Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000369/LER-2016-00123 May 20161 OF 4
LER 16-001-00 for McGuire Nuclear Station, Unit 1 Regarding Degraded Condition Due to Rejectable Flaw on U1 Charging Line
Time of Discovery
IR 05000039/200900627 July 2009IR 0500039-09-006 & 05000370-09-006 on 05/18/09 - 06/16/09 for William B. McGuire, Units 1 & 2, Component Design Bases InspectionUltimate heat sink
Stroke time
Probabilistic Risk Assessment
Significance Determination Process
Design basis earthquake
Time Critical Operator Action
Battery sizing
IR 05000369/20020069 September 2002IR 05000369-02-006, IR 05000370-02-006, IR 05000413-02-006 and IR 05000414-02-006, on 07/26/02 for McGuire and Catawba Nuclear StationsAging Management
License Renewal
IR 05000369/200200725 September 2002IR 05000369-02-007 and IR 05000370-02-007, on 08/29/02 for McGuire Nuclear Station, Units 1 and 2, Duke Energy Corporation. Biennial Baseline Inspection of the Identification and Resolution of ProblemsCondition Adverse to Quality
Time Critical Operator Action
Siren
IR 05000369/20030047 October 2003IR 05000369-03-004 & IR 05000370-03-004, on 06/22/2003 - 09/13/2003, McGuire Nuclear Station, Units 1 & 2. Maintenance EffectivenessFire Barrier
Significance Determination Process
Operability Determination
Severe Accident Management Guideline
IR 05000369/200300512 April 2004IR 05000369-03-005 and 05000370-04-003, on 03/13/2004, Duke Energy Corporation, Huntersville, NcHot Short
Safe Shutdown
Boric Acid
Fire Barrier
Stroke time
Time to boil
Nondestructive Examination
Operator Manual Action
VT-2
Significance Determination Process
Operability Determination
Pressure Boundary Leakage
Fire Protection Program
Power change
IR 05000369/200300615 September 2003IR 05000369-03-006 and IR 05000370-03-006 on 08/04-07/03, McGuire Nuclear Plant, Units 1 and 2. One Unresolved Item Was Identified
IR 05000369/200300722 December 2003Undated Draft IR 05000369-03-007 and IR 05000370-03-007 on 05/05-09 and 19-23/2003. Violations NotedHot Short
Safe Shutdown
Unanalyzed Condition
Fire Barrier
Hydrostatic
Emergency Lighting
Significance Determination Process
Fire Protection Program
Fire Watch
Backfit
IR 05000369/200330210 November 2003NRC Examination Report 05000369/2003-302 and 05000370/2003-302
IR 05000369/200400211 March 2004IR 05000369-04-002 & IR 05000370-04-002, on January 26-30 & February 9-13, 2004, McGuire Units 1 & 2. Safety System Design and Performance Capability InspectionLoop seal
Stroke time
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Battery sizing
IR 05000369/20040049 July 2004IR 05000369-04-004 & 05000370-04-004, on 03/14/04 Through 06/12/04, for McGuire Nuclear Station Units 1 & 3; Fire Protection, Maintenance Effectiveness, Surveillance Testing, Access Control to Radiologically Significant Area & ALARA PlanninSafe Shutdown
High Radiation Area
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Emergency Lighting
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Process Control Program
Operability Determination
Maintenance Rule Program
Liquid penetrant
Through Wall Leak
Fire Protection Program
IR 05000369/200400613 January 2005IR 05000369-04-006, IR 05000370-04-006; 09/12/2004 - 12/31/2004; McGuire Nuclear Station, Units 1 and 2; Quarterly Integrated Inspection ReportSafe Shutdown
Ultimate heat sink
Fire Barrier
Internal Flooding
Temporary Modification
Emergency Lighting
Significance Determination Process
Operability Determination
Maintenance Rule Program
IR 05000369/20040083 December 2004IR 05000369/04-08, IR 05000370/04-08 on 10/18/2004 - 11/5/2004 for McGuire Nuclear Station, Units 1 & 2; Prioritization and Evaluation of Issues, Effectiveness of Corrective ActionsBoric Acid
Stroke time
Emergency Lighting
Condition Adverse to Quality
Significance Determination Process
Power change
Operability Assessment
IR 05000369/200500228 April 2005IR 05000369-05-002, IR 05000370-05-002, and IR 07200038-05-001, on 01/01/2005 - 03/31/2005 for McGuire, Units 1 and 2; Operability Evaluations, Surveillance Testing, Access Controls to Radiologically Significant Areas, Radiation Monitoring.Boric Acid
High Radiation Area
Non-Destructive Examination
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Nondestructive Examination
Temporary Modification
VT-2
Significance Determination Process
Annual Radioactive Effluent Release Report
Large early release frequency
Operability Determination
Liquid penetrant
Pressure Boundary Leakage
Through Wall Leak
Fire Protection Program
Downpower
Flow Induced Vibration
Operability Assessment
Unidentified leakage
Overexposure
IR 05000369/200500322 July 2005IR 05000369-05-03 and IR 05000370-05-03, on 04/01/2005 - 06/30/2005, McGuire Nuclear Station, Units 1 and 2; Fire Protection and Other ActivitiesSafe Shutdown
Fire Barrier
Stroke time
Commercial Grade Dedication
Internal Flooding
Temporary Modification
Significance Determination Process
Large early release frequency
Operability Determination
Maintenance Rule Program
Fire Protection Program
Operability Assessment
IR 05000369/200500428 October 2005IR 05000369-05-004, IR 05000370-05-004, IR 07200038-05-002; 07/01/2005 - 09/30/2005; McGuire Nuclear Station, Units 1 and 2; Identification and Resolution of ProblemsSafe Shutdown
Boric Acid
Non-Destructive Examination
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Nondestructive Examination
Temporary Modification
Significance Determination Process
Large early release frequency
Operability Determination
Liquid penetrant
Fire Protection Program
Siren
IR 05000369/200500526 January 2006IR 05000369-05-005, IR 05000370-05-005; 10/1/2005 - 12/31/2005; McGuire Nuclear Station, Units 1 and 2; Routine Integrated ReportPacking leak
Fire Barrier
Stroke time
Internal Flooding
Enforcement Discretion
Temporary Modification
Hemyc
Maintenance Rule Program
Offsite Circuit
Fire Protection Program
Hourly Fire Watch
Downpower
IR 05000369/200530121 March 2005NRC Examination Report 05000369-05-301 and 05000370-05-301Job Performance Measure
Earthquake
IR 05000369/200600228 April 2006IR 05000369-06-002, IR 05000370-06-002 on 01/01/2006 - 03/31/2006 for McGuire Nuclear Station, Units 1 and 2; Fire Protection and Radioactive Gaseous and Liquid Effluent Treatment and Monitoring SystemsSafe Shutdown
Fire Barrier
Temporary Modification
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
Downpower
Weak link
IR 05000369/200600327 July 2006IR 05000369-06-003, 05000370-06-003, on 04/01/2006 - 06/30/2006, McGuireSafe Shutdown
Fire Barrier
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Fire Protection Program
IR 05000369/200600430 October 2006IR 05000369-06-004, IR 05000370-06-004, on 07/01/2006 - 09/30/2006 for McGuire, Units 1 and 2, Maintenance Effectiveness, Operability Evaluations, Other ActivitiesSafe Shutdown
Fire Barrier
Significance Determination Process
Operability Determination
Power-Operated Valves
Fire Protection Program
Downpower
IR 05000369/200600530 January 2007IR 05000369-06-005, IR 05000370-06-005, 072000038-06-002: 10/01/06 - 12/31/06, McGuire Nuclear Station, Units 1 and 2; Inservice Inspection Activities, Operability Evaluations, Surveillance Testing, and Radioactive Material Processing and TBoric Acid
High Radiation Area
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Weld Overlay
Internal Flooding
Hydrostatic
Enforcement Discretion
Nondestructive Examination
Temporary Modification
VT-2
Aging Management
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
IR 05000369/20060061 June 2006IR 05000369-06-006, 05000370-06-006, April 20, 2006, McGuire Nuclear Station, NRC Security Baseline Inspection ReportFitness for Duty
Affidavit
IR 05000369/200600722 June 2006IR 05000369-06-007 and 05000370-06-07; Duke Energy Corporation; on 03/20/2006 Through 05/19/2006; McGuire Nuclear Station, Units 1 & 2Safe Shutdown
Ultimate heat sink
Probabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Design basis earthquake
Foreign Material Exclusion
Time Critical Operator Action
Operability Assessment
IR 05000369/200600829 January 2007IR 05000369-06-008 and 05000370-06-008, on 12/14/06, McGuire Nuclear Station, NRC Triennial Fire Protection and Exercise of Enforcement DiscretionHot Short
Safe Shutdown
Fire Barrier
Enforcement Discretion
Operator Manual Action
Emergency Lighting
Significance Determination Process
Fire Protection Program
Fire Watch
IR 05000369/200600913 November 2006IR 05000369-06-009, 05000370-06-009; on 10/23/2006 - 10/27/2006; McGuire Nuclear Station; Emergency Preparedness Baseline InspectionSiren
IR 05000369/200700226 April 2007IR 05000369-07-002, IR 05000370-07-002, on 01/01/07 - 03/31/07: McGuire Nuclear Station, Units 1 & 2; Routine Integrated ReportBoric Acid
Non-Destructive Examination
Fire Barrier
Weld Overlay
VT-2
Operability Determination
Liquid penetrant
Fire Protection Program
Weak link
IR 05000369/200700324 July 2007IR 05000369-07-003, 05000370-07-003, on 04/01/2007 - 06/30/2007; McGuire Nuclear Station, Units 1 and 2; Routine Integrated ReportShutdown Margin
Ultimate heat sink
Fire Barrier
Post Accident Monitoring
Temporary Modification
Zebra Mussel
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Control of Heavy Loads
Biofouling
Fire Protection Program
Power change
Weak link
IR 05000369/200700422 October 2007IR 05000369-07-004 & 05000370-07-004; Duke Energy Corporation; 07/01/2007 Through 09/30/2007; McGuire Nuclear Station, Unit 1 and 2 Integrated Inspection ReportNon-Destructive Examination
Fire Barrier
Internal Flooding
Hydrostatic
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Design basis earthquake
Operability Determination
Earthquake
Fire Protection Program
IR 05000369/200700531 January 2008IR 05000369-07-005, 05000370-07-005 on 10/01/2007 - 12/31/2007 for McGuire, Units 1 and 2, Surveillance Testing and Other ActivitiesHigh Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Enforcement Discretion
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Operability Determination
Hemyc
Maintenance Rule Program
Fire Protection Program
Overexposure
IR 05000369/20070068 March 2007IR 05000369-07-006, IR 05000370-07-006; 01/22/2007 - 02/09/2007; McGuire Nuclear Station, Units 1 and 2; Identification and Resolution of Problems. a Violation Was Identified in the Area of Adequacy of Corrective ActionsSignificance Determination Process
Earthquake
Operability Assessment
IR 05000369/20070084 October 2007Notice of Regulatory Conference with Duke Energy Corporation to Discuss the Risk Significance of the Inspection Finding Documented in Inspection Report 05000369, 370/2007008
IR 05000369/20070099 October 2007IR 05000369-07-009 and 05000370-07-009, on 09/11/07-09/18/07; McGuire Nuclear Station, Units 1 and 2; Special InspectionPast operability
Significance Determination Process
IR 05000369/200730125 April 2007Er 05000369-07-301 and 05000370-07-301 on March 19-22, 2007, McGuire Units 1 & 2
IR 05000369/200730226 July 2007Er 05000369-07-302, 05000370-07-302: 06/28/07 McGuire Nuclear Station; Licensed Operator Examination
IR 05000369/200740217 October 2007IR 05000369-07-402 & 05000370-07-402, on 09/21/2007, McGuire Nuclear Station - NRC Physical Security Baseline Inspection Report - Cover LetterAffidavit
IR 05000369/200740328 January 2008IR 05000369-07-403 and IR 05000370-07-403, on 12/13 - 14/2007, 01/09/2008, McGuire Nuclear Station, NRC Physical Security Baseline InspectionSignificance Determination Process
Affidavit
IR 05000369/200750126 October 2007IR 05000369-07-501, 05000370-07-501, on 10/15 - 18/2007, McGuire Nuclear Station, Units 1 and 2; Baseline Inspection
IR 05000369/200800120 August 2008IR 05000369-08-001, and IR 05000370-08-008, for McGuire Nuclear Station, Preliminary Great than Green Finding
IR 05000369/200800224 April 2008IR 05000369-08-002, IR05000370-08-002, 01/01/2008 - 03/31/2008, McGuire Nuclear Station, Units 1 and 2, Licensed Operator Requalification, Maintenance Effectiveness, OtherBoric Acid
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Weld Overlay
Enforcement Discretion
Nondestructive Examination
Locked High Radiation Area
Significance Determination Process
Annual Radioactive Effluent Release Report
Foreign Material Exclusion
Process Control Program
Operability Determination
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
IR 05000369/200800324 July 2008IR 05000369-08-003, IR 05000370-08-003; on 4/1/2008 - 6/30/2008; McGuire Nuclear Station, Licensed Operator Requalification, Maintenance Effectiveness, and Surveillance TestingFire Barrier
Stroke time
Internal Flooding
Temporary Modification
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Fire Protection Program
Power change
IR 05000369/200800427 October 2008IR 05000369-08-004 and 05000370-08-004, on 07/01/2008 - 09/30/2008, William B. McGuire Nuclear Station, Units 1 and 2; Quarterly Integrated Inspection ReportHigh winds
Fire Barrier
Weld Overlay
Hydrostatic
Aging Management
Tornado Missile Protection
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Unidentified leakage
IR 05000369/200800529 January 2009IR 05000369-08-005, IR 05000370-08-005, IR 05000369-08-501, IR 05000370-08-501, on 9/1/2008 - 12/31/2008, McGuire Nuclear Station, Units 1 and 2, Maintenance Risk Assessments and Emergent Work Evaluation, OtherBoric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Time to boil
Enforcement Discretion
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Hemyc
Liquid penetrant
Fire Protection Program
Siren
IR 05000369/200800629 September 2008IR 05000369-08-006 and 05000370-08-006 on 08/11/08 - 08/14/08 and 08/25/08 - 28/08 for McGuire, Units 1 & 2Unanalyzed Condition
Fitness for Duty
IR 05000369/20080083 September 2008Meeting Notice, Public Meeting Category 1 Regulatory Conference to Discuss the Risk Significance of the Inspection Finding for McGuire Documented in Inspection Report 05000369-08-008, 05000370-08-008Probabilistic Risk Assessment
IR 05000369/200800925 November 2008Reply to Notice of Violation EA-08-220 (NRC Inspection Report Nos. 05000369-2008-009 and 05000370-2008-009)Operating Basis Earthquake
Condition Adverse to Quality
IR 05000369/20084018 April 2008IR 05000369-08-401 and 05000370-08-401; on 3/10/08 - 3/14/08; McGuire Nuclear Station, Units 1 and 2; Security Baseline ReportAffidavit
IR 05000369/20084024 December 2008William B. Mcguire - Letter NRC Security Inspection Report 05000369/2008402 and 05000370/2008402 - SGI RemovedAffidavit
IR 05000369/200900223 April 2009IR 05000369-09-002, IR 05000370-09-002, IR 07200038-09-001; 1/1/2009 - 3/31/2009; McGuire Nuclear Station, Units 1 and 2; Licensed Operator Requalification, OtherUltimate heat sink
Fire Barrier
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Fire Protection Program
IR 05000369/200900330 July 2009IR 05000369-09-003, 05000370-09-003 on 04/01/2009 - 06/30/2009 for McGuire, Units 1 & 2, Integrated InspectionSafe Shutdown
Ultimate heat sink
Fire Barrier
Temporary Modification
Zebra Mussel
Significance Determination Process
Operability Determination
Open House
Biofouling
Fire Protection Program
Power change