ML20005B172

From kanterella
Jump to navigation Jump to search
Environ Statements Project, Monthly Progress Rept for May 1981
ML20005B172
Person / Time
Site: Summer, San Onofre, 05000467, Allens Creek  Southern California Edison icon.png
Issue date: 05/31/1981
From: Zittel H
OAK RIDGE NATIONAL LABORATORY
To: Regan W
Office of Nuclear Reactor Regulation
References
CON-FIN-B-0760-1, CON-FIN-B-760-1 ORNL-ED-EIS-154, NUDOCS 8107060404
Download: ML20005B172 (4)


Text

. .

J 2

N RC Researc1 and ~~ecanica N Assistance Repor.

INTERIM REPORT

[ Accession No.

ORNL/ED/EIS-154 Project

Title:

Environmental Statements Project l Subject of this Document: Monthly Progress Report l Type.of Document: Monthly Progress Raport l.

l l

I

'Date'of Document: May 1981 l

l Responsible NRC Individual and NRC Office or Division: Wm. H. Regan, NRR This document was prepared crimarily for preliminary or internal use. It has not

! received' full review and approval. Since

.there may be substantive changes, this document should not be considered final.

Prepared for U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Under Interagency Agreement 40-544-75 NRC FIN No. B0760-1 D  %

s . A OAK RIDGE NATIONAL LABORATORY .

I

! Oak Ridge, Tennessee 37830 operated by p h(.-(Jf

. g UNION CARBIDE CORPORATION - JUN 3019815 C  :

3q for the , u.s m ,g,ron ;gi DEPARTMENT OF ENERGY (J. N INTERIM REPORT

--81070604o40105g PDR RES .gR

0AK RIDGE NATIONAL LABORATORY MONTHLY REPORT May 1981 A. Status of Environmental Reviews Allens Creek _ J. 3. Cannon, Project Manager The staff has appeared at the ASLB hearings which reconvened in May. It is our understaading that this completes our hearing effort.

San Onofre . Units 2 and 3 - R.- M. Rush, Project Manager The FES has been issued. ' There is at present no indice.: ion of ASL3 hearings.

Virgil C. Summer Nuclear Station - N. E. Hinkle, Project Manager The FES has been issued and the staff will discontinue activity.until ASLB hearings if required.

B. ' Support Group Activities

- Environmental Fluid Dynamics Group

- No activity.

C. Eudget Project-costs'are reported in the attached tables.

D. Remarks None' fg.

H. E. Z'ttel, Manager Environmental Statements Project 4-- --

m -...__.a__--_m __a-_-..i_-__m.__.m.____.____.-_.___.-___._---__.__---_____.___om-_____._._.__ _ - - -.--___ _ _ _ _ _ _ __.---___m -

ENVIRONMENTAL STATEMENTS PROJECT COST AND MANPOWER DEVOTED TO ORNL WORK FOR THE DIVISION OF SITE SAFETY AND ENVIRONMENTAL ANALYSIS May 1981 FY-1981 ' Prior Years HMs Project Cost MYs Project Cost Cost MYs l

San Onofre 2, 3 0.77 7011 0.1 13,599 267,235 2.69 Virgil C. Summer ---

1263 ---

1,929 219,499 2.00 Allens Creek 4.02 25,483 1.57 145,032 282,949 2.62 Douglas Point'1 and 2 --- --- --- ---

290,098 4.18 South Texas --- --- ---

i.

Others --- --- ---

TOTALS 4.79 33,757 1.67 160,560 N RC Research ancechnicaL x Assistance Report -

m

r.

9 ORNL/ED/EIS-154

. Internal Distribution

~1. 'A..L. Lotts

2. W. Fulkerson
3. S. G.'Hildebrand
4. . : Laboratory Records (RC)

'5-6. H. E. Zittel External Distribution

7. -Office of Assistant Manager for Energy Research and Development, Department of Energy, Oak Ridge Operations Office, Oak Ridge, TN. 37830 ~

8-9. Division of Technical Information and Document Control, U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555 10-11. Technical-Information Center, U.S. Department of Energy, P. 'O. Box 62, Oak Ridge, TN. 37830 12.- D.' Muller, Assistant Director for Environmental Technology, Division of Engineering, Office of Nuclear Reactor Regulation,

'U.S. Nuclear Regulatory Commission,' Washington, D.C. 20555

~

L13. Director, Division of Engineering, Attention C. Poslusny,

' Chief, Siting; Analysis Branch, U.S. Nuclear Regulatory Commission,~ Washington, D.C. 20555

_ 14. B. L'. Grenier,.NRR,:U.S. Nuclear Regulatory Commission, Washington, D.C. 20555

15-20. William H. Regan, U.S. Nuclear Regulatory Commission,

-Washington,,D.C. 20555 a

% s

__ _ _ _ _ _ _ _ - _ _ . . _ _ _ _ . -