Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TSTF-06-26, Submittal of TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441).3 November 2006Submittal of TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441).Safe Shutdown
Shutdown Margin
High Radiation Area
Ultimate heat sink
Grab sample
Anticipated operational occurrence
Offsite Circuit
TSTF-06-28, TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461).20 December 2006TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461).Packing leak
High Radiation Area
Large early release frequency
Pressure Boundary Leakage
Through-Wall Leak
TSTF-06-32, Request for Pre-Submittal Meeting on TSTF Traveler to Address Main Steam Isolation Valve Operability29 November 2006Request for Pre-Submittal Meeting on TSTF Traveler to Address Main Steam Isolation Valve Operability
TSTF-06-33, Withdrawal of TSTF-492, Revision 0, Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed.28 November 2006Withdrawal of TSTF-492, Revision 0, Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed.
TSTF-06-34, Request to Extend Acceptance Review Schedule for TSTF-493, Revision 1, Clarify Application of Setpoint Methodology for LSSS Functions.12 December 2006Request to Extend Acceptance Review Schedule for TSTF-493, Revision 1, Clarify Application of Setpoint Methodology for LSSS Functions.
TSTF-06-36, Request to Revise Response Schedule for TSTF-47620 December 2006Request to Revise Response Schedule for TSTF-476
TSTF-06-37, Corrected Pages for TSTF-448, Revision 3, Control Room Habitability.29 December 2006Corrected Pages for TSTF-448, Revision 3, Control Room Habitability.
TSTF-07-01, TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091)9 January 2007TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091)Shutdown Margin
TSTF-07-04, TSTF-446, Revision 2, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).11 January 2007TSTF-446, Revision 2, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).High Radiation Area
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Fuel cladding
TSTF-07-05, TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable.10 January 2007TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable.Power change
TSTF-07-06, Response to NRC Request for Additional Information Regarding TSTF-486, Revision 0, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011), Dated November 20, 2006 and Submittal of Revision 120 February 2007Response to NRC Request for Additional Information Regarding TSTF-486, Revision 0, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011), Dated November 20, 2006 and Submittal of Revision 1
TSTF-07-07, Response to NRC Request for Additional Information Regarding TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Dated November 9, 20067 February 2007Response to NRC Request for Additional Information Regarding TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Dated November 9, 2006Large early release frequency
Severe Accident Management Guideline
TSTF-07-08, Schedule for Submittal TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.8 February 2007Schedule for Submittal TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.
TSTF-07-09, TSTF-478, Revision 1, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control.21 February 2007TSTF-478, Revision 1, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control.Probabilistic Risk Assessment
Severe Accident Management Guideline
Backfit
TSTF-07-10, Changes to Technical Specifications Task Force Membership and Distribution List20 February 2007Changes to Technical Specifications Task Force Membership and Distribution List
TSTF-07-11, Revision to Implementation Guidance for TSTF-423, Technical Specifications End States, NEDC-32988-A.9 March 2007Revision to Implementation Guidance for TSTF-423, Technical Specifications End States, NEDC-32988-A.Safe Shutdown
TSTF-07-12, Submittal of TSTF-425, Revision 1, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5.20 April 2007Submittal of TSTF-425, Revision 1, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5.
TSTF-07-13, Response to NRC Request for Additional Information (RAI) Regarding TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03', Dated January 11, 20074 April 2007Response to NRC Request for Additional Information (RAI) Regarding TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03', Dated January 11, 2007Anticipated operational occurrence
TSTF-07-14, TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.16 April 2007TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.Safe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Incorporated by reference
Scram Discharge Volume
Fuel cladding
Backfit
Coast down
TSTF-07-15, TSTF-IG-07-01, Implementation Guidance TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441).10 April 2007TSTF-IG-07-01, Implementation Guidance TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441).Safe Shutdown
TSTF-07-17, TSTF-487, Revision 1, Relocate DNB Parameters to the Colr.4 May 2007TSTF-487, Revision 1, Relocate DNB Parameters to the Colr.Hydrostatic
Pressure and Temperature Limits Report
TSTF-07-18, TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011).10 May 2007TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011).
TSTF-07-19, Response to NRC Request for Additional Information (RAI) Regarding TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action, Dated February 28, 200722 May 2007Response to NRC Request for Additional Information (RAI) Regarding TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action, Dated February 28, 2007Shutdown Margin
Anticipated operational occurrence
Scram Discharge Volume
Overtravel
Earthquake
Grace period
TSTF-07-20, Request to Restart Review of TSTF-446, Revision 2, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).12 June 2007Request to Restart Review of TSTF-446, Revision 2, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).
TSTF-07-21, Response to NRC Request for Additional Information Regarding TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441), Dated May 3, 20079 July 2007Response to NRC Request for Additional Information Regarding TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441), Dated May 3, 2007Time to boil
TSTF-07-22, TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control.10 July 2007TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control.Severe Accident Management Guideline
TSTF-07-23, TSTF-501, Revision 0, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.20 July 2007TSTF-501, Revision 0, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.Safe Shutdown
Anticipated operational occurrence
TSTF-07-24, TSTF-431, Revision 2, Change in Technical Specifications End States (BAW-2441).13 July 2007TSTF-431, Revision 2, Change in Technical Specifications End States (BAW-2441).Safe Shutdown
Shutdown Margin
High Radiation Area
Ultimate heat sink
Grab sample
Anticipated operational occurrence
Offsite Circuit
TSTF-07-26, TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.31 August 2007TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.Safe Shutdown
Anticipated operational occurrence
Probabilistic Risk Assessment
Battery sizing
Recently irradiated fuel
TSTF-07-27, Response to NRC Request for Additional Information Regarding TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461), Dated June 13, 200710 October 2007Response to NRC Request for Additional Information Regarding TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461), Dated June 13, 2007High Radiation Area
Large early release frequency
TSTF-07-29, TSTF-07-29 Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461), Dated June 13, 200724 September 2007TSTF-07-29 Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461), Dated June 13, 2007
TSTF-07-31, Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 200731 October 2007Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 2007
TSTF-07-32, NRC Review Fee Billing for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.31 October 2007NRC Review Fee Billing for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.Exemption Request
TSTF-07-33, Errata Pages for TSTF-498, Rev 1, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461).2 December 2007Errata Pages for TSTF-498, Rev 1, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461).High Radiation Area
TSTF-07-35, Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Dated July 25, 200719 December 2007Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Dated July 25, 2007
TSTF-08-01, Response to NRC June 25, 2007 Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.18 January 2008Response to NRC June 25, 2007 Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.Safe Shutdown
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Scram Discharge Volume
Feedwater Controller Failure
Fuel cladding
Coast down
TSTF-08-02, Response to NRC December 13, 2007 Request for Additional Information Regarding TSTF-501, Revision 0, Relocate Store Fuel Oil and Lube Oil Volume Values to Licensee Control.6 March 2008Response to NRC December 13, 2007 Request for Additional Information Regarding TSTF-501, Revision 0, Relocate Store Fuel Oil and Lube Oil Volume Values to Licensee Control.
TSTF-08-03, March 6, 2008, Letter to Nrc/Cfo, from Technical Specifications Task Force, NRC Review Fee Billing for TSTF-501, Revision 0, Relocation Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.6 March 2008March 6, 2008, Letter to Nrc/Cfo, from Technical Specifications Task Force, NRC Review Fee Billing for TSTF-501, Revision 0, Relocation Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.
TSTF-08-04, TSTF-446, Revision 3, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).19 February 2008TSTF-446, Revision 3, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).High Radiation Area
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Fuel cladding
TSTF-08-05, TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners.4 March 2008TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners.Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Severe Accident Management Guideline
Earthquake
Fuel cladding
TSTF-08-07, Proposed Model Application for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.11 March 2008Proposed Model Application for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.Probabilistic Risk Assessment
Incorporated by reference
TSTF-08-08, TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation.3 July 2008TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation.Safe Shutdown
Recently irradiated fuel
TSTF-08-09, TSTF-509, Revision 0, Reformat the Conditions, Required Actions, and Surveillance for 3.2.4, Qpt.2 July 2008TSTF-509, Revision 0, Reformat the Conditions, Required Actions, and Surveillance for 3.2.4, Qpt.
TSTF-08-10, Transmittal of TSTF-507, Revision 0, CLIIP Traveler to Increase Standardization3 July 2008Transmittal of TSTF-507, Revision 0, CLIIP Traveler to Increase StandardizationShutdown Margin
High Radiation Area
Stroke time
Incorporated by reference
Missed surveillance
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Grace period
TSTF-08-12, Submittal of Technical Specification Branch Positions Inconsistent with the Improved Standard Technical Specifications17 July 2008Submittal of Technical Specification Branch Positions Inconsistent with the Improved Standard Technical Specifications
TSTF-08-13, TSTF-426, Revision 1, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c5 August 2008TSTF-426, Revision 1, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c
TSTF-08-14, Response to Request for Additional Information on TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.18 August 2008Response to Request for Additional Information on TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.
TSTF-08-16, Transmittal of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.17 September 2008Transmittal of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.Safe Shutdown
TSTF-08-17, Request for Fee Exemption for TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.22 September 2008Request for Fee Exemption for TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.
TSTF-08-18, Transmittal of TSTF-512, Revision 0, Revise SR 3.0.3 to Address SRs That Cannot Be Performed or Are Not Met.14 October 2008Transmittal of TSTF-512, Revision 0, Revise SR 3.0.3 to Address SRs That Cannot Be Performed or Are Not Met.Time of Discovery
Shutdown Margin
Functionality Assessment
Missed surveillance