Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20055G495 | 31 July 1990 | Decommissioning Financial Assurance Certification Rept | |
ML20058G348 | 31 October 1993 | Nonproprietary VIPRE/WRB-1 DNBR Thermal Limit for Westinghouse Fuel Types, for Oct 1993 | |
ML20058G677 | 29 September 1993 | Rev 0 to Project Assignment 91-006, Connecticut Yankee Event V Mods | |
ML20058L741 | 15 July 1993 | QA Svcs Dept Surveillance Rept SS-169, Assessment of Fitness for Duty Program | Fitness for Duty |
ML20062G495 | 31 July 1990 | Rev 3 to Northeast Utils USNRC Read & Sign | |
ML20064G589 | 31 December 1982 | Pressurizer Safety & Relief Line Piping & Support Evaluation,Callaway Unit 1 & Wolf Creek Unit | Loop seal Earthquake |
ML20065Q357 | 26 August 1981 | Greater Commitment Needed to Solve Continuing Problems at TMI, Rept to Congress | |
ML20069G117 | 30 June 1982 | Spent Fuel Transportation Routing Plan for Transhipment from Surry Nuclear Power Station,Units 1 & 2 to North Anna Station,Units 1 & 2 | |
ML20071E684 | 10 March 1983 | Rept of Independent Review of Environ Qualification Programs to NUREG-0588 | Boric Acid Ultimate heat sink Coast down |
ML20071L240 | 21 September 1982 | Rev 1 to Evaluation of Three Legged Pipe Whip Restraint Sys | |
ML20071N232 | 30 April 1983 | Rept on Effects of Discrepancies in Ghosh Computer Program Used by S&W & in Labeling of Rocking Acceleration Units on Design of Shoreham Nuclear Power Station - Unit 1 | Safe Shutdown |
ML20072A476 | 9 May 1983 | Rev 3 to 180-Day Rept in Response to IE Bulletin 80-11 for Dresden 2 & 3 & Quad Cities 1 & 2 | |
ML20072B796 | 15 February 1983 | Control Room Review Plan for Oconee,Mcguire & Catawba Nuclear Stations,Duke Power Co | Post Accident Monitoring |
ML20072K817 | 31 May 1983 | Rev 0 to Dresden Nuclear Power Station,Units 2 & 3,Plant- Unique Analysis Rept,Vol 3,Vent Sys Analysis | Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML20072L341 | 7 July 1983 | Rev 0 to Auditable Link Document for Byron Unit 1 | Boric Acid Backfit |
ML20072L348 | 20 June 1983 | Rev 0 to Environ Qualification of Mechanical Equipment for Comm Ed Byron Units 1 & 2,Braidwood Units 1 & 2 Component Pacific Safety Injection Pump Model 3-Inch 10 Stage Jhf | |
ML20072L351 | 10 June 1983 | Pump & Valve Operability Summary | Hydrostatic |
ML20072L363 | 7 July 1983 | Environ Qualification for Class IE Lead Acid Storage Batteries | Safe Shutdown Earthquake Earthquake |
ML20072N827 | 31 May 1983 | Plant-Unique Analysis Rept,Vol 1,General Criteria & Methodology | Safe Shutdown Earthquake Earthquake |
ML20072N843 | 31 May 1983 | Plant Unique Analysis Rept,Vol 2,Suppression Chamber Analysis | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake |
ML20072N854 | 31 May 1983 | Plant Unique Analysis Rept,Vol 3,Vent Sys Analysis | Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML20072N877 | 31 May 1983 | Plant Unique Analysis Rept,Vol 4,Internal Structures Analysis | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20072N898 | 27 June 1983 | Plant Unique Analysis Rept, Vol 5,Safety Relief Valve Discharge Piping Analysis | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Finite Element Analysis |
ML20072N925 | 31 May 1983 | Plant Unique Analysis Rept,Vol 6,Unit 1 Torus Attached Piping & Suppression Chamber Penetration Analysis | |
ML20072N953 | 31 May 1983 | Plant Unique Analysis Rept,Vol 7,Unit 2 Torus Attached Piping & Suppression Chamber Penetration Analysis | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake FLEX Design basis earthquake Earthquake |
ML20074B073 | 30 April 1983 | Preliminary Design Assessment of Byron/Braidwood Generating Station Control Room Human Factors Engineering Review, Suppls I & II | Boric Acid Emergency Lighting Backfit |
ML20076C992 | 6 July 1982 | Energy,Inc/Ferguson,Inc Audit Rept of Sargent & Lundy for Comm Ed | Safe Shutdown |
ML20076D015 | 17 November 1982 | Rept on INPO Self-Initiated Evaluation for Byron & Braidwood Nuclear Station Const Projects | Boric Acid Coatings Nondestructive Examination Liquid penetrant Fire Protection Program Scaffolding |
ML20076D046 | 6 October 1981 | Rept of 810929-30 Audit to Verify Sargent & Lundy Conformance to NUREG-0588 Re Environ Qualification of Class IE Electrical Equipment | |
ML20076D074 | 23 March 1983 | Rept of 830307-15 Audit to Evaluate Sargent & Lundy QA Program Implementation & Adequacy of Facility Design | |
ML20076D111 | 17 June 1982 | Rept of 820607-11 Audit Re Sargent & Lundy QA Program Implementation & Evaluation of Adequacy of Mechanical, Electrical & Structural Design of Facilities.Related Info Encl | Battery sizing |
ML20076D131 | 29 October 1982 | Rev 3 to Interface Control Agreement,Westinghouse Piping & Structural Evaluation Program for Byron Station Unit 1 | |
ML20076D144 | 16 July 1980 | Rev 0 to Auxiliary Feedwater Sys Design Review Rept. Util QA Statement Re Verification of Adequacy of Design & Const of Byron Unit 1 Encl | |
ML20076D148 | 4 April 1983 | Design Evaluation (Audit) Rept of Sargent & Lundy for Comm Ed | |
ML20076L186 | 30 September 1982 | Rev 1 to Improved Dynamic Vacuum Breaker Valve Response for Quad Cities 1 & 2 | |
ML20077B251 | 5 June 1981 | Sequence of Events Re Mispositioned high-head Safety Injection Common Suction Valve | |
ML20079G384 | 31 December 1983 | Purge Valve Operability Rept,Snupps Project | |
ML20079G506 | 13 January 1984 | Rev 1 to SAR for Safety Parameter Display Sys | Boric Acid |
ML20079Q396 | 27 January 1984 | Rev 1 to Rept on Control of Heavy Loads | Control of Heavy Loads |
ML20079R072 | 31 December 1977 | Project Cost & Schedule,Forecast 4 | Coatings Turbine Missile Backfit |
ML20079R088 | 28 February 1978 | Project Status,Feb 1978. Related Info Encl | |
ML20079R098 | 31 July 1979 | Project Status Rept,Jul 1979. Related Info Encl | |
ML20080E698 | 18 August 1980 | Audit Trend Analysis. Related Info Encl | |
ML20080S641 | 31 January 1984 | Rept on Waterford 3/Grand Gulf Study Prepared for State of La Psc | |
ML20080T285 | 25 January 1984 | Table of Pressurizer Design Data. Related Info Encl | |
ML20080U454 | 29 February 1984 | Rev 10 to Analysis of Hydrogen Control Measures at McGuire Nuclear Station | |
ML20081C069 | 30 April 1983 | Analyses of Steam Generator for Tube Ruptures in Arkansas Nuclear One Unit 2, Apr 1983 | |
ML20081C472 | 12 March 1984 | Design Review of Connecting Rod Bearing Shells for Transamerica Delaval Enterprise Engines | Nondestructive Examination Finite Element Analysis |
ML20081L689 | 29 August 1983 | Excerpt from Draft FSAR Section 5.2.8, Inservice Insp Program, & Section 5.2.8.1 Provisions for Access to Rcpb | |
ML20083A829 | 1 June 1982 | Response of Limitorque In-Containment Motors to Byron/ Braidwood High-Energy Line Break/Loca Environ |