Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML070040441 | 27 December 2006 | License Amendment Request for Adoption of TSTF-484 Revision 0, Use TS 3.10.1 for Scram Time Testing Activities | Hydrostatic Incorporated by reference |
ML070100410 | 12 December 2006 | 2006/12/12-Letter from Entergy to NRC Dated 12 December, 2006 (Including Attached PNPS MACCS2 Input Files -attached Cd) Regarding License Renewal Application Amendment for Pilgrim Station Operating License | Nondestructive Examination VT-2 Aging Management EVT-1 Fire Protection Program |
ML070110501 | 4 January 2007 | Technical Specification Revisions for Control Rod Operability Scram Insertion Times and Control Rod Accumulator Requirements | Shutdown Margin Anticipated operational occurrence Hydrostatic Abnormal operational transient Scram Discharge Volume Overtravel |
ML070230286 | 16 January 2007 | License Renewal Application Amendment 12 | Nondestructive Examination Aging Management EVT-1 Fire Protection Program |
ML070230293 | 15 January 2007 | Proposed Change to Applicability of Pilgrim'S Pressure - Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, and 3.6.3, Revision 1 | Hydrostatic |
ML070250175 | 10 January 2007 | License Renewal Application Amendment 11 | Nondestructive Examination Aging Management Maintenance Rule Program EVT-1 Fire Protection Program |
ML070370298 | 30 January 2007 | E-MAIL: (PD) Pilgrim LRA Amendment 13 | High Radiation Area Non-Destructive Examination Aging Management EVT-1 Fire Protection Program |
ML070380227 | 17 January 2007 | E-MAIL: (PD) Pilgrim LRA Amendment 12 | Nondestructive Examination Aging Management EVT-1 Fire Protection Program |
ML070650350 | 23 February 2007 | License Renewal Application Amendment 14 | Nondestructive Examination Aging Management EVT-1 Fire Protection Program |
ML070790316 | 13 March 2007 | License Renewal Application Amendment 15 | Hydrostatic VT-2 Aging Management |
ML071550310 | 17 May 2007 | License Renewal Application Amendment 17 | Non-Destructive Examination Anticipated operational occurrence Hydrostatic Aging Management EVT-1 Fire Protection Program |
ML071730467 | 21 June 2007 | License Renewal Application Amendment 18 | Fire Barrier |
ML072190611 | 30 July 2007 | License Renewal Application Amendment 19 | Nondestructive Examination Aging Management EVT-1 Fire Protection Program |
ML073460062 | 29 November 2007 | Request for License Amendment - Control Room Envelope Habitability (TSTF-7448, Revision 3) | Safe Shutdown Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Incorporated by reference Annual Radiological Environmental Operating Report Recently irradiated fuel |
ML082830135 | 30 September 2008 | Request for License Amendment for Licensee Name Changes | Safe Shutdown Safeguards Contingency Plan Fire Protection Program |
ML100270054 | 24 January 2010 | Proposed License Amendment to Technical Specifications: Revised P-T Limit Curves and Relocation of Pressure-Temperatures (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) | Pressure and Temperature Limits Report |
ML101970359 | 15 July 2010 | Submittal of License Amendment Request, Cyber Security Plan | Safe Shutdown Cyber Security Incorporated by reference Fire Protection Program |
ML110050298 | 26 January 2011 | Issuance of Amendment Regarding Revised Pressure and Temperature (P-T) Limit Curves and Relocation of P-T Curves to the PTLR | Safe Shutdown Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Fire Protection Program |
ML110200058 | 7 January 2011 | License Renewal Application, Supplemental Information | Coatings VT-2 Aging Management Through-Wall Leak |
ML11312A051 | 28 October 2011 | Proposed License Amendment: Revision to Technical Specification (TS) Table 3.2.B for the Condensate Storage Tank (CST) Low Level Trip Setpoint & Corrections to Typographical Errors Incurred During Prior License Amendment. | |
ML12005A198 | 29 December 2011 | Cycle-Specific License Amendment Request for Rod Worth Minimizer (RWM) Bypass Allowance to Allow Reactor Startup | |
ML13108A217 | 5 April 2013 | Proposed License Amendment: Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open (PRFO) Transient Reported by General Electric Nuclear Energy in Accordance with 10 CFR 21.21(d) | Unanalyzed Condition Anticipated operational occurrence Fuel cladding |
ML13323A518 | 14 November 2013 | Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel | Safe Shutdown Reactor Vessel Water Level Non-Destructive Examination Stroke time Control of Heavy Loads Fuel cladding Recently irradiated fuel |
ML13346A026 | 26 November 2013 | Proposed License Amendment Request to Modify Technical Specification 4.3.4, Heavy Loads to Facilitate Dry Storage Handling Operations | Safe Shutdown Earthquake Control of Heavy Loads |
ML14042A166 | 31 January 2014 | License Amendment Request - Cyber Security Plan Implementation Schedule | Safe Shutdown Cyber Security Fire Protection Program |
ML15205A287 | 15 July 2015 | License Amendment Request - Cyber Security Plan Implementation Schedule | Safe Shutdown Cyber Security Fire Protection Program |
ML16021A459 | 14 January 2016 | Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-Shift Chemistry Technician | Safe Shutdown High Radiation Area Incorporated by reference Severe Accident Management Guideline Minimum staff Fire Protection Program |
ML17053A468 | 14 February 2017 | Technical Specifications Proposed Change - Administrative Controls for Permanently Defueled Condition | High Radiation Area Offsite Dose Calculation Manual Hydrostatic Annual Radiological Environmental Operating Report Fuel cladding Fire Protection Program |
ML17101A608 | 30 March 2017 | License Amendment Request - Cyber Security Plan Implementation Schedule | Safe Shutdown Enforcement Discretion Cyber Security Fire Protection Program |
ML18023A687 | 12 January 2018 | License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition | |
ML18023A691 | 12 January 2018 | Revise the Pilgrim Emergency Plan to Address the Permanently Defueled Condition | Safe Shutdown Fitness for Duty Health Physics Network High winds High Radiation Area Grab sample Offsite Dose Calculation Manual Met Tower Severe Accident Management Guideline Earthquake Fuel cladding Minimum staff Fire Protection Program Power change Siren Exclusive Use |
ML18218A174 | 1 August 2018 | Revised the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition | Time of Discovery High winds Offsite Dose Calculation Manual Probabilistic Risk Assessment Design basis earthquake Safeguards Contingency Plan Exemption Request Earthquake Fuel cladding Minimum staff Fire Protection Program Grace period Fatality |
ML19170A149 | 22 August 2019 | Enclosure 2, Draft Conforming Amendment for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML21076A404 | 17 March 2021 | License Amendment Request to Revise Pilgrim Nuclear Power Station Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool | Safe Shutdown Time of Discovery High Radiation Area Offsite Dose Calculation Manual Probabilistic Risk Assessment Cyber Security Aging Management Missed surveillance Annual Radiological Environmental Operating Report B.5.b Mitigating Strategies Fire Protection Program |
ML21103A055 | 12 May 2021 | May 2021 Pilgrim Nuclear Power Station Issuance of Amendment 254 to Revise the Physical Security Plan Alternative Measures, Cover Letter and Amendment | |
ML21148A199 | 28 May 2021 | Supplemental Information to Correct License Amendment Request to Revise Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool |