yUL 7
be2
Docket No. 50-155
Consumers Power Company
ATTN:
Mr. R. B. DeWitt
Vice President
Nuclear Operations
212 West Michigan Avenue
Jackson,.MI 49201
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
G. C. Wright and M. E. Parker of this office on April 24 through June 11, 1982,
of activities at the Big Rock Point Station authorized by NRC Operating License
No. DPR-06 and to the discussion of our findings with Mr. D. P. Hoffman at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so that
a new due date may be established. Consistent with Section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons which are the bases for the
$
go}
.
1
Consumers Power Company-
2
g;. 7
g2
claim that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the con-
siderations-listed in 10 CFR 2.790(b)(4). The information sought to be
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will'be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
$C
4
R. C. Knop,_ Chief
Projects Branch 1
Enclosure:
Inspection Report
No. 50-155/82-08(DPRP)
cc w/ enc 1:
D. J. VandeWalle, Nuclear
Licensing Administrator
C. J. Hartman, Plant
Superintendent
DMB/ Document Control Desk.(RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
-
ou
- V'
Boyd/sv
Kn p
7/6/82