850729-0802.No Violation Noted
IR 05000344/198502711 October 1985Forwards Safeguards Insp Rept 50-344/85-27 on 850826-0923. No Noncompliance Noted.Rept Withheld (Ref 10CFR73.21 & 2.790)
IR 05000344/198503616 December 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/85-36,per
IR 05000344/19850387 February 1986Discusses Insp Rept 50-344/85-38 on 851030-31 & Forwards Notice of Violation
IR 05000344/19860037 May 1986Discusses Safeguards Insp Rept 50-344/86-03 on 860409 & Forwards Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790 & 73.21)
IR 05000344/198600612 May 1986Ack Receipt of Informing NRC of Steps Taken to Correct Deviation Noted in Insp Rept 50-344/86-06
IR 05000344/19860119 April 1986Forwards Enforcement Conference Rept 50-344/86-11 on 860327 Re Safeguards & Security Measures.Rept Withheld (Ref 10CFR73.21 & 2.790)
IR 05000344/198602011 August 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/86-20
IR 05000344/198602810 September 1986Forwards Safeguards Insp Rept 50-344/86-28 on 860722-0821 & Notice of Violation.Encls Withheld (Ref 10CFR2.790(d))
IR 05000344/198603012 November 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/86-30
IR 05000344/19860416 February 1987Confirmatory Action Ltr Re 870123 Mgt Conference Outlining Actions to Be Taken to Correct Deficiencies Identified in 1986 Annual Emergency Preparedness Exercise,Ref in Insp Rept 50-344/86-41.Mgt Conference Insp Rept 50-344/87-03 Encl
IR 05000344/198604229 January 1987Forwards Safeguards Insp Rept 50-344/86-42 on 861117-1203 & Notice of Violation.Major Areas Inspected:Activities Re Physical Security,Including Exam of Procedures.Rept & Notice of Violation Withheld (Ref 10CFR2.790(d) & 73.21)
IR 05000344/198700218 February 1987Forwards Insp Rept 50-344/87-02 on 870202-06.No Violations Identified
IR 05000344/198700419 February 1987Forwards Insp Rept 50-344/87-04 on 870209-13.No Violations Noted
IR 05000344/19870172 July 1987Forwards Safeguards Insp Rept 50-344/87-17 on 870505-0604.No Violations Identified.W/O Encl
IR 05000344/198701817 March 1989Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/87-18
IR 05000344/198702511 June 1987Forwards Mgt Meeting Insp Rept 50-344/87-25 on 870605.Topics Discussed Included Util Root Cause Analyses of Several Engineering Problems & Related Operational Safety Concerns. Priority Should Be Placed on Concerns.W/O Insp Rept
IR 05000344/198703519 November 1987Forwards Safeguards Insp Rept 50-344/87-35 on 870923-1019.No Violations Noted.Insp Rept Withheld (Ref 10CFR2.790(d) & 10CFR73.21)
IR 05000344/198800125 March 1988Ack Receipt of Informing NRC of Actions Taken to Correct Violations Noted in Insp Rept 50-344/88-01
IR 05000344/198800410 May 1988Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/88-04
IR 05000344/198801326 July 1988Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-344/88-13Stroke time
Temporary Modification
Power-Operated Valves
IR 05000344/198802423 August 1988Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted Insp Rept 50-344/88-24
IR 05000344/19880279 September 1988Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/88-27
IR 05000344/198803031 January 1989Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/88-30High Radiation Area
IR 05000344/19880336 October 1988Forwards Safeguards Insp Rept 50-344/88-33 on 880816-0912 & Notice of Violation.Encls Withheld (Ref 10CFR2.790)
IR 05000344/198803420 October 1988Forwards Insp Rept 50-344/88-34 on 880822-26 & Notice of Violation.Final Resolution of 10CFR50,App R Issues & Aspects of Methodology Implemented Will Be Subj of Future Insp
IR 05000344/198803628 October 1988Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/88-36. Corrective Actions Will Be Verified During Future Insp
IR 05000344/19880394 April 1989Discusses Insp Repts 50-344/88-39 & 50-344/88-46 on 880808- 890119 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000.Violations Involved Failures to Adequately Assure Quality of Matls