Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000354/LER-1986-074, Resubmits LER 86-074-00.LER Found Out of Original Envelope & Loose in Mail12 November 1986Resubmits LER 86-074-00.LER Found Out of Original Envelope & Loose in Mail
05000354/LER-1989-009, Forwards Corrected Page 1 of LER 89-009-00.Event & Rept Dates Incorrectly Coded17 May 1989Forwards Corrected Page 1 of LER 89-009-00.Event & Rept Dates Incorrectly Coded
05000354/LER-1994-002, Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC14 August 1995Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC
05000354/LER-1995-003, Informs of Extension of Expected Submission Date for LER 95-003-01 Entitled Failure to Perform Surveillance in Operational Condition Specified in TS from 951130 to 96010530 November 1995Informs of Extension of Expected Submission Date for LER 95-003-01 Entitled Failure to Perform Surveillance in Operational Condition Specified in TS from 951130 to 960105
05000354/LER-1995-016, Forwards LER 95-016 Re Bypass Event Rendered Shutdown Cooling Mode of RHR Inoperable9 August 1995Forwards LER 95-016 Re Bypass Event Rendered Shutdown Cooling Mode of RHR Inoperable
05000354/LER-1995-017, Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared Inoperable11 August 1995Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared InoperableMissed surveillance
05000354/LER-1995-033, Forwards LER 95-033-12 Which Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program20 November 1996Forwards LER 95-033-12 Which Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program
05000354/LER-1995-037, Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-0011 March 1996Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00
05000354/LER-1995-038, Forwards LER-95-038-02 Re Failure to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR Shutdown Cooling Line.Suppl Updates Corrective Actions14 March 1996Forwards LER-95-038-02 Re Failure to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR Shutdown Cooling Line.Suppl Updates Corrective Actions
05000354/LER-1996-014, Forwards LER 96-014-00 Re non-conservative Safety Limit Min Critical Power Ratio Calculation Methodology Error Discovery.Commitments Listed as Submitted14 May 1996Forwards LER 96-014-00 Re non-conservative Safety Limit Min Critical Power Ratio Calculation Methodology Error Discovery.Commitments Listed as Submitted
05000354/LER-1996-015, Forwards LER 96-015-00 Re Potential to Operate in Unanalyzed Condition Due to Design Deficiency in Overboard Discharge Line.Commitments Listed as Submitted10 May 1996Forwards LER 96-015-00 Re Potential to Operate in Unanalyzed Condition Due to Design Deficiency in Overboard Discharge Line.Commitments Listed as SubmittedUnanalyzed Condition
05000354/LER-1996-022, Forwards LER 96-022-02,documenting Event That Occurred at Hope Creek Generating Station,Unit 1.Util Commitments Made within Ltr,Listed31 January 1997Forwards LER 96-022-02,documenting Event That Occurred at Hope Creek Generating Station,Unit 1.Util Commitments Made within Ltr,Listed
05000354/LER-1996-025, Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up6 December 1996Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up
05000354/LER-1996-028, Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed20 January 1997Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed
05000354/LER-1996-030, Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-0029 January 1997Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00
05000354/LER-1997-002, Forwards List of Commitments Made for LER 97-002-00 Re Inconsistency Between Filtration,Recirculation & Ventilation Sys TSs & Ability to Withstand Single Failures14 February 1997Forwards List of Commitments Made for LER 97-002-00 Re Inconsistency Between Filtration,Recirculation & Ventilation Sys TSs & Ability to Withstand Single Failures
05000354/LER-1997-004, Forwards LER 97-004-00, B Div Primary Containment Isolation Due to Personnel Error During Troubleshooting, Per 10CFR50.73(a)(2)(iv).Util Commitments Listed10 March 1997Forwards LER 97-004-00, B Div Primary Containment Isolation Due to Personnel Error During Troubleshooting, Per 10CFR50.73(a)(2)(iv).Util Commitments Listed
05000354/LER-1997-005, Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached25 April 1997Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached
05000354/LER-1997-007, Provides List of Commitments Re LER 97-007 Concerning Struthers-Dunn 219NE Series Relay Failures Due to Thermal Degradation of Magnetic Vinyl Plastic Bearing Pad Matl Per 10CFR50.73(a)(2)(v) & 10CFR21.LER 97-007-00,encl7 May 1997Provides List of Commitments Re LER 97-007 Concerning Struthers-Dunn 219NE Series Relay Failures Due to Thermal Degradation of Magnetic Vinyl Plastic Bearing Pad Matl Per 10CFR50.73(a)(2)(v) & 10CFR21.LER 97-007-00,encl
05000354/LER-1997-008, Forwards LER 97-008-00 Entitled, ESF Actuation: C Svc Water Pump Auto-Start. Commitments,Encl19 June 1997Forwards LER 97-008-00 Entitled, ESF Actuation: C Svc Water Pump Auto-Start. Commitments,Encl
05000354/LER-1997-013, Forwards LER 97-013-01 Re Unplanned High Pressure Coolant Injection Sys Inoperability.Attachment a Listed Item Representing Commitment1 October 1997Forwards LER 97-013-01 Re Unplanned High Pressure Coolant Injection Sys Inoperability.Attachment a Listed Item Representing Commitment
05000354/LER-1997-015, Forwards LER 97-015-00 Re Failure of Radioactive Effluent Samples to Analyze within Required Surveillance Interval. Commitments Made by Util,Encl31 July 1997Forwards LER 97-015-00 Re Failure of Radioactive Effluent Samples to Analyze within Required Surveillance Interval. Commitments Made by Util,Encl
05000354/LER-1997-017, Forwards LER 97-017-00 Re Missed Emergency Lighting Surveillance,Per License Conditions 2.C(7) & 2.F28 August 1997Forwards LER 97-017-00 Re Missed Emergency Lighting Surveillance,Per License Conditions 2.C(7) & 2.FEmergency Lighting
05000354/LER-1997-018, Forwards LER 97-018-00,discussing Esfa Which Resulted from RPS MG Set Breaker Trip.List of Commitments,Encl27 August 1997Forwards LER 97-018-00,discussing Esfa Which Resulted from RPS MG Set Breaker Trip.List of Commitments,Encl
05000354/LER-1997-019, Forwards LER 97-019-00, Engineered Safety Feature Actuation Closure of B Safety Auxiliaries Cooling Sys to Turbine Auxiliaries Cooling Sys Isolation Valves. LER Is Being Submitted to Discuss 970807 & 970904 Events17 September 1997Forwards LER 97-019-00, Engineered Safety Feature Actuation Closure of B Safety Auxiliaries Cooling Sys to Turbine Auxiliaries Cooling Sys Isolation Valves. LER Is Being Submitted to Discuss 970807 & 970904 Events
05000354/LER-1997-020, Forwards LER 97-020-00 Re Past Inoperability of Safety Related Chiller Due to Operation W/Low Safety Auxiliary Cooling Sys Temp.Commitments Made by Util,Attached27 September 1997Forwards LER 97-020-00 Re Past Inoperability of Safety Related Chiller Due to Operation W/Low Safety Auxiliary Cooling Sys Temp.Commitments Made by Util,AttachedUltimate heat sink
05000354/LER-1997-021, Forwards LER 97-021-00 Entitled, Standby Liquid Control Sys Tank Concentration Below TS Limits. Commitments Made within Rept,Encl22 September 1997Forwards LER 97-021-00 Entitled, Standby Liquid Control Sys Tank Concentration Below TS Limits. Commitments Made within Rept,Encl
05000354/LER-1997-022, Forwards LER 97-022-00 Re Unplanned Manual Scram Following Relay Malfunction in a Phase Main Generator step-up Transformer.Commitments Made by Util,Encl6 October 1997Forwards LER 97-022-00 Re Unplanned Manual Scram Following Relay Malfunction in a Phase Main Generator step-up Transformer.Commitments Made by Util,Encl
05000354/LER-1997-023, Forwards LER 97-023-01 Re Core Spray Nozzle Weld through- Wall Leak.Commitments Made by Util,Encl28 November 1997Forwards LER 97-023-01 Re Core Spray Nozzle Weld through- Wall Leak.Commitments Made by Util,Encl
05000354/LER-1997-024, Forwards LER 97-024-00 Re as Found Values for Safety Relief Valve Lift Setpoints Exceed Tech Spec Allowable Limits. Attachment a Represent Commitments Util Made to NRC Relative to LER20 October 1997Forwards LER 97-024-00 Re as Found Values for Safety Relief Valve Lift Setpoints Exceed Tech Spec Allowable Limits. Attachment a Represent Commitments Util Made to NRC Relative to LER
05000354/LER-1997-025, Forwards LER 97-025-00 Re Design Deficiency Potential for Unmonitored Release Path Through Station Svc Water Sys. Commitment Util Made to NRC Relative to Ler,Encl27 October 1997Forwards LER 97-025-00 Re Design Deficiency Potential for Unmonitored Release Path Through Station Svc Water Sys. Commitment Util Made to NRC Relative to Ler,Encl
05000354/LER-1997-026, Forwards LER 97-026-00,re Inoperable E Filtration, Recirculation,Ventilation Sys Recirculation Unit Due to Tripped High High Temperature Switch.Commitment,Listed19 November 1997Forwards LER 97-026-00,re Inoperable E Filtration, Recirculation,Ventilation Sys Recirculation Unit Due to Tripped High High Temperature Switch.Commitment,Listed
05000354/LER-1997-031, Forwards LER 97-031-00 Re Reactor Core Isolation Cooling Sys Isolation.Commitments Made by Util Also Encl24 December 1997Forwards LER 97-031-00 Re Reactor Core Isolation Cooling Sys Isolation.Commitments Made by Util Also Encl
05000354/LER-1997-032, Forwards LER 97-032-00 Re Inoperability of HPCI & Rcic. Commitments Made by Util,Encl2 January 1998Forwards LER 97-032-00 Re Inoperability of HPCI & Rcic. Commitments Made by Util,Encl
05000354/LER-1997-034, Forwards LER 97-034-01, Condition Prohibited by Ts:Missed EDG Surveillance. Util Commitments to NRC Re Subj LER Encl6 April 1998Forwards LER 97-034-01, Condition Prohibited by Ts:Missed EDG Surveillance. Util Commitments to NRC Re Subj LER Encl
05000354/LER-1998-001, Forwards LER 98-001-00,re Missed HPCI Surveillance Resulting in Unavailability of HPCI16 March 1998Forwards LER 98-001-00,re Missed HPCI Surveillance Resulting in Unavailability of HPCI
05000354/LER-1998-002, Forwards LER 98-002-00, TS Prohibited Condition - Indequate Filtration,Recirculation & Ventilation Sys Surveillance Test, Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Encl20 April 1998Forwards LER 98-002-00, TS Prohibited Condition - Indequate Filtration,Recirculation & Ventilation Sys Surveillance Test, Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Encl
05000354/LER-1998-003, Forwards LER 98-003-00 Re Concurrent Inoperability of a & B Cr.Commitments Made by Pse&G,Encl7 May 1998Forwards LER 98-003-00 Re Concurrent Inoperability of a & B Cr.Commitments Made by Pse&G,Encl
05000354/LER-1998-004, Forwards LER 98-004-00 Re EDG Inoperability in Excess of Allowed Outage Time,Due to High Particulate Concentration in Diesel Fuel Oil Storage Tanks22 June 1998Forwards LER 98-004-00 Re EDG Inoperability in Excess of Allowed Outage Time,Due to High Particulate Concentration in Diesel Fuel Oil Storage Tanks
05000354/LER-1998-006, Forwards LER 98-006-00,entitled Inadequate Performance of Primary Containment Integrity Verification, IAW 10CFR50.73(a)(2)(i)(B).Commitments Made by Util,Encl13 October 1998Forwards LER 98-006-00,entitled Inadequate Performance of Primary Containment Integrity Verification, IAW 10CFR50.73(a)(2)(i)(B).Commitments Made by Util,Encl
05000354/LER-1998-008, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a4 May 1999Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a
05000354/LER-1999-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made26 March 1999Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made
05000354/LER-1999-004, Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl8 April 1999Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl
05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER15 June 1999Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER
05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl14 July 1999Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl
05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl20 September 1999Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl
IA-86-278, Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR27 June 1986Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDRNondestructive Examination
IA-86-404, Responds to FOIA Request.Document Listed in App Available in Pdr.W/O Encl3 June 1986Responds to FOIA Request.Document Listed in App Available in Pdr.W/O Encl
IA-96-525, Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR6 February 1997Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR
IA-98-179, Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in PDR6 May 1998Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in PDR