Issue date | Title | Topic | |
---|---|---|---|
05000344/LER-1979-013, Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl | 18 January 1980 | Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl | |
05000344/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | 22 June 1982 | Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | |
05000344/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | 28 June 1982 | Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | |
05000344/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy | 8 July 1982 | Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy | |
05000344/LER-1982-011, Forwards LER 82-011/03T-0.Detailed Event Analysis Encl | 26 July 1982 | Forwards LER 82-011/03T-0.Detailed Event Analysis Encl | |
05000344/LER-1985-013, Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER | 24 July 1986 | Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER | |
05000344/LER-1986-003, Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-32 | 11 September 1986 | Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-32 | Safe Shutdown |
05000344/LER-1987-014, Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 871101 | 28 August 1987 | Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 871101 | |
05000344/LER-1988-019, Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement | 21 April 1989 | Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement | |
05000344/LER-1988-025, Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C01 | 17 February 1989 | Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C01 | |
05000344/LER-1988-046, Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 890315 | 28 February 1989 | Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 890315 | |
05000344/LER-1988-049, Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-049 | 14 April 1989 | Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-049 | |
05000344/LER-1989-007, Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties | 28 September 1989 | Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties | |
05000344/LER-1989-012, Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 890809 | 8 September 1989 | Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 890809 | |
05000344/LER-1990-015, Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations | 15 October 1990 | Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations | |
05000344/LER-1992-010, Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-10 | 25 January 1993 | Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-10 | |
05000344/LER-1992-026, Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration Surveillance | 28 December 1992 | Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration Surveillance | Safe Shutdown Fire Barrier Exemption Request Continuous fire watch |
IR 05000344/1978018 | 2 October 1978 | Forwards IE Inspec Rept 50-344/78-18 on 780918-20 During Which No Items of Noncompliance Were Noted.Inspec Involved Activities Re Special Nuc Matl,Lic NPF-1.Rept Is Withheld Under 10CFR2.790(d) | |
IR 05000344/1978019 | 1 December 1978 | Forwards Rev Page 7 Correcting Typographical Error in Inspec Rept 50-344/78-19 | |
IR 05000344/1982010 | 18 June 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-344/82-10.Util Will Conduct Fire Brigade Retraining on Recurring Basis Over Successive 2-yr Periods | |
IR 05000344/1983018 | 29 September 1983 | Discusses Insp Rept 50-344/83-18 on 830620-24 & 0726-28 & Forwards Notice of Violation & Notice of Proposed Imposition of Civil Penalty.Failure to Comply W/App R Requirements Due to Inadequate Control of Engineering Activities.W/O Encl | Coatings |
IR 05000344/1985008 | 30 May 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/85-08 | |
IR 05000344/1985023 | 14 August 1985 | Forwards Insp Rept 50-344/85-23 on 850729-0802.No Violation Noted | |
IR 05000344/1985027 | 11 October 1985 | Forwards Safeguards Insp Rept 50-344/85-27 on 850826-0923. No Noncompliance Noted.Rept Withheld (Ref 10CFR73.21 & 2.790) | |
IR 05000344/1985036 | 16 December 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/85-36,per | |
IR 05000344/1985038 | 7 February 1986 | Discusses Insp Rept 50-344/85-38 on 851030-31 & Forwards Notice of Violation | |
IR 05000344/1986003 | 7 May 1986 | Discusses Safeguards Insp Rept 50-344/86-03 on 860409 & Forwards Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790 & 73.21) | |
IR 05000344/1986006 | 12 May 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Deviation Noted in Insp Rept 50-344/86-06 | |
IR 05000344/1986011 | 9 April 1986 | Forwards Enforcement Conference Rept 50-344/86-11 on 860327 Re Safeguards & Security Measures.Rept Withheld (Ref 10CFR73.21 & 2.790) | |
IR 05000344/1986020 | 11 August 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/86-20 | |
IR 05000344/1986028 | 10 September 1986 | Forwards Safeguards Insp Rept 50-344/86-28 on 860722-0821 & Notice of Violation.Encls Withheld (Ref 10CFR2.790(d)) | |
IR 05000344/1986030 | 12 November 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/86-30 | |
IR 05000344/1986041 | 6 February 1987 | Confirmatory Action Ltr Re 870123 Mgt Conference Outlining Actions to Be Taken to Correct Deficiencies Identified in 1986 Annual Emergency Preparedness Exercise,Ref in Insp Rept 50-344/86-41.Mgt Conference Insp Rept 50-344/87-03 Encl | |
IR 05000344/1986042 | 29 January 1987 | Forwards Safeguards Insp Rept 50-344/86-42 on 861117-1203 & Notice of Violation.Major Areas Inspected:Activities Re Physical Security,Including Exam of Procedures.Rept & Notice of Violation Withheld (Ref 10CFR2.790(d) & 73.21) | |
IR 05000344/1987002 | 18 February 1987 | Forwards Insp Rept 50-344/87-02 on 870202-06.No Violations Identified | |
IR 05000344/1987004 | 19 February 1987 | Forwards Insp Rept 50-344/87-04 on 870209-13.No Violations Noted | |
IR 05000344/1987017 | 2 July 1987 | Forwards Safeguards Insp Rept 50-344/87-17 on 870505-0604.No Violations Identified.W/O Encl | |
IR 05000344/1987018 | 17 March 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/87-18 | |
IR 05000344/1987025 | 11 June 1987 | Forwards Mgt Meeting Insp Rept 50-344/87-25 on 870605.Topics Discussed Included Util Root Cause Analyses of Several Engineering Problems & Related Operational Safety Concerns. Priority Should Be Placed on Concerns.W/O Insp Rept | |
IR 05000344/1987035 | 19 November 1987 | Forwards Safeguards Insp Rept 50-344/87-35 on 870923-1019.No Violations Noted.Insp Rept Withheld (Ref 10CFR2.790(d) & 10CFR73.21) | |
IR 05000344/1988001 | 25 March 1988 | Ack Receipt of Informing NRC of Actions Taken to Correct Violations Noted in Insp Rept 50-344/88-01 | |
IR 05000344/1988004 | 10 May 1988 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/88-04 | |
IR 05000344/1988013 | 26 July 1988 | Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-344/88-13 | Stroke time Temporary Modification Power-Operated Valves |
IR 05000344/1988024 | 23 August 1988 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted Insp Rept 50-344/88-24 | |
IR 05000344/1988027 | 9 September 1988 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/88-27 | |
IR 05000344/1988030 | 31 January 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/88-30 | High Radiation Area |
IR 05000344/1988033 | 6 October 1988 | Forwards Safeguards Insp Rept 50-344/88-33 on 880816-0912 & Notice of Violation.Encls Withheld (Ref 10CFR2.790) | |
IR 05000344/1988034 | 20 October 1988 | Forwards Insp Rept 50-344/88-34 on 880822-26 & Notice of Violation.Final Resolution of 10CFR50,App R Issues & Aspects of Methodology Implemented Will Be Subj of Future Insp | |
IR 05000344/1988036 | 28 October 1988 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/88-36. Corrective Actions Will Be Verified During Future Insp | |
IR 05000344/1988039 | 4 April 1989 | Discusses Insp Repts 50-344/88-39 & 50-344/88-46 on 880808- 890119 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000.Violations Involved Failures to Adequately Assure Quality of Matls |