Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000000/LER-1986-018, Forwards LER 86-018-0014 March 1986Forwards LER 86-018-00
05000245/LER-1978-021, Forwards LER 78-021/03L-012 October 1978Forwards LER 78-021/03L-0
05000245/LER-1979-036, Forwards LER 79-036/03L-018 January 1980Forwards LER 79-036/03L-0Reactor Vessel Water Level
05000245/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl7 June 1982Forwards LER 82-011/03L-0.Detailed Event Analysis Encl
05000245/LER-1982-012, Forwards LER 82-012/01T-0.Detailed Event Analysis Encl16 July 1982Forwards LER 82-012/01T-0.Detailed Event Analysis Encl
05000245/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Encl15 July 1982Forwards LER 82-013/03L-0.Detailed Event Analysis Encl
05000245/LER-1982-014, Forwards LER 82-014/03L-0.Detailed Event Analysis Encl14 July 1982Forwards LER 82-014/03L-0.Detailed Event Analysis Encl
05000245/LER-1993-006, Forwards Updated LER 93-006-01 Which Was Previously Submitted W/O Rev Bars10 August 1993Forwards Updated LER 93-006-01 Which Was Previously Submitted W/O Rev Bars
05000245/LER-1993-011, Responds to NRC 981002 Request to Counsel That NNECO Waive Any Assertion of Statue of Limitations for 60-90 Days with Respect to NRC Ability to Initiate Civil Penalty Action Based on Apparent Violation of 10CFR50.59 Re LER 93-015 October 1998Responds to NRC 981002 Request to Counsel That NNECO Waive Any Assertion of Statue of Limitations for 60-90 Days with Respect to NRC Ability to Initiate Civil Penalty Action Based on Apparent Violation of 10CFR50.59 Re LER 93-011-00
05000245/LER-1994-020, Forwards LER 94-020-01 Which Documents Event That Occurred on 940527,per 10CFR50.73(a)(2)(ii).Commitments,listed10 February 1997Forwards LER 94-020-01 Which Documents Event That Occurred on 940527,per 10CFR50.73(a)(2)(ii).Commitments,listed
05000245/LER-1995-008, Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted19 December 1996Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted
05000245/LER-1995-033, Forwards LER 95-033-02,documenting Event That Occurred at Unit 1 on 950623.Commitments Made within Ltr,Listed25 September 1997Forwards LER 95-033-02,documenting Event That Occurred at Unit 1 on 950623.Commitments Made within Ltr,Listed
05000245/LER-1996-003, Forwards LER 96-003-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960111,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii).Commitments Made in Ltr,Submitted10 January 1997Forwards LER 96-003-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960111,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii).Commitments Made in Ltr,Submitted
05000245/LER-1996-009, Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr19 May 1997Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr
05000245/LER-1996-020, Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated17 March 1997Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated
05000245/LER-1996-023, Forwards LER 96-023-01,documenting Condition Discovered at Millstone,Unit 1 on 960306.Attachment 1 Contains Commitments Made within Ltr12 May 1998Forwards LER 96-023-01,documenting Condition Discovered at Millstone,Unit 1 on 960306.Attachment 1 Contains Commitments Made within Ltr
05000245/LER-1996-026, Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed16 December 1996Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed
05000245/LER-1996-031, Forwards LER 96-031-01.Util Commits That All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating Prior to Startup for Operating Cycle 1616 December 1996Forwards LER 96-031-01.Util Commits That All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating Prior to Startup for Operating Cycle 16
05000245/LER-1996-035, Forwards LER 96-035-02,documenting Event That Occurred on 960506.Rept Provides Results of Metallurgical Sample from Gamma Plug Per Commitment B15744-3 to Determine Cause of Cracks Found in Gamma Access Port Plug13 August 1997Forwards LER 96-035-02,documenting Event That Occurred on 960506.Rept Provides Results of Metallurgical Sample from Gamma Plug Per Commitment B15744-3 to Determine Cause of Cracks Found in Gamma Access Port Plug
05000245/LER-1996-037, Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii)7 March 1997Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii)
05000245/LER-1996-039, Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided2 September 1997Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided
05000245/LER-1996-046, Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed3 March 1997Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed
05000245/LER-1996-049, Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments Listed10 January 1997Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments ListedEarthquake
05000245/LER-1996-051, Forwards Suppl LER 96-051-01.Commitments Listed,Including Implementation of Mods to Restore Each Identified Piping Sys to Design Basis13 December 1996Forwards Suppl LER 96-051-01.Commitments Listed,Including Implementation of Mods to Restore Each Identified Piping Sys to Design BasisSafe Shutdown
05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement1 November 1996Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirements
05000245/LER-1996-054, Submits Change to Commitment Made in LER 96-054-01,dtd 961216.Listed Commitment Is Same Except for Change in Completion Date30 June 1997Submits Change to Commitment Made in LER 96-054-01,dtd 961216.Listed Commitment Is Same Except for Change in Completion Date
05000245/LER-1996-055, Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted22 November 1996Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted
05000245/LER-1996-056, Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted10 January 1997Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted
05000245/LER-1996-057, Submits Commitments Made Re LER 96-057.Breakers Which Are Racked Down Will Be Secured within Cubicle to Prevent Movement Using Existing Hardware Associated W/Elevator Mechanism by 96123013 December 1996Submits Commitments Made Re LER 96-057.Breakers Which Are Racked Down Will Be Secured within Cubicle to Prevent Movement Using Existing Hardware Associated W/Elevator Mechanism by 961230
05000245/LER-1996-059, Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements16 December 1996Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements
05000245/LER-1996-060, Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed20 December 1996Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed
05000245/LER-1996-061, Submits List of Commitments to LER 96-061-00.Util Will Document Containment Isolation Design Requirements for RWCU Sys Auxiliary Pump Operation Mode23 December 1996Submits List of Commitments to LER 96-061-00.Util Will Document Containment Isolation Design Requirements for RWCU Sys Auxiliary Pump Operation Mode
05000245/LER-1996-062, Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident2 January 1997Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident
05000245/LER-1996-063, Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted9 April 1997Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted
05000245/LER-1996-064, Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed20 January 1997Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed
05000245/LER-1996-066, Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments8 August 1997Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments
05000245/LER-1997-001, Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed10 February 1997Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed
05000245/LER-1997-002, Forwards LER 97-002-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970114,per 10CFR50.73(a)(2)(iv). Commitments Made,Listed13 February 1997Forwards LER 97-002-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970114,per 10CFR50.73(a)(2)(iv). Commitments Made,Listed
05000245/LER-1997-003, Forwards LER 97-003-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970306,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed7 April 1997Forwards LER 97-003-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970306,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed
05000245/LER-1997-004, Forwards LER 97-004-01,documenting Closure of Commitment B16213-1.Includes Commitments Made within This Ltr30 April 1997Forwards LER 97-004-01,documenting Closure of Commitment B16213-1.Includes Commitments Made within This Ltr
05000245/LER-1997-005, Forwards LER 97-005-01,documenting Closure of Commitment B16236-2 & B16236-3,including Commitments Made within Ltr30 April 1997Forwards LER 97-005-01,documenting Closure of Commitment B16236-2 & B16236-3,including Commitments Made within Ltr
05000245/LER-1997-006, Forwards LER 97-006-00,documenting Condition That Was Discovered at Millstone Nuclear Station,Unit 1 on 970131, Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed3 March 1997Forwards LER 97-006-00,documenting Condition That Was Discovered at Millstone Nuclear Station,Unit 1 on 970131, Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed
05000245/LER-1997-007, Forwards LER 97-007-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970131,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii). Util Commitments Made within Ltr,Listed3 March 1997Forwards LER 97-007-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970131,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii). Util Commitments Made within Ltr,Listed
05000245/LER-1997-008, Forwards LER 97-008-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970203,per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed3 March 1997Forwards LER 97-008-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970203,per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed
05000245/LER-1997-009, Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed14 March 1997Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed
05000245/LER-1997-010, Forwards LER 97-010-00,documenting Event Occurred at Unit 1 on 970214.Commitments Made within Ltr Submitted as Listed17 March 1997Forwards LER 97-010-00,documenting Event Occurred at Unit 1 on 970214.Commitments Made within Ltr Submitted as Listed
05000245/LER-1997-011, Forwards LER 97-011-00,documenting Event Occurred at Unit 1 on 970214.Commitment Made within Ltr Submitted as Listed17 March 1997Forwards LER 97-011-00,documenting Event Occurred at Unit 1 on 970214.Commitment Made within Ltr Submitted as Listed
05000245/LER-1997-012, Provides List of Commitments Made Re LER 97-012-0017 March 1997Provides List of Commitments Made Re LER 97-012-00
05000245/LER-1997-013, Forwards LER 97-013-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Commitments Made within Ltr,Listed19 March 1997Forwards LER 97-013-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Commitments Made within Ltr,Listed
05000245/LER-1997-014, Forwards Suppl LER 97-014-02,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Rept Includes Addl Deficiencies in IST Program That Have Been Identified as Reportable29 August 1997Forwards Suppl LER 97-014-02,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Rept Includes Addl Deficiencies in IST Program That Have Been Identified as Reportable