Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML05152024724 May 2005Previous Revision of Inspection Input to Point Beach Integrated Report 50-266-04-003 & 50-301-04-003High Radiation Area
Scaffolding
ML05152024824 May 2004Draft of Revision 1 of Inspection Input to Point Beach Nuclear Plant, Units 1 & 2 DRS Input to Integrated Report with R. Alexander and K. Riemer NotesHigh Radiation Area
Significance Determination Process
Scaffolding
Substantial potential for an overexposure
ML0518203598 July 2005Notice of Meeting with Nuclear Management Company Regarding the Planned Amendment to the Point Beach Nuclear Plant, Unit 1, Updated Safety Analysis Report Relating to Movement of the Reactor Vessel Head
ML05238012831 August 2005Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
ML05262038030 September 2005Fiscal Year 2005 Evaluation of the Operating Reactor Licensing ProgramEnforcement Discretion
License Renewal
Exemption Request
Power Uprate
Stretch Power Uprate
Measurement Uncertainty Recapture
ML0529401992 December 2005Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.Severe Accident Management Guideline
ML06023019310 February 2006Document Reclassified as Non-Proprietary
ML0602400299 February 2006Document Reclassified as Non-Proprietary
ML06024007723 December 2005Memo 12/23/05 Point Beach One-Time Deviation from Regulatory Response Column of Reactor Oversight Process Action MatrixPreliminary White Finding
ML06025029425 January 2006Canceled Notice of Meeting with Nuclear Management Company Regarding Fleet Transition to NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants
ML06030004313 February 2006Document Reclassified as Non-Proprietary
ML06075034020 April 2006Trip Report Regarding Staff Observations of Scaled Flume Testing of the Point Beach Nuclear Plant Proposed Replacement Suction Strainer DesignCoatings
ML06178055910 July 2006Revised Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
ML06216032829 August 2006Request for Additional Information Related to Evaluation of Event Notification 42129Coatings
ML06265040422 June 2005Memorandum to P. Louden from P. Pelke, Review of Receipt of Allegation, Allegation No. RIII-05-A-0062 (Point Beach)
ML06265041129 August 2005Memorandum to Region III Office Allegation Coordinator from P. Louden, Review of Discrimination Complaint Filed with Department of Labor
ML06265044313 March 2003Memorandum to C. Pederson from J. Heller, OI Investigation Kewaunee (Point Beach) Nuclear Power Plant
ML06265044425 March 2003Memorandum to H. Clayton from C. Pederson, OI Investigation Kewaunee (Point Beach) Nuclear Power Plant
ML0626801416 March 2003Memo to Dyer from Paul, Point Beach 1: Discrimination, Against Contract Welder for Raising Fitness-For-Duty Concern (OI Case No. 3-2002-020)
ML0626801436 March 2003Memo to Dyer from Paul, Point Beach 1: Discrimination, Against Contract Welder for Raising Fitness-For-Duty Concern (OI Case No. 3-2002-020)
ML06268026121 June 2005Memorandum to Allegation File from P. Pelke Receipt of Allegation (Point Beach)
ML0634003257 December 2006Notice of Presubmittal Conference for Proposed Emergency Plan Changes
ML07102026425 February 1981Memo from Thomas Murley to Stephen Hanauer Re Diesel Generator Loading Problems Related to SIS Reset on Loss of Offsite PowerSafe Shutdown
Shutdown Margin
Anticipated operational occurrence
ML07120029518 May 2007Cover Memo to Safety Evaluation by the Office of Nuclear Reactor Regulation - Direct Transfer of License from Nuclear Management Company, LLC & Wisconsin Electric Power Company to FPL Energy Point Beach, LLC (TAC # MD4112 & TAC # MD4113)
ML08074008414 March 2008Draft Regulatory Guide for Comment
ML08241022928 August 2008Notice of Forthcoming Meeting with Florida Energy Point Beach LLC, to Discuss Their Proposed Extended Power Uprate
ML08273070729 September 2008Pre-application Meeting with FPL Energy Point Beach, LLC to Discuss Their Proposed Alternate Source Term Amendment
ML0921805186 August 2009Notice of Public Meeting with Florida Power & Light Energy
ML1106104277 March 2011Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold
ML11228A25716 August 2011Final - Task Interface Agreement (TIA) - Evaluation of Point Beach Nuclear Plant Torado Missile Protection Licensing Basis (TIA 2011-011)Safe Shutdown
High winds
Tornado Missile
Probabilistic Risk Assessment
Tornado Generated Missile
Tornado Missile Protection
TORMIS
Earthquake
ML12115A08024 April 2012Memo 042412 TIA 2012-07 for Point Beach EDG Tornado MissilesSafe Shutdown
High winds
Mission time
Anticipated operational occurrence
Tornado Missile
Functionality Assessment
Tornado Generated Missile
Tornado Missile Protection
Earthquake
ML12128050918 June 2012May 1, 2012 - Summary of Teleconference with Performance Contracting, Inc., Regarding Large Flume Testing for Point Beach Nuclear Plant
ML12213A0611 August 20128/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol
ML12222A0399 August 20128/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto
ML12243A52319 July 2012Letter from FEMA Region 5 to FEMA Hq Regarding Closure of Point Beach Deficiency
ML13154A5114 June 2013Rai'S Following Ifib Analysis of NextEra Energy'S 2013 Decommissioning Funding Status Reports for Duane Arnold Energy Center and Point Beach Units 1 and 2
ML15302A1702 November 2015Forthcoming Closed Pre-Application Teleconference with NextEra Energy Point Beach, LLC (Nextera), Regarding Steam Generators H* License Amendment Request
ML16088A20428 March 2016Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template)Decommissioning Funding Plan
ML16088A20528 March 2016Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
ML20233A79020 August 2020Summary of the July 30, 2020, Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of the Duane Arnold Energy Center and the Point Beach Nuclear Plant
ML21062A07021 April 2021Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Point Beach Units 1 and 2 Independent Spent Fuel Storage Installation (2012 and 2015)Decommissioning Funding Plan
ML21075A34217 March 2021Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L-2020-SLE-0002) - Memo
ML22004A0776 January 2022Summaries of December 8, 2021 Draft Supplemental Environmental Impact Statement for Subsequent License Renewal Application Public MeetingsEnvironmental Justice
ML22020A28111 February 2022Subsequent License Renewal Application Summary of December 2, 2021, Public Meeting on Proposed Aging Management ActivitiesAging Management
ML22034A39316 February 2022Calendar Year 2021 Security Baseline Completion MemoCOVID-19
ML23044A36615 February 2023Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III
NRC Generic Letter 1989-1130 June 1989NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level RedundancySafe Shutdown