NRC Researca anGec'anical Assistance Report INTERIM REPORT Accession No.
ORNL/ED/EIS-o Project
Title:
Environmental Statements Project APR24ggg i
Subject of this Document: Monthly Progress Report
%g Type of Document:
Monthly Progress Report t
Date of Document:
February 1981 Responsible NRC Individual and NRC Office or Division: Wm. H. Regan, NRR i
This document was prepared primarily for k
preliminary or internal use.
It has not
\\,
received full review and approval.
Since there my be substantive changes, this document'should not be considered final.
l l
NRC Researc'1 anc Tec1nical Assistance Repor:
Prepared for l
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 I
Under Interagency Agreement 40-544-75 l
NRC FIN No. B0760-1 l
l l
0AK RIDGE NATIONAL LABOLATORY Oak Ridge, Tennessee 37830 operated by UNION CARBIDE CORPORATION for the 81042701%
DEPARTMENT OF ENERGY INTERIM REPORT
NRC Researc1 anc ec1nica
~~
Assistance Report 0AK RIDGE NATIONAL LABORATORY MONTHLY REPORT February 1981 A.
Status of Environmental Reviews Allens Creek - J. B. Cannon, Project Manager The ASLB hearings for Allens Creek Have reconvened.
Seven staff members have been in attendance and have offered testimony as required over a period of several weeks.
San Onofre Units 2 and 3 - R. M. Rush, Project Manager The staff has assessed the impact of the heat treatment (reverse flow) proposed for the cooling water system. The assessment is being transmitted to the EPM (D. Sca11etti).
Virgil C. Summer Nuclear Station - N. E. Hinkle, Project Manager No appreciable activity.
The staff is awaiting issuance of the FES.
B.
Support Group Activities Environmental Fluid Dynamics Group No activity.
C.
Budget Project costs are reported in the attached tables.
D.
Remarks Because of the high level of activity required at the Allens Creek hearings, the staff cost has over run the authorized funds.
Wm. Regan has been notified and has agreed to authorize the necessary further funding.
Y 5.
H. E. Zittel, Manager Environmental Statements Project HEZ/lb1 X RC 'Researca anc ec'anicaL Assistance Report.-
.hiY i 0
.i'!{}k 1
ENVIRONMENTAL STATEMENTS PROJECT COST AND MANPOWER DEVOTED TO ORNL WORK FOR THE DIVISION OF SITE' SAFETY AND ENVIROP'. ENTAL ANALYSIS
~
February 1981 FY-1981 Prior Years mms Project Cost MYs Project Cost Cost MYs San Onofre 2,3 0.1 700 0.02 1,332 267,235 2.69 Virgil C. Summer 40 0.01 603 219,499 2.00 Allens Creek 4.68 35,584 1.13 109,141 282,949 2.62 Douglas Point 1 and 2 290,098 4.18 South Texas Others TOTALS 4.78 36,324 1.16 111,076 I
l I
- s' I
e 1
I e
,,-s-,
mm---
p s
e+
~,rsr,----w w w-1 ew w m p--*
w~
--,----or---,--e w--,,
e-,
e-mv-
'm we-n-e w--m, m,
,e e,--
,-~ne,
a ORNL/ED/EIS-148 Internal Distribution 1.
F. R. Mynatt 2.
W. Fulkerson 3.
R. B. Craig 4.
Laboratory Records (RC) 5-6.
H. E. Zittel External Distribution 7.
Office of Assistant Manager for Energy Research and Development, i
Department of Energy, Oak Ridge Operationg Office, Oak Ridge, TN 37830 8-9.
Division of Technical Information and Document Control, U.S.
Nuclear Regulatory Commission, Washington, D. C. 20555 10-11.
Technical Information Center, U.S. Department of Energy, P. O. Box 62, Oak Ridge, TN 37830 12.
D. Muller, Assistant Director for Environmental Technology, Division of of Engineering, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555 13.
Director, Division of Engineering, Attention C. Poslusny, Chief, Siting Analysis Branch, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555 14.
B. L. Grenier, NRR, U. S. Nuclear Regalatory Commission, Washington, D.C. 20555 15-20.
William H. Regan, U.S. Nuclear Regulatory Commission, Washington, D. C. 20555 NRC Researca anc Tecmica Assistance Report
,.--,-.y.-y
---.e
,.r---
,,r..
.#..,w.n