ML07004044127 December 2006License Amendment Request for Adoption of TSTF-484 Revision 0, Use TS 3.10.1 for Scram Time Testing ActivitiesHydrostatic
Incorporated by reference
ML07010041012 December 20062006/12/12-Letter from Entergy to NRC Dated 12 December, 2006 (Including Attached PNPS MACCS2 Input Files -attached Cd) Regarding License Renewal Application Amendment for Pilgrim Station Operating LicenseNondestructive Examination
VT-2
Aging Management
EVT-1
Fire Protection Program
ML0701105014 January 2007Technical Specification Revisions for Control Rod Operability Scram Insertion Times and Control Rod Accumulator RequirementsShutdown Margin
Anticipated operational occurrence
Hydrostatic
Abnormal operational transient
Scram Discharge Volume
Overtravel
ML07023028616 January 2007License Renewal Application Amendment 12Nondestructive Examination
Aging Management
EVT-1
Fire Protection Program
ML07023029315 January 2007Proposed Change to Applicability of Pilgrim'S Pressure - Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, and 3.6.3, Revision 1Hydrostatic
ML07025017510 January 2007License Renewal Application Amendment 11Nondestructive Examination
Aging Management
Maintenance Rule Program
EVT-1
Fire Protection Program
ML07037029830 January 2007E-MAIL: (PD) Pilgrim LRA Amendment 13High Radiation Area
Non-Destructive Examination
Aging Management
EVT-1
Fire Protection Program
ML07038022717 January 2007E-MAIL: (PD) Pilgrim LRA Amendment 12Nondestructive Examination
Aging Management
EVT-1
Fire Protection Program
ML07065035023 February 2007License Renewal Application Amendment 14Nondestructive Examination
Aging Management
EVT-1
Fire Protection Program
ML07079031613 March 2007License Renewal Application Amendment 15Hydrostatic
VT-2
Aging Management
ML07155031017 May 2007License Renewal Application Amendment 17Non-Destructive Examination
Anticipated operational occurrence
Hydrostatic
Aging Management
EVT-1
Fire Protection Program
ML07173046721 June 2007License Renewal Application Amendment 18Fire Barrier
ML07219061130 July 2007License Renewal Application Amendment 19Nondestructive Examination
Aging Management
EVT-1
Fire Protection Program
ML07346006229 November 2007Request for License Amendment - Control Room Envelope Habitability (TSTF-7448, Revision 3)Safe Shutdown
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Incorporated by reference
Annual Radiological Environmental Operating Report
Recently irradiated fuel
ML08283013530 September 2008Request for License Amendment for Licensee Name ChangesSafe Shutdown
Safeguards Contingency Plan
Fire Protection Program
ML10027005424 January 2010Proposed License Amendment to Technical Specifications: Revised P-T Limit Curves and Relocation of Pressure-Temperatures (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)Pressure and Temperature Limits Report
ML10197035915 July 2010Submittal of License Amendment Request, Cyber Security PlanSafe Shutdown
Cyber Security
Incorporated by reference
Fire Protection Program
ML11005029826 January 2011Issuance of Amendment Regarding Revised Pressure and Temperature (P-T) Limit Curves and Relocation of P-T Curves to the PTLRSafe Shutdown
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Fire Protection Program
ML1102000587 January 2011License Renewal Application, Supplemental InformationCoatings
VT-2
Aging Management
Through-Wall Leak
ML11312A05128 October 2011Proposed License Amendment: Revision to Technical Specification (TS) Table 3.2.B for the Condensate Storage Tank (CST) Low Level Trip Setpoint & Corrections to Typographical Errors Incurred During Prior License Amendment.
ML12005A19829 December 2011Cycle-Specific License Amendment Request for Rod Worth Minimizer (RWM) Bypass Allowance to Allow Reactor Startup
ML13108A2175 April 2013Proposed License Amendment: Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open (PRFO) Transient Reported by General Electric Nuclear Energy in Accordance with 10 CFR 21.21(d)Unanalyzed Condition
Anticipated operational occurrence
Fuel cladding
ML13323A51814 November 2013Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated FuelSafe Shutdown
Reactor Vessel Water Level
Non-Destructive Examination
Stroke time
Control of Heavy Loads
Fuel cladding
Recently irradiated fuel
ML13346A02626 November 2013Proposed License Amendment Request to Modify Technical Specification 4.3.4, Heavy Loads to Facilitate Dry Storage Handling OperationsSafe Shutdown
Earthquake
Control of Heavy Loads
ML14042A16631 January 2014License Amendment Request - Cyber Security Plan Implementation ScheduleSafe Shutdown
Cyber Security
Fire Protection Program
ML15205A28715 July 2015License Amendment Request - Cyber Security Plan Implementation ScheduleSafe Shutdown
Cyber Security
Fire Protection Program
ML16021A45914 January 2016Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-Shift Chemistry TechnicianSafe Shutdown
High Radiation Area
Incorporated by reference
Severe Accident Management Guideline
Minimum staff
Fire Protection Program
ML17053A46814 February 2017Technical Specifications Proposed Change - Administrative Controls for Permanently Defueled ConditionHigh Radiation Area
Offsite Dose Calculation Manual
Hydrostatic
Annual Radiological Environmental Operating Report
Fuel cladding
Fire Protection Program
ML17101A60830 March 2017License Amendment Request - Cyber Security Plan Implementation ScheduleSafe Shutdown
Enforcement Discretion
Cyber Security
Fire Protection Program
ML18023A68712 January 2018License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition
ML18023A69112 January 2018Revise the Pilgrim Emergency Plan to Address the Permanently Defueled ConditionSafe Shutdown
Fitness for Duty
Health Physics Network
High winds
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Met Tower
Severe Accident Management Guideline
Earthquake
Fuel cladding
Minimum staff
Fire Protection Program
Power change
Siren
Exclusive Use
ML18218A1741 August 2018Revised the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled ConditionTime of Discovery
High winds
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Design basis earthquake
Safeguards Contingency Plan
Exemption Request
Earthquake
Fuel cladding
Minimum staff
Fire Protection Program
Grace period
Fatality
ML19170A14922 August 2019Enclosure 2, Draft Conforming Amendment for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003)Safe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
ML21076A40417 March 2021License Amendment Request to Revise Pilgrim Nuclear Power Station Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel PoolSafe Shutdown
Time of Discovery
High Radiation Area
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Cyber Security
Aging Management
Missed surveillance
Annual Radiological Environmental Operating Report
B.5.b Mitigating Strategies
Fire Protection Program
ML21103A05512 May 2021May 2021 Pilgrim Nuclear Power Station Issuance of Amendment 254 to Revise the Physical Security Plan Alternative Measures, Cover Letter and Amendment
ML21148A19928 May 2021Supplemental Information to Correct License Amendment Request to Revise Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool