Issue date | Title | Topic | |
---|---|---|---|
ML20035D993 | 11 February 2020 | UFSAR Revision 16 Relevant Information on Fuel Handling | |
ML21055A061 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Appendix A.1, Division 1 Applicable Regulatory Guides | Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Coatings Cyber Security Condition Adverse to Quality Surveillance Frequency Control Program Excess Flow Check Valve Safeguards Contingency Plan Earthquake Turbine Missile Pressure Boundary Leakage Grace period Unidentified leakage |
ML21055A062 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | Safe Shutdown Ultimate heat sink Fire Barrier Stroke time Tornado Missile Temporary Modification Emergency Lighting Open Phase Condition Earthquake Turbine Missile |
ML21055A063 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Coatings Power Uprate Measurement Uncertainty Recapture |
ML21055A064 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation | Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Stroke time Hydrostatic Squib Emergency Lighting Scram Discharge Volume |
ML21055A066 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | Reactor Vessel Water Level Ultimate heat sink Grab sample Stroke time Water Inventory Control Hydrostatic Coatings Nondestructive Examination Squib Emergency Lighting FLEX Scram Discharge Volume MELLLA Excess Flow Check Valve Earthquake Hardened vent Fuel cladding GOTHIC Power Uprate Measurement Uncertainty Recapture |
ML21055A067 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 4, Reactor | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Grab sample Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Finite Element Analysis Abnormal operational transient Pressure and Temperature Limits Report Scram Discharge Volume Feedwater Controller Failure Overtravel Earthquake Fuel cladding Power change |
ML21055A068 | 2 February 2021 | Submittal of Revision 23 to Updated Final Safety Analysis Report, 10CFR50.59 & 10CFR72.48 Evaluation Summary Reports, Commitment Management Report, Revisions to Technical Requirements Manual & Tech Specifications Bases | |
ML21055A069 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Abnormal operational transient Feedwater Controller Failure Earthquake Fuel cladding Recently irradiated fuel Fire Protection Program Power change Power Uprate Measurement Uncertainty Recapture Failure to Scram |
ML21055A070 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Feedwater Controller Failure Earthquake Turbine Missile Power change Coast down |
ML21055A072 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Hot Short Safe Shutdown High winds Ultimate heat sink Grab sample Fire Barrier Tornado Missile Hydrostatic Coatings Emergency Lighting FLEX Spent Fuel Pool Instrumentation Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Liquid penetrant Fire Protection Program Fire Watch Early Warning Fire Detection Scaffolding Power Uprate |
ML21055A073 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | Hot Short Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Squib Emergency Lighting Incorporated by reference Test box Abnormal operational transient Scram Discharge Volume Overtravel Earthquake Fuel cladding Pressure Boundary Leakage Pressure boundary leak Unidentified leakage |
ML21055A074 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, List of Effective Pages | Aging Management |
ML21055A075 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Appendix-B, Aging Management Programs and Activities | High Radiation Area Fire Barrier Anticipated operational occurrence Coatings VT-2 Condition Adverse to Quality Aging Management Surveillance Frequency Control Program Moisture barrier License Renewal Earthquake Control of Heavy Loads Biofouling EVT-1 Liquid penetrant Fire Protection Program Dissimilar Metal Weld Power Uprate Measurement Uncertainty Recapture |
ML21055A076 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Safe Shutdown Reactor Vessel Water Level Grab sample Stroke time Anticipated operational occurrence Weld Overlay Hydrostatic Operating Basis Earthquake Multiple Spurious Operation Abnormal operational transient Pressure and Temperature Limits Report Feedwater Controller Failure License Renewal Earthquake Fuel cladding Liquid penetrant Pressure boundary leak Dissimilar Metal Weld Unidentified leakage Unidentified leak Power Uprate |
ML21055A078 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics | Safe Shutdown Ultimate heat sink Grab sample Hydrostatic Finite Element Analysis Earthquake Recently irradiated fuel |
ML21055A079 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Safe Shutdown Fitness for Duty Process Control Program Safeguards Contingency Plan Fire Protection Program Grace period |
ML21055A080 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Loop seal Grab sample Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Annual Radioactive Effluent Release Report Process Control Program Earthquake Hardened vent Power Uprate Measurement Uncertainty Recapture |
ML21055A081 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML21055A083 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | Fitness for Duty Offsite Dose Calculation Manual Commercial Grade Dedication Probabilistic Risk Assessment Coatings Nondestructive Examination Emergency Lighting Condition Adverse to Quality Process Control Program Safeguards Contingency Plan Pandemic Fire Protection Program Grace period |
ML21055A100 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2196-02, Area Radiation System Monitor Diagram, Sheet 2 of 2 | |
ML21055A101 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6C721-2413, Reactor Building & Auxiliary Building Concrete Beam Schedule | |
ML21055A102 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-2, Logic Diagram Neutron Monitoring System (Part 2) | |
ML21055A103 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawimg 6I721-2007-03, Rev. P, Description of Equipment on Combination Operation Panel H11P603 | |
ML21055A104 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6M721-2535, Diagram-Floor Drains All Floor-Turbine Bldg | |
ML21055A105 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-04, Rev. B, Logic Diagram Neutron Monitoring System Part 4 | |
ML21055A106 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2400-11, Post Accident Sampling System Piping Interconnection Diagram | |
ML21055A107 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing No. 6M721N-2040, Rev. AR, Floor Drain Collector System Diagram Radwaste System | |
ML21055A108 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2230-02, Logic Diagram Reactor Core Isolation Cooling System | |
ML21055A109 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-10, Logic Diagram Residual Heat Removal System | |
ML21055A110 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-1, Logic Diagram EECW & Eesw Systems Auto-Manual Control | |
ML21055A111 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6M721-2223, Diagram Equipment Drains All Floors Auxiliary and Reactor Buildings | |
ML21055A112 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2156-02, Instrument Diagram Reactor Protection System Part 2 C71 | Scram Discharge Volume |
ML21055A113 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-04, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Close | |
ML21055A114 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2679-01, Primary Containment Monitoring System System Diagram | |
ML21055A115 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6C721-2415, Reactor Building & Auxiliary Building Concrete Prier Schedule | |
ML21055A116 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6M721-2032, Sump Pump Diagram Radwaste System | |
ML21055A117 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-11, Logic Diagram Residual Heat Removal System | |
ML21055A118 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6A72IN-2043, Fire Protection Evaluation Residual Heat Removal Complex Roop - Plan El 617'-0 and 637'-0 | |
ML21055A119 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6M721-2031, Sump Pump Diagram Sheet 1, Radwaste System | Loop seal |
ML21055A120 | 2 February 2021 | 3 to Final Safety Analysis Report, Drawing No. 6C721-2400, Reactor Building Framing Section 48-48 Upper Area Unit 2 | |
ML21055A121 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-08, Rev. C, Logic Diagram Residual Heat Removal System | |
ML21055A122 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2156-01, Rev. s, Instrument Diagram Reactor Protection System (Part 1) C71 | |
ML21055A123 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6M721-2090, Rev. AO, System Diagram Nuclear Boiler System | |
ML21055A124 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2210-2, Logic Diagram Core Spray System | |
ML21055A125 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004, Diagram Condensate System | |
ML21055A126 | 2 February 2021 | 3 to Final Safety Analysis Report, Drawing 6C721-2315, Rev. I, Reactor Building & Auxiliary Building Fdh Walls Sections & Details Sht 1, Unit 2 | |
ML21055A127 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6A721N-2042, Fire Protection Evaluation Residual Heat Removal Complex Upper Floor Plan El. 617'-0 | |
ML21055A128 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2100-03, Logic Diagram Reactor Recirculation System Part 3 | |
ML21055A129 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-01, Process Radiation Monitor Subsystems System Diagram General Description |