Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20054M239 | 8 July 1982 | Forwards Adequacy of Station Electric Distribution Sys Voltages,Big Rock Point Plant, & Revised Safety Evaluation Re SEP Topic VIII-1.A | |
ML20055A296 | 13 July 1982 | Forwards Status Evaluation of Unresolved Safety Issues for SEP Integrated Assessment Program.Current Info Re Implementation of Hardware & Procedures Requested | |
ML20055B399 | 15 July 1982 | Clarifies NRC Position Re Procedures for Admitting NRC Personnel to Facility.Inspectors Listed on Encl 1 Require Permanent Nonemployee,No Escort Required Picture Badges. Personnel on Encl 2 to Be Treated as Nonregular Employees | |
ML20055B668 | 7 July 1982 | Forwards IE Insp Rept 50-155/82-08 on 820424-0611.No Noncompliance Noted | |
ML20055D179 | 28 June 1990 | Forwards Safety Insp Rept 50-155/90-11 on 900501-0611.No Violations Noted | |
ML20055D701 | 2 July 1990 | Confirms Plans Re 900716 Meeting W/Util in Charlevoix,Mi to Present Initial SALP 9 Rept for Plant | |
ML20055F166 | 6 July 1990 | Forwards Initial SALP Rept 50-155/90-01 for Jan 1989 - Apr 1990,prior to 900716 Scheduled Meeting.Two Areas of Improvement & No Areas of Decline Identified Since Last SALP Rept | |
ML20055G288 | 16 July 1990 | Advises of fitness-for-duty Insp Scheduled for Wk of 900925- 28 at Plant.Written Policies & Procedures Will Be Reviewed as Part of Insp Process | |
ML20055G505 | 11 July 1990 | Advises That 900511 Rev 95 to Chapters 2,5,6,7,8 & Apps D, M & P for Plant Emergency Plan Consistent w/10CFR50.54(q) & Acceptable.Position of on-call Technical Adviser Should Be Inserted in Table 1 of Chapter 5 | |
ML20055G730 | 20 July 1990 | Requests Util Provide Ref Matls Listed in Encl for Requalification Program Evaluation on 901018 & Wk of 901105 | |
ML20056A498 | 1 August 1990 | Forwards Master Bwr/Pwr Generic Fundamentals Exam Section W/Answer Key.W/O Encls | |
ML20056B519 | 17 August 1990 | Forwards Final SALP Rept 50-155/90-01 & Revised Pages to SALP Rept.Overall Performance Did Not Decline,Per 900716 Meeting.Nrc Overstated Concern W/Radiological Controls Functional Area in Initial Rept & Cover Ltr | |
ML20056E162 | 16 August 1993 | Forwards Amend 110 to License DPR-6 & Safety Evaluation. Amend Clarifies TS Re Undervoltage Breakers in RPS | |
ML20056E197 | 4 August 1993 | Forwards Corrected Superseding 930620 Document Re Response to GL 92-01,rev 1 | |
ML20056G110 | 16 August 1993 | Discusses Response to GL 87-02,Suppl 1 & Requests Addl Info Re licensing-basis Spectra.Nrc Agrees That in-structure Response Spectra Generated by Either of Two Acceptable Ground Response Spectra Acceptable | |
ML20057A082 | 31 August 1993 | Forwards Insp Rept 50-155/93-12 on 930809-13.No Violations Noted | |
ML20057A124 | 8 September 1993 | Forwards Insp Rept 50-155/93-10 on 930809-20 & Notice of Violation.Insp Involved Review of 930708 Event Re Two Containment High Pressure Sensors Outside Allowable TS Tolerances Due to Installation Error | |
ML20057A610 | 9 September 1993 | Informs That Revising Schedule for Submittal of IPE for Severe Accident Vulnerabilities,Acceptable | |
ML20057B053 | 9 September 1993 | Forwards Insp Rept 50-155/93-11 on 930716-0827.No Violation Noted | |
ML20057B257 | 14 September 1993 | Confirms Plans Discussed W/M Phillips Re Mgt Meeting on 931001 Re Plant Performance,Corrective Action Initiatives on Engineering,Operator Attention to Detail,Preventive Maint & Effectiveness of Initiatives | |
ML20057B600 | 16 September 1993 | Forwards Request for Addl Info Re 930122 Third 10-yr Interval Inservice Insp Plan & Requests for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements | |
ML20057D326 | 29 September 1993 | Notifies of Intent to Perform Maint,Engineering & Technical Support Team Insp of Plant During Wks of 940207 & 21. Pre-insp Site Visit Will Be Conducted During Wk of 940131 | |
ML20057E193 | 5 October 1993 | Forwards Amend 111 to License DPR-6 & Safety Evaluation. Amend Changes Reporting Requirements for Effluent Releases from Semiannual to Annual | |
ML20057E494 | 4 October 1993 | Forwards Insp Rept 50-155/93-16 on 930913-17.No Violations Noted | |
ML20057E691 | 7 October 1993 | Confirms Plans to Conduct Enforcement Conference in Glen Ellyn,Il on 931012 to Discuss Violations Re Loss of Control of Two Plant Evolutions at Facility | |
ML20057E753 | 5 October 1993 | Forwards Insp Rept 50-155/93-15 on 930824-0914.Seven Apparent Violations Noted & Being Considered for Escalated Enforcement Action | |
ML20058A144 | 15 November 1993 | Forwards Amend 112 to License DPR-6 & Safety Evaluation. Amend Changes TS to Implement Reorganization of Plant Staff | |
ML20058A355 | 15 November 1993 | Advises That 930614 Changes to QA Program Description Topical Rept Meet Requirements of 10CFR50,App B & Acceptable | |
ML20058A767 | 22 October 1990 | Advises That Review of 900816 Response to NRC Bulletin 90-001 Re Loss of Fill Oil in Rosemount Transmitter Ongoing | |
ML20058D353 | 22 November 1993 | Responds to to DW Riegle Re Gaseous & Liquid Effluent Comparisons for PWRs & BWRs from 1970 to 1989 | |
ML20058D620 | 20 July 1982 | Forwards Evaluation of SEP Topic, Station Svc & Cooling Water Sys. Design of Fire Protection Sys Acceptable Except for Procedure Verification & Potential Passive Single Failures | |
ML20058E658 | 1 December 1993 | Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 940209.Informs That Facility Must Submit Ltr Identifying Individuals Who Will Take Exam | |
ML20058E714 | 30 October 1990 | Forwards Exam Forms & Answer Keys,Grading Results & Individual Answer Sheets for Each Applicant | |
ML20058E900 | 26 July 1982 | Forwards re-evaluation Guideline Seismic Criteria for SEP Group II Plants Reflecting NRC Decision to Request Seismic Reanalysis for Only Sse,Per SEP Topic III-6, Seismic Design Considerations | |
ML20058F080 | 22 November 1993 | Advises That Responses to Bulletin 90-01,suppl 1, Loss of Fill-Oil in Transmitters Manufactured by Rosemount, Acceptable.Se & TER EGG-RTAP-10816 Encl |