IR 05000344/1982010
| ML20054G861 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 06/18/1982 |
| From: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Withers B PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20054G862 | List: |
| References | |
| NUDOCS 8206220362 | |
| Download: ML20054G861 (1) | |
Text
-
._
..,
-
.
%
,,,.
w
-
,
s
,
,
JUN 181982 Docket No. 50-344 Portland General Electric Company 121 S.
W.
Salmon Street Portland, Oregon 97204 Attention:
Mr. Bart D. Withers Vice President, Nuclear Gentlemen:
~'O Thank you for your letter dated June 8, 1982, informing us of the steps you have taken to correct the item which we brought to your attention in our letter dated May 21, 1982.
Your corrective actions will be verified during a future inspection.
Your letter also included a clarification of your commitment regarding fire brigade retraining.
This commitment stated that the initial classroom training for fire brigade members will be repeated over a two-year period.
As confirmed by Mr.
C.
P. Yurdt in a telephone conversation with Mr. P. H. Johnson on June 15, 1982, it is our understanding that this training will be on a recurring basis, conducted over successive two-year periods.
Your cooperation with us is appreciated.
Sincerely,
/s/
D.
M.
Sternberg, Chief Reactor Operations Projects Branch bec:
Document Control Desk (RIDS)
Distributed by RV w/cy ltr dtd 6/8/82:
State (Godard), Resident (Malmros)
8206220362 820618
[_C,() f PDR ADOCK 05000344 G
PDR RV RVD
'">,,I
..,
g
""*Y
.b.9k'. SOnd CD.
ZWetzig, Sternberg
""N 6!/.]/82 6/[]/82 6/\\}/82 OFFICIAL REUORD COPY wc muu m oc,.o, %c u e24 e
" * - ~ *