IR 05000369/2008401
| ML081000049 | |
| Person / Time | |
|---|---|
| Site: | Mcguire, McGuire |
| Issue date: | 04/08/2008 |
| From: | Joel Munday NRC/RGN-II/DRS/PSB2 |
| To: | Brandi Hamilton Duke Energy Carolinas, Duke Power Co |
| References | |
| IR-08-401 | |
| Download: ML081000049 (5) | |
Text
April 8, 2008
SUBJECT:
WILLIAM B. MCGUIRE NUCLEAR STATION - NRC SECURITY
INSPECTION REPORT 05000369/2008401 AND 05000370/2008401
Dear Mr. Hamilton:
On March 14, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your William B. McGuire Nuclear Station, Units 1 and 2. Portions of the inspection were conducted at the corporate office from January 7 through 10, 2008. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. K. Ashe, Regulatory Compliance Manager, and other members of your staff on March 14, 2008.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. DPC 2 If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA James Shehee for/
Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety
Docket No.: 50-369, 50-370 License No.: NPF-9, NPF-17
Enclosure: Inspection Report 05000369/2008401 and 05000370/2008401
w/Attachment: Supplemental Information (OUO)
cc: See Page 3
DPC 3 cc w/encl:
Kenneth L. Ashe Regulatory Compliance Manager Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC MN01RC 12700 Hagers Ferry Road Huntersville, NC 28078-8985
R. L. Gill, Jr.
Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC 28201-0006
Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202
Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202
cc w/o encl:
David A. Repka Winston Strawn LLP 1400 L Street NW Washington, DC 20005
Beverly Hall Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721
Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602
_________________________
OFFICE RII:DRS RII:DRS RII:DRP RII:DRS
SIGNATURE
/RA/
/RA/
/RA J.Baptist for/ /RA J Shehee for/
NAME K.Davis J. Wallo J.Moorman J.Munday
DATE 4/22008 4/3/08 4/3/08 4/8/08
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO