Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19249E755 | 3 August 1979 | Affidavit Attesting That Author,As Supervising Engineer for Util,Answered Util Responses to Jf Doherty Fourth Set of Interrogatories.Certificate of Svc Encl | |
ML19256F498 | 14 September 1979 | Affidavit by General Manager of Public Utils Board of City of Brownsville.Ack That 790502 Responses to Houston Lighting & Power First Set of Interrogatories & 790626 Supplemental Responses to Same Discovery Have Been Reviewed | |
ML19256F514 | 14 September 1979 | Affidavit by Associate General Manager of Public Utils Board,Brownsville,Tx.Ack That 790502 Responses to Houston Lighting & Power First Set of Interrogatories & 790626 Supplemental Responses to Same Discovery Have Been Received | |
ML19305C777 | 27 March 1980 | Affidavit of Re Roundtree,General Manager of Brownsville Public Utils Board Re Agreement Among Tx Ious for Const of Two Dc Interstate Ties of 500 MW & 250 Mw. Brownsville Prepared to Enter Settlement Negotiations | |
ML19305E130 | 10 April 1980 | Affidavit Responding to Public Utils Board of City of Brownsville,Tx Allegation That Brownsville Has Been Excluded from Discussions Re Interconnection.Clarifies Statement Made at 800327 Meeting.Certificate of Svc Encl | |
ML19305E151 | 10 April 1980 | Affidavit Stating That Central & South West Corp,Houston Lighting & Power Co & Tx Utils Co Sys Have Reached Agreement in Principle Re Interconnection Disputes.Agreement May Form Basis for Discussions W/Other Parties.W/Certificate of Svc | |
ML19309F803 | 27 March 1980 | Affidavit Re Settlement Negotiations.Public Utils Board of City of Brownsville,Tx Is Prepared to Enter Negotiations Provided That Electric Industry Benefits Should Flow to All Segments.Supporting Documentation & Certificate of Svc Encl | |
ML19309H648 | 10 April 1980 | Affidavit Stating That 30-day Extension Will Be of Substantial Assistance in Efforts Made for Attaining Settlement.Progress in Negotiations Has Already Been Achieved.Certificate of Svc Encl | |
ML19323D335 | 11 April 1980 | Affidavit Stating Progress of Settlement Negotiations Initiated in Aug 1979.Thirty-day Extension Will Assist in Reaching Reasonable Agreement.Certificate of Svc Encl | |
ML19325D640 | 12 July 1988 | Affidavit of P Reznikoff.* Expresses Concern Re Danger to Health & Safety Posed by Normal Operations of Plant & by Possible Accidents | |
ML19325D643 | 12 July 1988 | Affidavit of B Brink.* Expresses Concern That Operation of Plant Will Cause Loss of Health to Author & Family & Safety Problems at Plant Will Jeopardize Life & Property | |
ML19325D646 | 12 July 1988 | Affidavit of L Burnam.* Expresses Concern That Operation of Plant Will Cause Loss of Health to Author & Family & Safety Problems at Plant Will Jeopardize Life & Property.W/ Certificate of Svc | |
ML19330C560 | 4 August 1980 | Affidavit in Support of Applicant 800804 Motion for Summary Disposition of Fh Potthoff Contention 6.Marine Biomass Farm Is Remote & Speculative Alternative Energy Source Whose Feasibility & Economics Not Assured.W/Certificate of Svc | |
ML19337A048 | 4 August 1980 | Affidavit Re Tx Pirg Contention 50.Concern Re Effects of Ionization on Aircraft Guidance Sys Unfounded Per Elementary Physical Laws.Prof Qualifications,Affidavit,Supporting Documentation & Certificate of Svc Encl | |
ML19338E693 | 25 September 1980 | Affidavit in Support of Applicant Motion for Summary Disposition of Potthoff Contention 6.Marine Biomass Production Is Not Viable Alternative at Present Time.Prof Qualifications Encl | |
ML19338E963 | 2 October 1980 | Affidavit Affirming NRC Position That Impacts of Transmission Pines on Waterfowl Will Be Minimized by Applicant Proposed Routing Which Has No Superior Alternative Available.Prof Qualifications Encl | |
ML19338F094 | 1 October 1980 | Affidavit Attesting to Uncertainty of Future Price & Availability of Natural Gas Generation.Prof Qualifications Encl | |
ML19340D110 | 17 December 1980 | Affidavit Re Health Effects of Low Level Radiation.Supports NRC Statement of Matl Facts Re Consolidated Contention on NEPA Impacts of Low Level Radiation.Prof Qualifications & Certificate of Svc Encl | |
ML19341D737 | 24 March 1981 | Affidavit That Statements in Affidavit Answering L Hamilton 810309 Affidavit Are True & Correct.Certificate of Svc Encl | |
ML19347B386 | 30 September 1980 | Affidavit Re Allens Creek Vs South Tx Project Sites.Cost Comparison Tabulation Encl | |
ML19347B387 | 30 September 1980 | Affidavit Re Site Evaluation.Util Analysis Looks Only to Cost,Not to Benefit.Curriculum Vitae Encl | |
ML19347B388 | 29 September 1980 | Affidavit Re Sources of Groundwater for Facility.Lakes Conroe,Houston & Livingston Can Supply Surface Water to Meet City Demands Through Yr 2000.Curriculum Vitae,Excerpts of C Johnson & Saxion Depositions & Certificate of Svc Encl | |
ML19347B390 | 29 September 1980 | Affidavit Re Natural Gas Plant Alternative.Util Not Automatically Entitled to Fua Exemption Because No Nonattainment Areas Exist in Houston.No Environ Exemptions Available to Util | |
ML19347B392 | 30 September 1980 | Affidavit Re Economic Comparison Between Competing Generation Alternatives.Util Does Not Qualify for Any Exemptions to Fuel Use Act Which Would Allow Unlimited Use of Gas for Unlimited Time.W/Certificate of Svc | |
ML19347B394 | 11 September 1980 | Affidavit Re Latching.In Order for Radioactive Emissions to Effect Electronics on Aircraft,Aircraft Would Have to Park at Site Boundary for Extended Period.Certificate of Svc Encl | |
ML19347B398 | 1 October 1980 | Affidavit Re Impact of Plant on Waterfowl & Other Environ Effects.Line No Longer Extends Over Lake & Thus Does Not Need to Be Moved.Prof Qualifications Encl | |
ML19350B534 | 9 March 1981 | Affidavit in Response to Idj Bross Affidavit Re 1981 Reassessment of Health Hazards of Low Level Ionizing Radiation. Review of Rept Added No Facts to Modify Earlier Conclusions.Certificate of Svc Encl.Related Correspondence | |
ML20003F805 | 7 April 1981 | Affidavit Re Consolidated Contention on Low Level Radiation Risk.Theory That Low Level Radiation Is Harmless Is Myth. Id Bross 800523 Ltr to Lll Encl | |
ML20003H741 | 24 April 1981 | Affidavit That Contents of Citizens Association for Sound Energy Answers to NRC Second Set of Interrogatories & Request for Production of Documents Are True.Related Correspondence | |
ML20023C040 | 5 May 1983 | Affidavit of Js Marshall in Response to ASLB Inquiry Re Classification of Equipment for Application of 10CFR50,App B Requirements & Relationship of Board Notification 83-13 to HR Denton 811120 Memo on Classification | |
ML20023C041 | 5 May 1983 | Affidavit of Dh Wade Re Midland-Ross Superstrut Matl (Board Notifications 83-02 & 83-14) & Welds in Main Control Board Panels (Board Notifications 82-90,90A & 116) | |
ML20023C042 | 5 May 1983 | Affidavit of Jc Finneran on Applicant Response to Board Notification 82-105 Re Pipe Clamps Employed on ASME Code Class I Piping | |
ML20023C043 | 5 May 1983 | Affidavit of Dr Woodlan Providing Responses to ASLB Inquiries Re Board Notifications 83-26 & 83-38 Concerning Failure of Certain Reactor Trip Breakers to Perform as Designed.Prof Qualifications Encl | |
ML20024A108 | 8 June 1983 | Affidavit of J Doyle Re Need to Reopen Record on Steam Generator Upper Lateral Restraint Issue | |
ML20024D104 | 25 July 1983 | Affidavit of H Stiner & D Stiner Re Weave & Downhill Welding | Stolen |
ML20024E415 | 31 March 1983 | Affidavit of a Dillingham Re Instances & Examples of Violations at Plant & Mgt Response to Reporting of Violations.Affiant Laid Off as Part of Reduction in Force While Dept Increased | Earthquake |
ML20024E416 | 27 June 1983 | Affidavit of a Dillingham Re Personal Knowledge of Improper Welding of Stainless Steel Liners,Improper Installation of CCW Surge Tanks & Improper Bolting of Upper Lateral Restraint | |
ML20024E418 | 29 June 1983 | Affidavit of D Culton Re Limited Appearance Statement at Sept 1982 OL Hearing | |
ML20024E419 | 27 June 1983 | Affidavit of Lv Witt Re IE Investigation Repts 50-445/83-03 & 50-446/83-01 | Hydrostatic |
ML20028E886 | 23 January 1983 | Affidavit of L Smith Re Working Conditions & Procedures at Plant.Requests Protection for Self & son-in-law | |
ML20038C055 | 20 November 1981 | Affidavit of EA Nye Re Contention 25 on Financial Qualifications.Applicants Have Reasonable Plan to Finance Operation & Decommissioning of Plant.Certificate of Svc Encl | |
ML20040C966 | 15 January 1982 | Affidavit of CM Jan Re Contention 2 on Verification & Acceptance of Computer Codes.Certain Computer Codes Specified in Facility FSAR Use Accepted Engineering Mathematical Techniques.Codes Have Been Properly Verified | Earthquake |
ML20040C972 | 19 January 1982 | Affidavit of AC Spencer Re Contention 2 on Computer Codes. Codes Used in Facility FSAR to Analyze Safety Features of NSSS Have Been Verified by Appropriate Means to Assure Validity.Prof Qualifications Encl | |
ML20040C985 | 19 January 1982 | Affidavit of WR Spezialetti Re Contention 2 on Verification & Acceptance of Computer Codes.Discusses Topical Repts Relevant to Contention 2.Prof Qualifications Encl | |
ML20040C992 | 22 January 1982 | Affidavit of Ch Gatchell Re Contention 7 on Rock Overbreak. No Loose Rack or Other Foreign Matl Thrown Into Site Before Concrete Placements Began for Foundations of Seismic Category I Structures.Prof Qualifications Encl | |
ML20040C996 | 19 January 1982 | Affidavit of Rc Mason Re Contention 7 on Rock Overbreak. Shattered Rock for Lateral Distance Extending 20 Ft Beyond Perimeter of Containment Bldg Excavation & to Depth of 5 to 6 Ft & Beneath Fuel Bldg Removed | |
ML20040C999 | 15 January 1982 | Affidavit of Re Mcgrane Re Contention 7 on Rock Overbreak. Performance of Foundations for Seismic Category I Structures During Seismic Event Would Not Be Different If Rock Overbreak Had Not Occurred When Concrete Backfill Placed | |
ML20040D001 | 25 January 1982 | Affidavit of Jt Merritt Re Contention 7 on Rock Overbreak. Excavation Rock Wall Fissures Were Pressure Grouted Using Approved Procedures.Repairs Documented.Prof Qualifications Encl | |
ML20040D002 | 26 January 1982 | Affidavit of PM Milam Re Contention 7 on Rock Overbreak.All Concrete Placements for Foundation to Seismic Category I Structures Done Per Specs & Procedures.Statements of Matl Fact,Prof Qualifications & Certificate of Svc Encl | Scaffolding |
ML20041F768 | 10 March 1982 | Original Affidavit of FF Cadek Re Status of Westinghouse Owners Group Response to TMI Items I.C.1 & II.K.3.30. Guidelines & Procedures Proposed in Responses to Item I.C.1 Will Improve Operator Ability to Respond to Transients | Probabilistic Risk Assessment Affidavit |