Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-95-050, Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-362 | 1 November 1995 | Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-362 | VT-2 Incorporated by reference Fire Watch Scaffolding |
ML19294B288 | 31 December 1979 | Environ Statements Project, Monthly Progress Rept for Dec 1979 | |
ML19324A618 | 31 October 1988 | Technical Evaluation Rept for Evaluation of ODCM (Updated Through Rev 19) San Onofre Nuclear Station Units 2 & 3. | Boric Acid Offsite Dose Calculation Manual |
ML19341C698 | 31 December 1980 | Environ Statements Project, Monthly Progress Rept for Dec 1980 | |
ML19347E925 | 31 March 1981 | Environ Statements Project, Progress Rept for Mar 1981 | |
ML20003F957 | 28 February 1981 | Environ Statements Project, Monthly Progress Rept for Feb 1981 | |
ML20005B172 | 31 May 1981 | Environ Statements Project, Monthly Progress Rept for May 1981 | |
ML20009A086 | 30 June 1981 | V.C. Summer Nuclear Station Unit 1 Emergency Feedwater System Reliability Study Evaluation | Fire Barrier Earthquake |
ML20024B957 | 31 July 1983 | Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. | |
ML20028B492 | 31 October 1982 | Ser,Inservice Testing Program,Vc Summer Nuclear Station, Interim Rept | |
ML20038A811 | 31 October 1981 | San Onofre Nuclear Generating Station,Units 2 and 3, Auxiliary Feedwater System Reliability Study Evaluation | |
ML20039A727 | 31 October 1981 | Small & Large Break Calculations for San Onofre Unit 2, Technical Rept | Loop seal Fuel cladding |
ML20054E896 | 31 March 1982 | Control of Heavy Loads at Nuclear Power Plants,Virgil C Summer Nuclear Station,Unit 1, Draft | Safe Shutdown Control of Heavy Loads |
ML20054M866 | 31 May 1982 | Technical Evaluation Rept of Overpressure Protection Sys for San Onofre Nuclear Generating Station,Unit 1, Informal Rept | |
ML20072Q025 | 31 May 1994 | Technical Evaluation Rept Pump & Valve IST Program for Plant | Boric Acid Probabilistic Risk Assessment Cold shutdown justification Scaffolding |
ML20078D073 | 31 August 1983 | Control of Heavy Loads at Nuclear Power Plants,Vc Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept | Safe Shutdown Coatings Control of Heavy Loads |
ML20079A615 | 30 September 1990 | Technical Evaluation Rept Pump & Valve Inservice Testing Program San Onofre Generating Station,Units 2 & 3 | Boric Acid Stroke time Cold shutdown justification Power Operated Valves |
ML20080J718 | 28 February 1995 | Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:San Onofre-2/3,' Technical Evaluation Rept | |
ML20081J709 | 31 October 1983 | Cost/Benefit Analysis of Adding a Feed and Bleed Capability to Combustion Engineering Pressurized Water Reactors | High Radiation Area Hydrostatic Probabilistic Risk Assessment |
ML20082P829 | 30 June 1991 | Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept | Boric Acid Stroke time Cold shutdown justification Power Operated Valves |
ML20086Q752 | 29 February 1984 | Conformance to Reg Guide 1.97,San Onofre Nuclear Generating Station Units 2 & 3 | Grab sample |
ML20087Q085 | 13 July 1983 | Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept | |
ML20091K100 | 19 November 1991 | Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation | Safe Shutdown Emergency Lighting Battery sizing Earthquake |
ML20094D248 | 13 December 1991 | Final, Technical Evaluation Rept,San Onofre Nuclear Generating Station,Units 2 & 3,Station Blackout Evaluation | Safe Shutdown Emergency Lighting Battery sizing |
ML20100P541 | 31 October 1990 | Draft, Auxiliary Feedwater Sys Risk Based Insp Guide for San Onofre Unit 2 Nuclear Power Plant | Packing leak Probabilistic Risk Assessment |
ML20113H105 | 30 November 1991 | Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant | Probabilistic Risk Assessment |
ML20116A484 | 30 September 1992 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant | Stroke time Probabilistic Risk Assessment |
ML20126E986 | 31 May 1985 | Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept | |
ML20127D738 | 31 August 1983 | Rev 1 to Control of Heavy Loads at Nuclear Power Plants, VC Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20128H779 | 30 June 1985 | Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept | |
ML20128N445 | 28 February 1993 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the San Onofre Unit 2 Nuclear Power Plant | Packing leak Stroke time Probabilistic Risk Assessment |
ML20132C051 | 30 June 1985 | Technical Evaluation Rept for Direct Generation of Floor Spectrum for Long-Term Svc Seismic Reevaluation,San Onofre Nuclear Generating Station Unit 1, Informal Rept | |
ML20134A241 | 31 July 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,San Onofre Nuclear Generating Station Unit 1 | |
ML20136F653 | 31 December 1985 | Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept | Nondestructive Examination |
ML20137J693 | 20 August 1985 | Masonry Wall Design,San Onofre Unit 1, Technical Evaluation Rept | |
ML20138J949 | 30 September 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 | |
ML20140H579 | 10 December 1996 | Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station | Safe Shutdown Loop seal Mission time Internal Flooding Probabilistic Risk Assessment Emergency Lighting Severe Accident Management Guideline |
ML20151K789 | 30 April 1988 | Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept | Boric Acid Anticipated operational occurrence Fuel cladding |
ML20195J152 | 31 December 1987 | Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept | Boric Acid Stroke time Power Operated Valves |
ML20197G858 | 27 March 1986 | Evaluation of Dcrdr Program Plan for San Onofre Nuclear Generating Station Unit 1. Suggested Agenda for Unit 1 in-progress Audit & Units 2 & 3 Preimplementation Audit Encl | |
ML20198A492 | 31 March 1986 | Assessment of Manual Loading of Diesel Generators for Loss of Offsite Power,San Onofre,Unit 1 | Anticipated operational occurrence |
ML20199H233 | 31 May 1986 | Technical Evaluation Rept for San Onofre Nuclear Generating Station 1,Seismic Criteria for Long-Term Svc for Piping, Mechanical Equipment,Electrical Equipment & Raceways & Associated Supports | Finite Element Analysis Earthquake |
ML20199H251 | 31 May 1986 | Audit & Insp Rept for San Onofre Nuclear Generating Station 1 Long-Term Svc Program for Piping & Associated Supports, Mechanical Equipment & Associated Supports,Electrical Raceways & Associated Supports.. | Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake |
ML20199H265 | 31 May 1986 | Technical Evaluation Rept - Structural Design Issues Long- Term Svc Seismic Reevaluation,San Onofre Nuclear Power Generating Station 1 | Hydrostatic Earthquake |
ML20199H271 | 30 June 1986 | Long-Term Svc Program Confirmatory Analysis of San Onofre Nuclear Generating Station 1 Piping & Pipe Supports | Finite Element Analysis Earthquake |
ML20203F860 | 23 April 1986 | Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & App R to 10CFR50,San Onofre Nuclear Generating Station Unit 1, Technical Evaluation Rept | Safe Shutdown Boric Acid Fire Barrier Coatings Emergency Lighting Exemption Request Fire Protection Program |
ML20203G741 | 27 March 1986 | Technical Evaluation of Dcrdr,San Onofre Generating Station,Units 2 & 3 | |
ML20204G192 | 31 July 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe | |
ML20205F054 | 29 October 1985 | Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based On...Atws Events),Item 1.2, `Post-Trip Review,' Data & Info Capabilities for VC Summer Nuclear Station Unit 1 | |
ML20206Q452 | 31 July 1986 | Conformance to Reg Guide 1.97,San Onofre Nuclear Generating Station,Unit 1 |