Issue date | Title | Topic | |
---|---|---|---|
05000369/LER-2016-001 | 23 May 2016 | 1 OF 4 LER 16-001-00 for McGuire Nuclear Station, Unit 1 Regarding Degraded Condition Due to Rejectable Flaw on U1 Charging Line | Time of Discovery |
IR 05000039/2009006 | 27 July 2009 | IR 0500039-09-006 & 05000370-09-006 on 05/18/09 - 06/16/09 for William B. McGuire, Units 1 & 2, Component Design Bases Inspection | Ultimate heat sink Stroke time Probabilistic Risk Assessment Significance Determination Process Design basis earthquake Time Critical Operator Action Battery sizing |
IR 05000369/2002006 | 9 September 2002 | IR 05000369-02-006, IR 05000370-02-006, IR 05000413-02-006 and IR 05000414-02-006, on 07/26/02 for McGuire and Catawba Nuclear Stations | Aging Management License Renewal |
IR 05000369/2002007 | 25 September 2002 | IR 05000369-02-007 and IR 05000370-02-007, on 08/29/02 for McGuire Nuclear Station, Units 1 and 2, Duke Energy Corporation. Biennial Baseline Inspection of the Identification and Resolution of Problems | Condition Adverse to Quality Time Critical Operator Action Siren |
IR 05000369/2003004 | 7 October 2003 | IR 05000369-03-004 & IR 05000370-03-004, on 06/22/2003 - 09/13/2003, McGuire Nuclear Station, Units 1 & 2. Maintenance Effectiveness | Fire Barrier Significance Determination Process Operability Determination Severe Accident Management Guideline |
IR 05000369/2003005 | 12 April 2004 | IR 05000369-03-005 and 05000370-04-003, on 03/13/2004, Duke Energy Corporation, Huntersville, Nc | Hot Short Safe Shutdown Boric Acid Fire Barrier Stroke time Time to boil Nondestructive Examination Operator Manual Action VT-2 Significance Determination Process Operability Determination Pressure Boundary Leakage Fire Protection Program Power change |
IR 05000369/2003006 | 15 September 2003 | IR 05000369-03-006 and IR 05000370-03-006 on 08/04-07/03, McGuire Nuclear Plant, Units 1 and 2. One Unresolved Item Was Identified | |
IR 05000369/2003007 | 22 December 2003 | Undated Draft IR 05000369-03-007 and IR 05000370-03-007 on 05/05-09 and 19-23/2003. Violations Noted | Hot Short Safe Shutdown Unanalyzed Condition Fire Barrier Hydrostatic Emergency Lighting Significance Determination Process Fire Protection Program Fire Watch Backfit |
IR 05000369/2003302 | 10 November 2003 | NRC Examination Report 05000369/2003-302 and 05000370/2003-302 | |
IR 05000369/2004002 | 11 March 2004 | IR 05000369-04-002 & IR 05000370-04-002, on January 26-30 & February 9-13, 2004, McGuire Units 1 & 2. Safety System Design and Performance Capability Inspection | Loop seal Stroke time Significance Determination Process Job Performance Measure Foreign Material Exclusion Battery sizing |
IR 05000369/2004004 | 9 July 2004 | IR 05000369-04-004 & 05000370-04-004, on 03/14/04 Through 06/12/04, for McGuire Nuclear Station Units 1 & 3; Fire Protection, Maintenance Effectiveness, Surveillance Testing, Access Control to Radiologically Significant Area & ALARA Plannin | Safe Shutdown High Radiation Area Fire Barrier Coatings Nondestructive Examination Temporary Modification VT-2 Emergency Lighting Significance Determination Process Job Performance Measure Foreign Material Exclusion Process Control Program Operability Determination Maintenance Rule Program Liquid penetrant Through Wall Leak Fire Protection Program |
IR 05000369/2004006 | 13 January 2005 | IR 05000369-04-006, IR 05000370-04-006; 09/12/2004 - 12/31/2004; McGuire Nuclear Station, Units 1 and 2; Quarterly Integrated Inspection Report | Safe Shutdown Ultimate heat sink Fire Barrier Internal Flooding Temporary Modification Emergency Lighting Significance Determination Process Operability Determination Maintenance Rule Program |
IR 05000369/2004008 | 3 December 2004 | IR 05000369/04-08, IR 05000370/04-08 on 10/18/2004 - 11/5/2004 for McGuire Nuclear Station, Units 1 & 2; Prioritization and Evaluation of Issues, Effectiveness of Corrective Actions | Boric Acid Stroke time Emergency Lighting Condition Adverse to Quality Significance Determination Process Power change Operability Assessment |
IR 05000369/2005002 | 28 April 2005 | IR 05000369-05-002, IR 05000370-05-002, and IR 07200038-05-001, on 01/01/2005 - 03/31/2005 for McGuire, Units 1 and 2; Operability Evaluations, Surveillance Testing, Access Controls to Radiologically Significant Areas, Radiation Monitoring. | Boric Acid High Radiation Area Non-Destructive Examination Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Nondestructive Examination Temporary Modification VT-2 Significance Determination Process Annual Radioactive Effluent Release Report Large early release frequency Operability Determination Liquid penetrant Pressure Boundary Leakage Through Wall Leak Fire Protection Program Downpower Flow Induced Vibration Operability Assessment Unidentified leakage Overexposure |
IR 05000369/2005003 | 22 July 2005 | IR 05000369-05-03 and IR 05000370-05-03, on 04/01/2005 - 06/30/2005, McGuire Nuclear Station, Units 1 and 2; Fire Protection and Other Activities | Safe Shutdown Fire Barrier Stroke time Commercial Grade Dedication Internal Flooding Temporary Modification Significance Determination Process Large early release frequency Operability Determination Maintenance Rule Program Fire Protection Program Operability Assessment |
IR 05000369/2005004 | 28 October 2005 | IR 05000369-05-004, IR 05000370-05-004, IR 07200038-05-002; 07/01/2005 - 09/30/2005; McGuire Nuclear Station, Units 1 and 2; Identification and Resolution of Problems | Safe Shutdown Boric Acid Non-Destructive Examination Fire Barrier Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Temporary Modification Significance Determination Process Large early release frequency Operability Determination Liquid penetrant Fire Protection Program Siren |
IR 05000369/2005005 | 26 January 2006 | IR 05000369-05-005, IR 05000370-05-005; 10/1/2005 - 12/31/2005; McGuire Nuclear Station, Units 1 and 2; Routine Integrated Report | Packing leak Fire Barrier Stroke time Internal Flooding Enforcement Discretion Temporary Modification Hemyc Maintenance Rule Program Offsite Circuit Fire Protection Program Hourly Fire Watch Downpower |
IR 05000369/2005301 | 21 March 2005 | NRC Examination Report 05000369-05-301 and 05000370-05-301 | Job Performance Measure Earthquake |
IR 05000369/2006002 | 28 April 2006 | IR 05000369-06-002, IR 05000370-06-002 on 01/01/2006 - 03/31/2006 for McGuire Nuclear Station, Units 1 and 2; Fire Protection and Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems | Safe Shutdown Fire Barrier Temporary Modification Significance Determination Process Operability Determination Fire Protection Program Power change Downpower Weak link |
IR 05000369/2006003 | 27 July 2006 | IR 05000369-06-003, 05000370-06-003, on 04/01/2006 - 06/30/2006, McGuire | Safe Shutdown Fire Barrier Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Maintenance Rule Program Fire Protection Program |
IR 05000369/2006004 | 30 October 2006 | IR 05000369-06-004, IR 05000370-06-004, on 07/01/2006 - 09/30/2006 for McGuire, Units 1 and 2, Maintenance Effectiveness, Operability Evaluations, Other Activities | Safe Shutdown Fire Barrier Significance Determination Process Operability Determination Power-Operated Valves Fire Protection Program Downpower |
IR 05000369/2006005 | 30 January 2007 | IR 05000369-06-005, IR 05000370-06-005, 072000038-06-002: 10/01/06 - 12/31/06, McGuire Nuclear Station, Units 1 and 2; Inservice Inspection Activities, Operability Evaluations, Surveillance Testing, and Radioactive Material Processing and T | Boric Acid High Radiation Area Non-Destructive Examination Grab sample Fire Barrier Stroke time Weld Overlay Internal Flooding Hydrostatic Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Aging Management Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Operability Determination Maintenance Rule Program Liquid penetrant Fire Protection Program |
IR 05000369/2006006 | 1 June 2006 | IR 05000369-06-006, 05000370-06-006, April 20, 2006, McGuire Nuclear Station, NRC Security Baseline Inspection Report | Fitness for Duty Affidavit |
IR 05000369/2006007 | 22 June 2006 | IR 05000369-06-007 and 05000370-06-07; Duke Energy Corporation; on 03/20/2006 Through 05/19/2006; McGuire Nuclear Station, Units 1 & 2 | Safe Shutdown Ultimate heat sink Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Design basis earthquake Foreign Material Exclusion Time Critical Operator Action Operability Assessment |
IR 05000369/2006008 | 29 January 2007 | IR 05000369-06-008 and 05000370-06-008, on 12/14/06, McGuire Nuclear Station, NRC Triennial Fire Protection and Exercise of Enforcement Discretion | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Operator Manual Action Emergency Lighting Significance Determination Process Fire Protection Program Fire Watch |
IR 05000369/2006009 | 13 November 2006 | IR 05000369-06-009, 05000370-06-009; on 10/23/2006 - 10/27/2006; McGuire Nuclear Station; Emergency Preparedness Baseline Inspection | Siren |
IR 05000369/2007002 | 26 April 2007 | IR 05000369-07-002, IR 05000370-07-002, on 01/01/07 - 03/31/07: McGuire Nuclear Station, Units 1 & 2; Routine Integrated Report | Boric Acid Non-Destructive Examination Fire Barrier Weld Overlay VT-2 Operability Determination Liquid penetrant Fire Protection Program Weak link |
IR 05000369/2007003 | 24 July 2007 | IR 05000369-07-003, 05000370-07-003, on 04/01/2007 - 06/30/2007; McGuire Nuclear Station, Units 1 and 2; Routine Integrated Report | Shutdown Margin Ultimate heat sink Fire Barrier Post Accident Monitoring Temporary Modification Zebra Mussel Foreign Material Exclusion Operability Determination Maintenance Rule Program Control of Heavy Loads Biofouling Fire Protection Program Power change Weak link |
IR 05000369/2007004 | 22 October 2007 | IR 05000369-07-004 & 05000370-07-004; Duke Energy Corporation; 07/01/2007 Through 09/30/2007; McGuire Nuclear Station, Unit 1 and 2 Integrated Inspection Report | Non-Destructive Examination Fire Barrier Internal Flooding Hydrostatic Temporary Modification Condition Adverse to Quality Significance Determination Process Design basis earthquake Operability Determination Earthquake Fire Protection Program |
IR 05000369/2007005 | 31 January 2008 | IR 05000369-07-005, 05000370-07-005 on 10/01/2007 - 12/31/2007 for McGuire, Units 1 and 2, Surveillance Testing and Other Activities | High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Hydrostatic Enforcement Discretion Temporary Modification Condition Adverse to Quality Significance Determination Process Large early release frequency Operability Determination Hemyc Maintenance Rule Program Fire Protection Program Overexposure |
IR 05000369/2007006 | 8 March 2007 | IR 05000369-07-006, IR 05000370-07-006; 01/22/2007 - 02/09/2007; McGuire Nuclear Station, Units 1 and 2; Identification and Resolution of Problems. a Violation Was Identified in the Area of Adequacy of Corrective Actions | Significance Determination Process Earthquake Operability Assessment |
IR 05000369/2007008 | 4 October 2007 | Notice of Regulatory Conference with Duke Energy Corporation to Discuss the Risk Significance of the Inspection Finding Documented in Inspection Report 05000369, 370/2007008 | |
IR 05000369/2007009 | 9 October 2007 | IR 05000369-07-009 and 05000370-07-009, on 09/11/07-09/18/07; McGuire Nuclear Station, Units 1 and 2; Special Inspection | Past operability Significance Determination Process |
IR 05000369/2007301 | 25 April 2007 | Er 05000369-07-301 and 05000370-07-301 on March 19-22, 2007, McGuire Units 1 & 2 | |
IR 05000369/2007302 | 26 July 2007 | Er 05000369-07-302, 05000370-07-302: 06/28/07 McGuire Nuclear Station; Licensed Operator Examination | |
IR 05000369/2007402 | 17 October 2007 | IR 05000369-07-402 & 05000370-07-402, on 09/21/2007, McGuire Nuclear Station - NRC Physical Security Baseline Inspection Report - Cover Letter | Affidavit |
IR 05000369/2007403 | 28 January 2008 | IR 05000369-07-403 and IR 05000370-07-403, on 12/13 - 14/2007, 01/09/2008, McGuire Nuclear Station, NRC Physical Security Baseline Inspection | Significance Determination Process Affidavit |
IR 05000369/2007501 | 26 October 2007 | IR 05000369-07-501, 05000370-07-501, on 10/15 - 18/2007, McGuire Nuclear Station, Units 1 and 2; Baseline Inspection | |
IR 05000369/2008001 | 20 August 2008 | IR 05000369-08-001, and IR 05000370-08-008, for McGuire Nuclear Station, Preliminary Great than Green Finding | |
IR 05000369/2008002 | 24 April 2008 | IR 05000369-08-002, IR05000370-08-002, 01/01/2008 - 03/31/2008, McGuire Nuclear Station, Units 1 and 2, Licensed Operator Requalification, Maintenance Effectiveness, Other | Boric Acid High Radiation Area Ultimate heat sink Non-Destructive Examination Fire Barrier Weld Overlay Enforcement Discretion Nondestructive Examination Locked High Radiation Area Significance Determination Process Annual Radioactive Effluent Release Report Foreign Material Exclusion Process Control Program Operability Determination Liquid penetrant Fire Protection Program Dissimilar Metal Weld |
IR 05000369/2008003 | 24 July 2008 | IR 05000369-08-003, IR 05000370-08-003; on 4/1/2008 - 6/30/2008; McGuire Nuclear Station, Licensed Operator Requalification, Maintenance Effectiveness, and Surveillance Testing | Fire Barrier Stroke time Internal Flooding Temporary Modification Significance Determination Process Job Performance Measure Foreign Material Exclusion Fire Protection Program Power change |
IR 05000369/2008004 | 27 October 2008 | IR 05000369-08-004 and 05000370-08-004, on 07/01/2008 - 09/30/2008, William B. McGuire Nuclear Station, Units 1 and 2; Quarterly Integrated Inspection Report | High winds Fire Barrier Weld Overlay Hydrostatic Aging Management Tornado Missile Protection Liquid penetrant Fire Protection Program Dissimilar Metal Weld Unidentified leakage |
IR 05000369/2008005 | 29 January 2009 | IR 05000369-08-005, IR 05000370-08-005, IR 05000369-08-501, IR 05000370-08-501, on 9/1/2008 - 12/31/2008, McGuire Nuclear Station, Units 1 and 2, Maintenance Risk Assessments and Emergent Work Evaluation, Other | Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Time to boil Enforcement Discretion Temporary Modification Locked High Radiation Area Significance Determination Process Job Performance Measure Hemyc Liquid penetrant Fire Protection Program Siren |
IR 05000369/2008006 | 29 September 2008 | IR 05000369-08-006 and 05000370-08-006 on 08/11/08 - 08/14/08 and 08/25/08 - 28/08 for McGuire, Units 1 & 2 | Unanalyzed Condition Fitness for Duty |
IR 05000369/2008008 | 3 September 2008 | Meeting Notice, Public Meeting Category 1 Regulatory Conference to Discuss the Risk Significance of the Inspection Finding for McGuire Documented in Inspection Report 05000369-08-008, 05000370-08-008 | Probabilistic Risk Assessment |
IR 05000369/2008009 | 25 November 2008 | Reply to Notice of Violation EA-08-220 (NRC Inspection Report Nos. 05000369-2008-009 and 05000370-2008-009) | Operating Basis Earthquake Condition Adverse to Quality |
IR 05000369/2008401 | 8 April 2008 | IR 05000369-08-401 and 05000370-08-401; on 3/10/08 - 3/14/08; McGuire Nuclear Station, Units 1 and 2; Security Baseline Report | Affidavit |
IR 05000369/2008402 | 4 December 2008 | William B. Mcguire - Letter NRC Security Inspection Report 05000369/2008402 and 05000370/2008402 - SGI Removed | Affidavit |
IR 05000369/2009002 | 23 April 2009 | IR 05000369-09-002, IR 05000370-09-002, IR 07200038-09-001; 1/1/2009 - 3/31/2009; McGuire Nuclear Station, Units 1 and 2; Licensed Operator Requalification, Other | Ultimate heat sink Fire Barrier Temporary Modification Condition Adverse to Quality Significance Determination Process Fire Protection Program |
IR 05000369/2009003 | 30 July 2009 | IR 05000369-09-003, 05000370-09-003 on 04/01/2009 - 06/30/2009 for McGuire, Units 1 & 2, Integrated Inspection | Safe Shutdown Ultimate heat sink Fire Barrier Temporary Modification Zebra Mussel Significance Determination Process Operability Determination Open House Biofouling Fire Protection Program Power change |