05000354/LER-1986-074, Resubmits LER 86-074-00.LER Found Out of Original Envelope & Loose in Mail | 12 November 1986 | Resubmits LER 86-074-00.LER Found Out of Original Envelope & Loose in Mail | |
05000354/LER-1989-009, Forwards Corrected Page 1 of LER 89-009-00.Event & Rept Dates Incorrectly Coded | 17 May 1989 | Forwards Corrected Page 1 of LER 89-009-00.Event & Rept Dates Incorrectly Coded | |
05000354/LER-1994-002, Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC | 14 August 1995 | Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC | |
05000354/LER-1995-003, Informs of Extension of Expected Submission Date for LER 95-003-01 Entitled Failure to Perform Surveillance in Operational Condition Specified in TS from 951130 to 960105 | 30 November 1995 | Informs of Extension of Expected Submission Date for LER 95-003-01 Entitled Failure to Perform Surveillance in Operational Condition Specified in TS from 951130 to 960105 | |
05000354/LER-1995-016, Forwards LER 95-016 Re Bypass Event Rendered Shutdown Cooling Mode of RHR Inoperable | 9 August 1995 | Forwards LER 95-016 Re Bypass Event Rendered Shutdown Cooling Mode of RHR Inoperable | |
05000354/LER-1995-017, Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared Inoperable | 11 August 1995 | Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared Inoperable | Missed surveillance |
05000354/LER-1995-033, Forwards LER 95-033-12 Which Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program | 20 November 1996 | Forwards LER 95-033-12 Which Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program | |
05000354/LER-1995-037, Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00 | 11 March 1996 | Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00 | |
05000354/LER-1995-038, Forwards LER-95-038-02 Re Failure to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR Shutdown Cooling Line.Suppl Updates Corrective Actions | 14 March 1996 | Forwards LER-95-038-02 Re Failure to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR Shutdown Cooling Line.Suppl Updates Corrective Actions | |
05000354/LER-1996-014, Forwards LER 96-014-00 Re non-conservative Safety Limit Min Critical Power Ratio Calculation Methodology Error Discovery.Commitments Listed as Submitted | 14 May 1996 | Forwards LER 96-014-00 Re non-conservative Safety Limit Min Critical Power Ratio Calculation Methodology Error Discovery.Commitments Listed as Submitted | |
05000354/LER-1996-015, Forwards LER 96-015-00 Re Potential to Operate in Unanalyzed Condition Due to Design Deficiency in Overboard Discharge Line.Commitments Listed as Submitted | 10 May 1996 | Forwards LER 96-015-00 Re Potential to Operate in Unanalyzed Condition Due to Design Deficiency in Overboard Discharge Line.Commitments Listed as Submitted | Unanalyzed Condition |
05000354/LER-1996-022, Forwards LER 96-022-02,documenting Event That Occurred at Hope Creek Generating Station,Unit 1.Util Commitments Made within Ltr,Listed | 31 January 1997 | Forwards LER 96-022-02,documenting Event That Occurred at Hope Creek Generating Station,Unit 1.Util Commitments Made within Ltr,Listed | |
05000354/LER-1996-025, Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up | 6 December 1996 | Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up | |
05000354/LER-1996-028, Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed | 20 January 1997 | Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed | |
05000354/LER-1996-030, Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00 | 29 January 1997 | Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00 | |
05000354/LER-1997-002, Forwards List of Commitments Made for LER 97-002-00 Re Inconsistency Between Filtration,Recirculation & Ventilation Sys TSs & Ability to Withstand Single Failures | 14 February 1997 | Forwards List of Commitments Made for LER 97-002-00 Re Inconsistency Between Filtration,Recirculation & Ventilation Sys TSs & Ability to Withstand Single Failures | |
05000354/LER-1997-004, Forwards LER 97-004-00, B Div Primary Containment Isolation Due to Personnel Error During Troubleshooting, Per 10CFR50.73(a)(2)(iv).Util Commitments Listed | 10 March 1997 | Forwards LER 97-004-00, B Div Primary Containment Isolation Due to Personnel Error During Troubleshooting, Per 10CFR50.73(a)(2)(iv).Util Commitments Listed | |
05000354/LER-1997-005, Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached | 25 April 1997 | Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached | |
05000354/LER-1997-007, Provides List of Commitments Re LER 97-007 Concerning Struthers-Dunn 219NE Series Relay Failures Due to Thermal Degradation of Magnetic Vinyl Plastic Bearing Pad Matl Per 10CFR50.73(a)(2)(v) & 10CFR21.LER 97-007-00,encl | 7 May 1997 | Provides List of Commitments Re LER 97-007 Concerning Struthers-Dunn 219NE Series Relay Failures Due to Thermal Degradation of Magnetic Vinyl Plastic Bearing Pad Matl Per 10CFR50.73(a)(2)(v) & 10CFR21.LER 97-007-00,encl | |
05000354/LER-1997-008, Forwards LER 97-008-00 Entitled, ESF Actuation: C Svc Water Pump Auto-Start. Commitments,Encl | 19 June 1997 | Forwards LER 97-008-00 Entitled, ESF Actuation: C Svc Water Pump Auto-Start. Commitments,Encl | |
05000354/LER-1997-013, Forwards LER 97-013-01 Re Unplanned High Pressure Coolant Injection Sys Inoperability.Attachment a Listed Item Representing Commitment | 1 October 1997 | Forwards LER 97-013-01 Re Unplanned High Pressure Coolant Injection Sys Inoperability.Attachment a Listed Item Representing Commitment | |
05000354/LER-1997-015, Forwards LER 97-015-00 Re Failure of Radioactive Effluent Samples to Analyze within Required Surveillance Interval. Commitments Made by Util,Encl | 31 July 1997 | Forwards LER 97-015-00 Re Failure of Radioactive Effluent Samples to Analyze within Required Surveillance Interval. Commitments Made by Util,Encl | |
05000354/LER-1997-017, Forwards LER 97-017-00 Re Missed Emergency Lighting Surveillance,Per License Conditions 2.C(7) & 2.F | 28 August 1997 | Forwards LER 97-017-00 Re Missed Emergency Lighting Surveillance,Per License Conditions 2.C(7) & 2.F | Emergency Lighting |
05000354/LER-1997-018, Forwards LER 97-018-00,discussing Esfa Which Resulted from RPS MG Set Breaker Trip.List of Commitments,Encl | 27 August 1997 | Forwards LER 97-018-00,discussing Esfa Which Resulted from RPS MG Set Breaker Trip.List of Commitments,Encl | |
05000354/LER-1997-019, Forwards LER 97-019-00, Engineered Safety Feature Actuation Closure of B Safety Auxiliaries Cooling Sys to Turbine Auxiliaries Cooling Sys Isolation Valves. LER Is Being Submitted to Discuss 970807 & 970904 Events | 17 September 1997 | Forwards LER 97-019-00, Engineered Safety Feature Actuation Closure of B Safety Auxiliaries Cooling Sys to Turbine Auxiliaries Cooling Sys Isolation Valves. LER Is Being Submitted to Discuss 970807 & 970904 Events | |
05000354/LER-1997-020, Forwards LER 97-020-00 Re Past Inoperability of Safety Related Chiller Due to Operation W/Low Safety Auxiliary Cooling Sys Temp.Commitments Made by Util,Attached | 27 September 1997 | Forwards LER 97-020-00 Re Past Inoperability of Safety Related Chiller Due to Operation W/Low Safety Auxiliary Cooling Sys Temp.Commitments Made by Util,Attached | Ultimate heat sink |
05000354/LER-1997-021, Forwards LER 97-021-00 Entitled, Standby Liquid Control Sys Tank Concentration Below TS Limits. Commitments Made within Rept,Encl | 22 September 1997 | Forwards LER 97-021-00 Entitled, Standby Liquid Control Sys Tank Concentration Below TS Limits. Commitments Made within Rept,Encl | |
05000354/LER-1997-022, Forwards LER 97-022-00 Re Unplanned Manual Scram Following Relay Malfunction in a Phase Main Generator step-up Transformer.Commitments Made by Util,Encl | 6 October 1997 | Forwards LER 97-022-00 Re Unplanned Manual Scram Following Relay Malfunction in a Phase Main Generator step-up Transformer.Commitments Made by Util,Encl | |
05000354/LER-1997-023, Forwards LER 97-023-01 Re Core Spray Nozzle Weld through- Wall Leak.Commitments Made by Util,Encl | 28 November 1997 | Forwards LER 97-023-01 Re Core Spray Nozzle Weld through- Wall Leak.Commitments Made by Util,Encl | |
05000354/LER-1997-024, Forwards LER 97-024-00 Re as Found Values for Safety Relief Valve Lift Setpoints Exceed Tech Spec Allowable Limits. Attachment a Represent Commitments Util Made to NRC Relative to LER | 20 October 1997 | Forwards LER 97-024-00 Re as Found Values for Safety Relief Valve Lift Setpoints Exceed Tech Spec Allowable Limits. Attachment a Represent Commitments Util Made to NRC Relative to LER | |
05000354/LER-1997-025, Forwards LER 97-025-00 Re Design Deficiency Potential for Unmonitored Release Path Through Station Svc Water Sys. Commitment Util Made to NRC Relative to Ler,Encl | 27 October 1997 | Forwards LER 97-025-00 Re Design Deficiency Potential for Unmonitored Release Path Through Station Svc Water Sys. Commitment Util Made to NRC Relative to Ler,Encl | |
05000354/LER-1997-026, Forwards LER 97-026-00,re Inoperable E Filtration, Recirculation,Ventilation Sys Recirculation Unit Due to Tripped High High Temperature Switch.Commitment,Listed | 19 November 1997 | Forwards LER 97-026-00,re Inoperable E Filtration, Recirculation,Ventilation Sys Recirculation Unit Due to Tripped High High Temperature Switch.Commitment,Listed | |
05000354/LER-1997-031, Forwards LER 97-031-00 Re Reactor Core Isolation Cooling Sys Isolation.Commitments Made by Util Also Encl | 24 December 1997 | Forwards LER 97-031-00 Re Reactor Core Isolation Cooling Sys Isolation.Commitments Made by Util Also Encl | |
05000354/LER-1997-032, Forwards LER 97-032-00 Re Inoperability of HPCI & Rcic. Commitments Made by Util,Encl | 2 January 1998 | Forwards LER 97-032-00 Re Inoperability of HPCI & Rcic. Commitments Made by Util,Encl | |
05000354/LER-1997-034, Forwards LER 97-034-01, Condition Prohibited by Ts:Missed EDG Surveillance. Util Commitments to NRC Re Subj LER Encl | 6 April 1998 | Forwards LER 97-034-01, Condition Prohibited by Ts:Missed EDG Surveillance. Util Commitments to NRC Re Subj LER Encl | |
05000354/LER-1998-001, Forwards LER 98-001-00,re Missed HPCI Surveillance Resulting in Unavailability of HPCI | 16 March 1998 | Forwards LER 98-001-00,re Missed HPCI Surveillance Resulting in Unavailability of HPCI | |
05000354/LER-1998-002, Forwards LER 98-002-00, TS Prohibited Condition - Indequate Filtration,Recirculation & Ventilation Sys Surveillance Test, Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Encl | 20 April 1998 | Forwards LER 98-002-00, TS Prohibited Condition - Indequate Filtration,Recirculation & Ventilation Sys Surveillance Test, Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Encl | |
05000354/LER-1998-003, Forwards LER 98-003-00 Re Concurrent Inoperability of a & B Cr.Commitments Made by Pse&G,Encl | 7 May 1998 | Forwards LER 98-003-00 Re Concurrent Inoperability of a & B Cr.Commitments Made by Pse&G,Encl | |
05000354/LER-1998-004, Forwards LER 98-004-00 Re EDG Inoperability in Excess of Allowed Outage Time,Due to High Particulate Concentration in Diesel Fuel Oil Storage Tanks | 22 June 1998 | Forwards LER 98-004-00 Re EDG Inoperability in Excess of Allowed Outage Time,Due to High Particulate Concentration in Diesel Fuel Oil Storage Tanks | |
05000354/LER-1998-006, Forwards LER 98-006-00,entitled Inadequate Performance of Primary Containment Integrity Verification, IAW 10CFR50.73(a)(2)(i)(B).Commitments Made by Util,Encl | 13 October 1998 | Forwards LER 98-006-00,entitled Inadequate Performance of Primary Containment Integrity Verification, IAW 10CFR50.73(a)(2)(i)(B).Commitments Made by Util,Encl | |
05000354/LER-1998-008, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a | 4 May 1999 | Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a | |
05000354/LER-1999-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made | 26 March 1999 | Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made | |
05000354/LER-1999-004, Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl | 8 April 1999 | Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl | |
05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER | 15 June 1999 | Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER | |
05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl | 14 July 1999 | Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl | |
05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl | 20 September 1999 | Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl | |
IA-86-278, Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR | 27 June 1986 | Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR | Nondestructive Examination |
IA-86-404, Responds to FOIA Request.Document Listed in App Available in Pdr.W/O Encl | 3 June 1986 | Responds to FOIA Request.Document Listed in App Available in Pdr.W/O Encl | |
IA-96-525, Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR | 6 February 1997 | Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR | |
IA-98-179, Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in PDR | 6 May 1998 | Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in PDR | |