05000298/LER-1978-029, Forwards LER 78-029/03L-0 | 12 September 1978 | Forwards LER 78-029/03L-0 | |
05000298/LER-1978-030, Forwards LER 78-030/03L-0 | 12 September 1978 | Forwards LER 78-030/03L-0 | |
05000298/LER-1978-038, Forwards LER 78-038/03L-0 | 27 December 1978 | Forwards LER 78-038/03L-0 | |
05000298/LER-1978-039, Forwards LER 78-039/03L-0 | 5 January 1979 | Forwards LER 78-039/03L-0 | |
05000298/LER-1980-051, Forwards LER 80-051/03L-0 | 13 January 1981 | Forwards LER 80-051/03L-0 | |
05000298/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Submitted | 28 May 1982 | Forwards LER 82-009/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Submitted | 1 June 1982 | Forwards LER 82-010/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-011, Forwards LER 82-011/03-0.Detailed Event Analysis Submitted | 11 June 1982 | Forwards LER 82-011/03-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted | 21 June 1982 | Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Submitted | 28 June 1982 | Forwards LER 82-013/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-015, Forwards LER 82-015/03L-0.Detailed Event Analysis Submitted | 5 August 1982 | Forwards LER 82-015/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-016, Forwards LER 82-016/03L-0.Detailed Event Analysis Submitted | 10 August 1982 | Forwards LER 82-016/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-017, Forwards LER 82-017/03L-0.Detailed Event Analysis Submitted | 10 August 1982 | Forwards LER 82-017/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-018, Forwards LER 82-018/03L-0.Detailed Event Analysis Submitted | 26 August 1982 | Forwards LER 82-018/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-019, Forwards LER 82-019/03L-0.Detailed Event Analysis Submitted | 13 August 1982 | Forwards LER 82-019/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Submitted | 22 October 1982 | Forwards LER 82-020/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-023, Forwards LER 82-023/03L-0.Detailed Event Analysis Submitted | 23 December 1982 | Forwards LER 82-023/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1982-026, Forwards LER 82-026/03L-0.Detailed Event Analysis Submitted | 15 February 1983 | Forwards LER 82-026/03L-0.Detailed Event Analysis Submitted | Half scram |
05000298/LER-1983-001, Forwards LER 83-001/03L-0.Detailed Event Analysis Submitted | 17 March 1983 | Forwards LER 83-001/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1983-002, Forwards LER 83-002/03L-0.Detailed Event Analysis Submitted | 17 March 1983 | Forwards LER 83-002/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1983-003, Forwards LER 83-003/03L-0.Detailed Event Analysis Submitted | 29 April 1983 | Forwards LER 83-003/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1983-004, Forwards LER 83-004/03L-0.Detailed Event Analysis Submitted | 29 April 1983 | Forwards LER 83-004/03L-0.Detailed Event Analysis Submitted | |
05000298/LER-1983-013, Forwards LER 83-013/03L-0.Detailed Event Analysis Encl | 27 September 1983 | Forwards LER 83-013/03L-0.Detailed Event Analysis Encl | |
05000298/LER-1985-011, Identifies Defect in Certain DC Motor Starters Used for Controlling ECCS & Primary Containment Isolation Valves, Initially Reported in 851119 LER 85-011.Certain Starters Missing Spacers,Causing Cracking of Disconnect Switch | 26 December 1985 | Identifies Defect in Certain DC Motor Starters Used for Controlling ECCS & Primary Containment Isolation Valves, Initially Reported in 851119 LER 85-011.Certain Starters Missing Spacers,Causing Cracking of Disconnect Switch | |
05000298/LER-1988-008, Forwards LER 88-008 & Rev 1 to LER 88-016 | 30 June 1988 | Forwards LER 88-008 & Rev 1 to LER 88-016 | |
05000298/LER-1992-003, Provides Supplemental Info on Rev 0 to LER 92-003 Re Degradation in safety-related Battery Cells,Per NRC Info Notice 89-017.Existing Monitoring of Battery Cells Provides Ample Advanced Notification of Need to Replace Cells | 19 October 1992 | Provides Supplemental Info on Rev 0 to LER 92-003 Re Degradation in safety-related Battery Cells,Per NRC Info Notice 89-017.Existing Monitoring of Battery Cells Provides Ample Advanced Notification of Need to Replace Cells | |
05000298/LER-1992-008, Forwards Corrected LER 92-008-00,containing Info Re Component Failure Inadvertently Omitted from Initial Submittal | 14 July 1992 | Forwards Corrected LER 92-008-00,containing Info Re Component Failure Inadvertently Omitted from Initial Submittal | |
05000298/LER-1992-019, Forwards Corrected LER 92-019-00,including Event Date Inadvertently Omitted from 930128 Memo | 29 January 1993 | Forwards Corrected LER 92-019-00,including Event Date Inadvertently Omitted from 930128 Memo | |
05000298/LER-1994-029, Informs NRC That Plant Will Not Be Submitting LER 94-029. Number Internally Assigned to Potentially Reportable Condition That Later Determined Not Reportable | 23 January 1995 | Informs NRC That Plant Will Not Be Submitting LER 94-029. Number Internally Assigned to Potentially Reportable Condition That Later Determined Not Reportable | |
05000298/LER-1995-020, Forwards Rev 1 to LER 95-020,identifying Conditions Affecting Originally Reported Cause & Corrective Actions,As Result of Further Investigation | 7 May 1996 | Forwards Rev 1 to LER 95-020,identifying Conditions Affecting Originally Reported Cause & Corrective Actions,As Result of Further Investigation | |
05000298/LER-1997-009, Forwards LER 97-009-01,clarifying Length of Time That a RPS Bus Was Supplied from Alternative Power Source.Info Supplied on Issue in Original LER Was Unclear & Subject to Misinterpretation | 3 October 1997 | Forwards LER 97-009-01,clarifying Length of Time That a RPS Bus Was Supplied from Alternative Power Source.Info Supplied on Issue in Original LER Was Unclear & Subject to Misinterpretation | |
05000298/LER-1997-010, Forwards LER 97-010-02 Restandby Gas Treatment Inoperability Due to Design Deficiency.Rev Provides Addl Info on Safety Significance of Event | 16 July 1998 | Forwards LER 97-010-02 Restandby Gas Treatment Inoperability Due to Design Deficiency.Rev Provides Addl Info on Safety Significance of Event | |
05000298/LER-1997-014, Forwards LER 97-014-00,for Which Addl Time Was Required to Provide Full & Accurate Description of Event & Safety Consequences | 12 December 1997 | Forwards LER 97-014-00,for Which Addl Time Was Required to Provide Full & Accurate Description of Event & Safety Consequences | |
05000298/LER-1997-015, Forwards LER 97-015-00,which Was Due on 971208.Requested Addl Time to Provide Full & Accurate Description of Event on 971208 Telcon W/Cs Marschall of NRC | 12 December 1997 | Forwards LER 97-015-00,which Was Due on 971208.Requested Addl Time to Provide Full & Accurate Description of Event on 971208 Telcon W/Cs Marschall of NRC | |
05000298/LER-1998-005, Forwards Rev 1 to LER 98-005 Which Corrects Administrative Errors on Page 2 of Rept | 14 May 1998 | Forwards Rev 1 to LER 98-005 Which Corrects Administrative Errors on Page 2 of Rept | |
05000298/LER-1998-011, Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl | 19 January 1999 | Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl | |
05000298/LER-1998-013, Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl | 16 March 1999 | Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl | Missed surveillance |
05000298/LER-1999-001, Forwards LER 99-001-00,including List of NRC Commitments Made by Util | 22 March 1999 | Forwards LER 99-001-00,including List of NRC Commitments Made by Util | |
05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel | 23 August 1999 | Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel | Stroke time Enforcement Discretion |
05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl | 28 June 1999 | Forwards LER 99-004-01.Commitments Made by Util Are Encl | Corrosion bonding |
05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl | 1 July 1999 | Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl | |
05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl | 26 August 1999 | Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl | |
A800020, Responds to Re LWR Primary Coolant Sys Pressure Isolation Valves.Review Conducted of High Pressure Piping Penetrating Drywell & Connecting to Primary Coolant Sys. Forwards Drawings of Sys Connecting to Low Pressure Piping | 17 March 1980 | Responds to Re LWR Primary Coolant Sys Pressure Isolation Valves.Review Conducted of High Pressure Piping Penetrating Drywell & Connecting to Primary Coolant Sys. Forwards Drawings of Sys Connecting to Low Pressure Piping | |
A800058, Forwards Endorsement 41 to Maelu Policy MF-70 & Endorsement 51 to Nelia Policy NF-200 | 7 May 1981 | Forwards Endorsement 41 to Maelu Policy MF-70 & Endorsement 51 to Nelia Policy NF-200 | |
A810007, Responds to NRC Re Violations Noted in IE Insp Rept 50-298/81-19.Corrective actions:1/2-inch Tolerance Between Weld & Edge of Overlay Was Specified for Dimensional Tolerances | 17 November 1981 | Responds to NRC Re Violations Noted in IE Insp Rept 50-298/81-19.Corrective actions:1/2-inch Tolerance Between Weld & Edge of Overlay Was Specified for Dimensional Tolerances | Weld Overlay |
A810017, Forwards Response to NRC 810306 Request for Addl Info Re Adequacy of Station Electric Distribution Sys Voltages | 4 May 1981 | Forwards Response to NRC 810306 Request for Addl Info Re Adequacy of Station Electric Distribution Sys Voltages | |
A820001, Advises That Commitment Date,Per ,Re NUREG-0737, Item II.A.1.2, Upgrade Emergency Support Facilities, Will Not Be Met,Due to Extensive Contractual Negotiations & Legal Reviews | 16 December 1982 | Advises That Commitment Date,Per ,Re NUREG-0737, Item II.A.1.2, Upgrade Emergency Support Facilities, Will Not Be Met,Due to Extensive Contractual Negotiations & Legal Reviews | |
A820002, Responds to NRC Re Violations Noted in IE Insp Rept 50-298/82-16.Corrective Actions:Entry Ways Into Affected Area Posted,Locked or Observable to Radiographer. Disciplinary Action Taken Re Procedure 7.4.4,Revision 12 | 10 September 1982 | Responds to NRC Re Violations Noted in IE Insp Rept 50-298/82-16.Corrective Actions:Entry Ways Into Affected Area Posted,Locked or Observable to Radiographer. Disciplinary Action Taken Re Procedure 7.4.4,Revision 12 | |
A820015, Forwards Response to 10CFR50,App R Re Fire Protection Rule | 28 June 1982 | Forwards Response to 10CFR50,App R Re Fire Protection Rule | Safe Shutdown Exemption Request |
A820016, Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation | 28 July 1982 | Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation | |