Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
L-95-050, Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-3621 November 1995Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-362VT-2
Incorporated by reference
Fire Watch
Scaffolding
ML19294B28831 December 1979Environ Statements Project, Monthly Progress Rept for Dec 1979
ML19324A61831 October 1988Technical Evaluation Rept for Evaluation of ODCM (Updated Through Rev 19) San Onofre Nuclear Station Units 2 & 3.Boric Acid
Offsite Dose Calculation Manual
ML19341C69831 December 1980Environ Statements Project, Monthly Progress Rept for Dec 1980
ML19347E92531 March 1981Environ Statements Project, Progress Rept for Mar 1981
ML20003F95728 February 1981Environ Statements Project, Monthly Progress Rept for Feb 1981
ML20005B17231 May 1981Environ Statements Project, Monthly Progress Rept for May 1981
ML20009A08630 June 1981V.C. Summer Nuclear Station Unit 1 Emergency Feedwater System Reliability Study EvaluationFire Barrier
Earthquake
ML20024B95731 July 1983Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant.
ML20028B49231 October 1982Ser,Inservice Testing Program,Vc Summer Nuclear Station, Interim Rept
ML20038A81131 October 1981San Onofre Nuclear Generating Station,Units 2 and 3, Auxiliary Feedwater System Reliability Study Evaluation
ML20039A72731 October 1981Small & Large Break Calculations for San Onofre Unit 2, Technical ReptLoop seal
Fuel cladding
ML20054E89631 March 1982Control of Heavy Loads at Nuclear Power Plants,Virgil C Summer Nuclear Station,Unit 1, DraftSafe Shutdown
Control of Heavy Loads
ML20054M86631 May 1982Technical Evaluation Rept of Overpressure Protection Sys for San Onofre Nuclear Generating Station,Unit 1, Informal Rept
ML20072Q02531 May 1994Technical Evaluation Rept Pump & Valve IST Program for PlantBoric Acid
Probabilistic Risk Assessment
Cold shutdown justification
Scaffolding
ML20078D07331 August 1983Control of Heavy Loads at Nuclear Power Plants,Vc Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation ReptSafe Shutdown
Coatings
Control of Heavy Loads
ML20079A61530 September 1990Technical Evaluation Rept Pump & Valve Inservice Testing Program San Onofre Generating Station,Units 2 & 3Boric Acid
Stroke time
Cold shutdown justification
Power Operated Valves
ML20080J71828 February 1995Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:San Onofre-2/3,' Technical Evaluation Rept
ML20081J70931 October 1983Cost/Benefit Analysis of Adding a Feed and Bleed Capability to Combustion Engineering Pressurized Water ReactorsHigh Radiation Area
Hydrostatic
Probabilistic Risk Assessment
ML20082P82930 June 1991Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation ReptBoric Acid
Stroke time
Cold shutdown justification
Power Operated Valves
ML20086Q75229 February 1984Conformance to Reg Guide 1.97,San Onofre Nuclear Generating Station Units 2 & 3Grab sample
ML20087Q08513 July 1983Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept
ML20091K10019 November 1991Final Technical Evaluation Rept Virgil C Summer Station Blackout EvaluationSafe Shutdown
Emergency Lighting
Battery sizing
Earthquake
ML20094D24813 December 1991Final, Technical Evaluation Rept,San Onofre Nuclear Generating Station,Units 2 & 3,Station Blackout EvaluationSafe Shutdown
Emergency Lighting
Battery sizing
ML20100P54131 October 1990Draft, Auxiliary Feedwater Sys Risk Based Insp Guide for San Onofre Unit 2 Nuclear Power PlantPacking leak
Probabilistic Risk Assessment
ML20113H10530 November 1991Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power PlantProbabilistic Risk Assessment
ML20116A48430 September 1992Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power PlantStroke time
Probabilistic Risk Assessment
ML20126E98631 May 1985Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept
ML20127D73831 August 1983Rev 1 to Control of Heavy Loads at Nuclear Power Plants, VC Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20128H77930 June 1985Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept
ML20128N44528 February 1993Auxiliary Feedwater System RISK-BASED Inspection Guide for the San Onofre Unit 2 Nuclear Power PlantPacking leak
Stroke time
Probabilistic Risk Assessment
ML20132C05130 June 1985Technical Evaluation Rept for Direct Generation of Floor Spectrum for Long-Term Svc Seismic Reevaluation,San Onofre Nuclear Generating Station Unit 1, Informal Rept
ML20134A24131 July 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,San Onofre Nuclear Generating Station Unit 1
ML20136F65331 December 1985Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation ReptNondestructive Examination
ML20137J69320 August 1985Masonry Wall Design,San Onofre Unit 1, Technical Evaluation Rept
ML20138J94930 September 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1
ML20140H57910 December 1996Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear StationSafe Shutdown
Loop seal
Mission time
Internal Flooding
Probabilistic Risk Assessment
Emergency Lighting
Severe Accident Management Guideline
ML20151K78930 April 1988Conformance to Reg Guide 1.97:Summer, Technical Evaluation ReptBoric Acid
Anticipated operational occurrence
Fuel cladding
ML20195J15231 December 1987Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation ReptBoric Acid
Stroke time
Power Operated Valves
ML20197G85827 March 1986Evaluation of Dcrdr Program Plan for San Onofre Nuclear Generating Station Unit 1. Suggested Agenda for Unit 1 in-progress Audit & Units 2 & 3 Preimplementation Audit Encl
ML20198A49231 March 1986Assessment of Manual Loading of Diesel Generators for Loss of Offsite Power,San Onofre,Unit 1Anticipated operational occurrence
ML20199H23331 May 1986Technical Evaluation Rept for San Onofre Nuclear Generating Station 1,Seismic Criteria for Long-Term Svc for Piping, Mechanical Equipment,Electrical Equipment & Raceways & Associated SupportsFinite Element Analysis
Earthquake
ML20199H25131 May 1986Audit & Insp Rept for San Onofre Nuclear Generating Station 1 Long-Term Svc Program for Piping & Associated Supports, Mechanical Equipment & Associated Supports,Electrical Raceways & Associated Supports..Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Earthquake
ML20199H26531 May 1986Technical Evaluation Rept - Structural Design Issues Long- Term Svc Seismic Reevaluation,San Onofre Nuclear Power Generating Station 1Hydrostatic
Earthquake
ML20199H27130 June 1986Long-Term Svc Program Confirmatory Analysis of San Onofre Nuclear Generating Station 1 Piping & Pipe SupportsFinite Element Analysis
Earthquake
ML20203F86023 April 1986Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & App R to 10CFR50,San Onofre Nuclear Generating Station Unit 1, Technical Evaluation ReptSafe Shutdown
Boric Acid
Fire Barrier
Coatings
Emergency Lighting
Exemption Request
Fire Protection Program
ML20203G74127 March 1986Technical Evaluation of Dcrdr,San Onofre Generating Station,Units 2 & 3
ML20204G19231 July 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe
ML20205F05429 October 1985Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based On...Atws Events),Item 1.2, `Post-Trip Review,' Data & Info Capabilities for VC Summer Nuclear Station Unit 1
ML20206Q45231 July 1986Conformance to Reg Guide 1.97,San Onofre Nuclear Generating Station,Unit 1