Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18092B49828 February 1986Number 1,Generator Operating Guide.
ML18092B49920 March 1987Artificial Island Stability Limitation Operating Restrictions.High winds
ML18130A40316 December 1981Nuclear Environ Qualification of Module Case & Electric & Electronic Components of Pc Boards & Plug-In Modules of Remote Multiplexer Units,Models MC170AD-Q2 & MC370AD-Q2 for Validyne Engineering Corp.
ML18139B8388 April 1982Emergency Operations Facility.
ML18141A04518 May 1983Administrative Procedure Adm 98, Emergency Usage Procedures Writers Guide.Boric Acid
Health Physics Network
Post Accident Monitoring
Design basis earthquake
Earthquake
ML18141A5301 March 1984Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737Backfit
ML18142A09231 October 1982Rev B to Nuclear Environ Qualification of Remote Multiplexer Unit Models MC170AD-Q2 & MC370AD-Q2 & Associated Pc Boards & Plug-In Modules.
ML18142A0932 October 1981Rev 0 to Procedure 466, Insp Record Checklist.
ML18142A09419 November 1980Rev 4 to Procedure 9833, Design Spec for HD310 High Speed Data Acquisition Sys.
ML18142A0958 December 1981Rev 13 to Procedure 9834, Qualification Spec for Remote Multiplexer Units & Associated Signal Conditioner Modules.Safe Shutdown Earthquake
Earthquake
ML18142A0965 November 1984Procedure 466, Remote Multiplexer Integrated Functional Test Procedure.Safe Shutdown
ML18142A09715 January 1981Rev B to Acceptance Test Procedure ATP442 MC170AD-Q2 (Less Plug-In Cards).
ML18142A09829 October 1981Rev a to Acceptance Test Procedure ATP464, MC370AD-Q2 (Less Plug-In Cards).
ML18142A09910 December 1980Acceptance Test Procedure ATP445, AB295-Q2 Analog Board Assembly.
ML18142A10015 January 1981Rev a to Acceptance Test Procedure Atp 447, AD296-Q2-1,-2 Digital Pcba.Reverse polarity
ML18142A10126 February 1981Rev a to Acceptance Test Procedure Atp 451, PS294-Q2.
ML18142A10228 May 1981Rev a to Acceptance Test Procedure ATP454, PS171-Q2 Power Supply for MC170.
ML18142A10326 March 1981Rev a to Acceptance Test Procedure ATP440, CM249-Q2 Carrier Modulator.
ML18142A10628 May 1981Rev a to Acceptance Test Procedure ATP450, BA332-Q2 Buffer Amplifier.
ML18142A10730 June 1981Rev C to Acceptance Test Procedure Atp 452, DI325-Q2 Digital Encoder,Four Input.
ML18142A10814 April 1981Rev a to Acceptance Test Procedure ATP444-1, PT174-1-Q2 Thermometer Signal Conditioner.
ML18142A10913 April 1981Rev B to Acceptance Test Procedure ATP444-2, PT174-2-Q2 Resistance Thermometer Signal Conditioner.
ML18142A11013 April 1981Acceptance Test Procedure Atp 453, TC292-Q2 Thermocouple Conditioner.
ML18142A11128 May 1981Rev a to Acceptance Test Procedure ATP449, PC202-Q2 Buffer Amplifier.
ML18142A11217 April 1981Rev B to Acceptance Test Procedure ATP443, CD173-Q2 High-Gain Carrier Demodulator.
ML18142A1139 April 1981Acceptance Test Procedure ATP446, JC177-Q2 Jumper Card.
ML18142A11421 April 1983Qualification Test Rept QTR 82-003, Surge Withstand Capability Tests,MC170AD-Q2 & MC370AD-Q2.
ML18142A1364 November 1983Procedure OP-4.3, Shipping of Spent Fuel TN-8L Shipping Cask,Loading & Handling Procedures.
ML18142A13715 September 1983Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask,Unloading & Handling Procedures.
ML18152A87517 March 1988Proposed Changes to Tech Specs Section 6,replacing Organization Charts W/General Description of Organizational Requirements & Certain Corporate Level Position Titles W/ General Position DecriptionsOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML18153B83724 July 1989Proposed Tech Specs Reflecting Composition of Station Nuclear Safety & Operating Committee Following Recent Assignment of superintendent-engineering Position at Stations.Tech Spec Pages Include 6.1-6,6-5 & 6-6
ML19249E41225 September 1979Draft of Revised Reactor Trip Procedure
ML19256E8048 November 1979Steam Generator Insp Plan for Upcoming Nov 1979 Refueling Outage
ML19256F65110 October 1979Shop Insp Procedure for Air Lock Doors,Revision 0Liquid penetrant
ML19257A9113 January 1980Reactor Containment Bldg Integrated Leak Rate Test.
ML19305D3106 July 1978Qualification Test Rept on Three Model 386A Differential Pressure Transmitters & Remote Sensors, Vol 1,Revision BCoatings
ML19305D3136 July 1978Qualification Test Rept on Three Model 386A Differential Pressure Transmitters & Remote Sensors, Vol 2,Revision C
ML19308A7504 June 1976Proposed Tech Specs for Compliance w/10CFR50,App 1.Grab sample
ML19308B01530 November 1976Proposed Tech Spec 4.4 Re Limitations of Containment Integrated Leakage Rate & Containment Leakage TestsLocal Leak Rate Testing
ML19308B03630 November 1976Proposed Tech Specs 4.17 & 6.6 Re Inservice Insp of once-through Steam GeneratorsShutdown Margin
Stress corrosion cracking
Fuel cladding
ML19308D62728 June 1978Tech Spec Change Request Re Paragraph 2.B(6),stipulating That Byproduct & SNM Associated W/Four Fuel Assemblies Acquired by Fl Power Corp from Duke Power Co Previously Irradiated in Oconee 1 May Be Possessed
ML19312B7779 November 1977Proposed Tech Spec 3.5.2 Permitting Operation of Unit 1 During Cycle 4 in Unrodded ModeShutdown Margin
ML19312B7893 January 1978Proposed Tech Spec 2.3-9 & 10 Re Computer Software Used to Process Incore Detector Signal.Includes Modified power-imbalance Trip Setpoints to Account for Bias in Positive Imbalance Measured by Incore Detector Sys
ML19312B79317 July 1978Proposed Tech Spec 3.1.6.4,changing Steam Generator Leak Rate Limit
ML19312B79727 April 1978Proposed Tech Spec 6.4,incorporating Operating Procedure Requirements Re B&W Small Break ECCS AnalysisEarthquake
Fire Protection Program
ML19312B8002 December 1977Proposed Tech Spec 6.6.2.1 Providing Requirement for Prompt Written Notification of Certain ROs by Telephone,Mailgram or Facsimile TransmissionShutdown Margin
Fuel cladding
ML19312B80631 October 1977Proposed Tech Specs 6.6-1,-2,-3 & -4 Deleting Redundant Info Currently Being Reported in Annual Operating Rept
ML19312B80920 April 1978Proposed Tech Spec 3.3 Incorporating New Tech Spec 3.3.8 Requiring Operability of Three HPI Pumps for Each Unit During Power Operation Above 60% Full Power
ML19312B81026 October 1977Proposed Tech Specs 3.5-9 & 3.5-24a,deleting Existing Reactor Core Quadrant Power Tilt & Control Rod Position Limits & Instituting More Conservative LimitsShutdown Margin
ML19312B8157 October 1977Proposed Changes to Tech Specs 3.7 & 4.6 Re Auxiliary Electrical Systems & Emergency Power Periodic TestingSafe Shutdown