ML20057E691

From kanterella
Jump to navigation Jump to search
Confirms Plans to Conduct Enforcement Conference in Glen Ellyn,Il on 931012 to Discuss Violations Re Loss of Control of Two Plant Evolutions at Facility
ML20057E691
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/07/1993
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Donnelly P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 9310130040
Download: ML20057E691 (1)


Text

l d

OCT 0 71993 uh Docket No. 50-155 l

Consumers Power Company ATTN:

P.M. Donnelly Plant Manager Big Rock Point Nuclear Plant 10269 US 31 North l

Charlevoix, MI 49720

)

l l

Dear Mr. Donnelly:

[

This confirms our plans as discussed between Mr. M. P. Phillips of this office l

and Mr. M. Bourassa of your office to conduct an Enforcement Conference at 10 a.m. (CDT) on October 12, 1993, at the Region 111 office, 799 Roosevelt Road, Glen Ellyn, Illinois.

This Enforcement Conference is to discuss the apparent violations pertaining l

to the loss of control of two plant evolutions at your Big Rock Point facility.

The events involved a loss of containment integrity with subsequent change in operational mode and an overpressurization of the primary system during the performance of the system pressure test.

At the Enforcement I

Conference you should be prepared to address the issues identified in Inspection Report No. 50-155/93015.

We appreciate your cooperation in this matter.

If you have any questions regarding this meeting, please contact Mr. Monte Phillips of my staff at (708) 790-5530.

Sincerely,

+ "

Edward G. Greenman, Director Division of Reactor Projects cc:

David P. Hoffman, Vice President Nuclear Operations OC/LFDCB Resident inspector, Rill James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health Big Rock Point, LPM, NRR SRI, Palisades L": "PW k

I 11 RI RIl P(A s

P i(lips nsen P

Greenm 9310130040 931007 M d/

PDR ADOCK 05000155 G

PDR

..