HNP-03-061, Emergency Core Cooling System Evaluation Changes | 4 June 2003 | Emergency Core Cooling System Evaluation Changes | |
HNP-03-063, Day Special Report - Steam Generator Tubes Plugged | 15 May 2003 | Day Special Report - Steam Generator Tubes Plugged | |
HNP-03-067, May 2003 Monthly Operating Report for Shearon Harris | 12 June 2003 | May 2003 Monthly Operating Report for Shearon Harris | |
HNP-03-074, Revised Epips, Including EPIP-PEP-260, Rev. 10, EPIP-PEP-270, Rev. 10 & EPIP-PEP-330, Rev. 6 | 9 July 2003 | Revised Epips, Including EPIP-PEP-260, Rev. 10, EPIP-PEP-270, Rev. 10 & EPIP-PEP-330, Rev. 6 | Safe Shutdown Grab sample Siren Overdose |
HNP-03-075, Cycle 12 Core Operating Limits Report | 1 July 2003 | Cycle 12 Core Operating Limits Report | Shutdown Margin |
HNP-03-079, June 2003 Monthly Operating Report for Shearon Harris | 15 July 2003 | June 2003 Monthly Operating Report for Shearon Harris | |
HNP-03-080, Day Response to NRC Bulletin 2003-01 for Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors | 8 August 2003 | Day Response to NRC Bulletin 2003-01 for Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors | Boric Acid Scaffolding |
HNP-03-081, Inservice Inspection Summary Report | 13 August 2003 | Inservice Inspection Summary Report | Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
HNP-03-089, Response to Generic Letter 2003-01, Control Room Habitability, Sixty-Day Response | 11 August 2003 | Response to Generic Letter 2003-01, Control Room Habitability, Sixty-Day Response | |
HNP-03-093, Submittal of Revision 3 to the Physical Security and Safeguards Contingency Plan | 26 August 2003 | Submittal of Revision 3 to the Physical Security and Safeguards Contingency Plan | Safeguards Contingency Plan |
HNP-03-094, July 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | 12 August 2003 | July 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | |
HNP-03-099, Partial Withdrawal of License Amendment Request Regarding Addition of Methodology References to the Core Operating Limits Report | 28 August 2003 | Partial Withdrawal of License Amendment Request Regarding Addition of Methodology References to the Core Operating Limits Report | |
HNP-03-101, Withdrawal of License Amendment Request Regarding Missed Surveillance & Adoption of a TS Bases Control Program Using Consolidated Line Item Improvement Process | 29 August 2003 | Withdrawal of License Amendment Request Regarding Missed Surveillance & Adoption of a TS Bases Control Program Using Consolidated Line Item Improvement Process | Missed surveillance |
HNP-03-107, August 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | 9 September 2003 | August 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | |
HNP-03-111, Change to Emergency Plan Implementing Procedures for Shearon Harris | 22 September 2003 | Change to Emergency Plan Implementing Procedures for Shearon Harris | Severe Accident Management Guideline Earthquake Downpower Siren Subsequent actuation |
HNP-03-114, Revision to the Cycle 12 Core Operating Limits Report | 26 September 2003 | Revision to the Cycle 12 Core Operating Limits Report | Shutdown Margin |
HNP-03-115, September 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | 2 October 2003 | September 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | |
HNP-03-118, 90-Day Response to NRC Bulletin 2003-02 for Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity | 13 November 2003 | 90-Day Response to NRC Bulletin 2003-02 for Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity | Boric Acid VT-2 Through-Wall Leakage |
HNP-03-122, Report of Changes Pursuant to 10 CFR 50.59 | 10 November 2003 | Report of Changes Pursuant to 10 CFR 50.59 | Safe Shutdown Fire Barrier Temporary Modification Fire Protection Program |
HNP-03-138, November 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | 10 December 2003 | November 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | |
HNP-03-140, Notification of NPDES Permit Proposed Change | 8 December 2003 | Notification of NPDES Permit Proposed Change | |
HNP-03-145, Revision 15 to PEP-310, Notifications and Communications. | 10 December 2003 | Revision 15 to PEP-310, Notifications and Communications. | |
HNP-03-150, Partial Withdrawal of License Amendment Request Regarding Administrative Revision to the Technical Specification Index | 10 December 2003 | Partial Withdrawal of License Amendment Request Regarding Administrative Revision to the Technical Specification Index | |
HNP-04-003, December 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | 8 January 2004 | December 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant | |
HNP-04-005, Supplemental Information to the RAI Regarding Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions. | 19 January 2004 | Supplemental Information to the RAI Regarding Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions. | Safe Shutdown Earthquake |
HNP-04-006, Request to Use the Frequency of ASME OM Code Case OMN-13 for the Visual Examination of Snubbers | 3 February 2004 | Request to Use the Frequency of ASME OM Code Case OMN-13 for the Visual Examination of Snubbers | Incorporated by reference |
HNP-04-008, License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b, and Administrative Update to the Index | 4 February 2004 | License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b, and Administrative Update to the Index | Shutdown Margin High Radiation Area Ultimate heat sink Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
HNP-04-014, Annual Operating Report - 2003 | 24 February 2004 | Annual Operating Report - 2003 | |
HNP-04-047, NRC Correspondence Distribution List Update | 5 October 2004 | NRC Correspondence Distribution List Update | |
HNP-04-050, Change to Emergency Plan Implementing Procedures | 12 March 2004 | Change to Emergency Plan Implementing Procedures | Shutdown Margin Grab sample Severe Accident Management Guideline Downpower Siren Subsequent actuation |
HNP-04-051, Annual Radioactive Effluent Release Report | 15 April 2004 | Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Fuel cladding Tritium |
HNP-04-056, Annual Radiological Environmental Operating Report for 2003 | 23 April 2004 | Annual Radiological Environmental Operating Report for 2003 | Offsite Dose Calculation Manual Missed surveillance Annual Radiological Environmental Operating Report Chernobyl |
HNP-04-057, Annual Environmental (Non-Radiological) Operating Report | 23 April 2004 | Annual Environmental (Non-Radiological) Operating Report | Biofouling |
HNP-04-060, Response to the Request for Additional Information Concerning the License Amendment Request for a One-Time Increase in Steam Generator Inspection Interval | 15 April 2004 | Response to the Request for Additional Information Concerning the License Amendment Request for a One-Time Increase in Steam Generator Inspection Interval | Non-Destructive Examination Hydrostatic Eddy Current Testing |
HNP-04-063, March 2004 Monthly Operating Report for Shearon Harris | 7 April 2004 | March 2004 Monthly Operating Report for Shearon Harris | |
HNP-04-067, Shearon, Unit I Supplemental Response to the April 29, 2003, Order EA-03-086 | 29 April 2004 | Shearon, Unit I Supplemental Response to the April 29, 2003, Order EA-03-086 | Enforcement Discretion Safeguards Contingency Plan |
HNP-04-071, Request for License Amendment Technical Specification Surveillance Requirements (SR) 4.0.5.A and Associated Bases | 5 May 2004 | Request for License Amendment Technical Specification Surveillance Requirements (SR) 4.0.5.A and Associated Bases | Time of Discovery Grace period |
HNP-04-075, Requested Additional Information for License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b | 9 June 2004 | Requested Additional Information for License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b | |
HNP-04-076, One Year Special Report, Steam Generator Tube Inspection Results | 7 May 2004 | One Year Special Report, Steam Generator Tube Inspection Results | Eddy Current Testing |
HNP-04-082, Supplemental Response to the April 29,2003, Order EA-03-086 | 20 May 2004 | Supplemental Response to the April 29,2003, Order EA-03-086 | |
HNP-04-083, Day Special Report, Steam Generator Tube Plugging | 27 May 2004 | Day Special Report, Steam Generator Tube Plugging | Eddy Current Testing |
HNP-04-085, Emergency Core Cooling System Evaluation Changes | 28 May 2004 | Emergency Core Cooling System Evaluation Changes | |
HNP-04-088, May 2004 Monthly Operating Report for Shearon Harris Nuclear Power Plant | 10 June 2004 | May 2004 Monthly Operating Report for Shearon Harris Nuclear Power Plant | |
HNP-04-090, Notification of Modification Activities Temporarily Affecting the Harris Nuclear Plant Emergency Response Data System | 10 June 2004 | Notification of Modification Activities Temporarily Affecting the Harris Nuclear Plant Emergency Response Data System | |
HNP-04-093, Withdrawal of the Request for a License Amendment Regarding Technical Specification Surveillance Requirement 4.4.5.3a | 6 August 2004 | Withdrawal of the Request for a License Amendment Regarding Technical Specification Surveillance Requirement 4.4.5.3a | Time of Discovery Grace period |
HNP-04-097, Day Response to NRC Bulletin 2004-01 for the Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-water Reactors | 27 July 2004 | Day Response to NRC Bulletin 2004-01 for the Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-water Reactors | Boric Acid Non-Destructive Examination VT-2 Stress corrosion cracking Liquid penetrant Pressure Boundary Leakage Through-Wall Leakage Operational leakage |
HNP-04-099, Withdrawal of the Relief Request to Use the Frequency of ASME OM Code Case OMN-13 for the Visual Examination of Snubbers | 11 August 2004 | Withdrawal of the Relief Request to Use the Frequency of ASME OM Code Case OMN-13 for the Visual Examination of Snubbers | |
HNP-04-105, NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations | 13 July 2004 | NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
HNP-04-110, Security Order EA-03-086, Response to Request for Additional Information on Security Training and Qualification Plan | 22 July 2004 | Security Order EA-03-086, Response to Request for Additional Information on Security Training and Qualification Plan | |
HNP-04-118, July 2004 Monthly Operating Report for Shearon Harris | 9 August 2004 | July 2004 Monthly Operating Report for Shearon Harris | |