MONTHYEARML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20135D4261997-01-31031 January 1997 Criticality Analysis of Beaver Valley Unit 1 Fresh Fuel Racks ML20236W7411996-12-30030 December 1996 Rev 1,change 1 to Performance Demonstration Initiative (PDI) Program Description ML20196B8771996-12-16016 December 1996 First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961231 Between Toledo Edison Co & Mellon Bank ML20196B8951996-12-16016 December 1996 First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961216 Between Cleveland Electric Illuminating Co & Mellon Bank ML20195C9891996-10-0404 October 1996 BVPS-2 Containment Penetrations Overpressure Protection Analysis/Review Rept ML20116J0771996-07-31031 July 1996 Rev 1 to Beaver Valley Unit 1 1996 Alternate Repair Criteria 90 Day Rept ML20116H9821996-06-30030 June 1996 Fitness-For-Duty Program for Jan-June 1996 ML20097C8371996-01-31031 January 1996 USI A-46 Seismic Evaluation Rept for BVPS Unit 1 ML20097C8431996-01-31031 January 1996 USI A-46 Relay Evaluation Rept for BVPS Unit 1 ML20095J6361995-12-31031 December 1995 BVPS Unit 2 Simulator Four Yr Certification Rept 1992 - 1995 ML20196B7871995-04-21021 April 1995 Pennsylvania Power Co Master Decommissioning Trust Agreement for Beaver Valley Power Station & Perry Nuclear Power Plant ML20087G1101995-02-28028 February 1995 Interim Plugging Criteria Return to Power Ltr Rept ML20080Q3441995-02-23023 February 1995 Protection Against Malevolent Use of Vehicles at Nuclear Power Plants ML20078Q5271994-12-13013 December 1994 Simulator Four Yr Certification Rept 1991-94 ML20196B8501993-07-0101 July 1993 Ohio Edison Co Master Decommissioning Trust Agreement for Perry Nuclear Power Plant Unit One,Perry Nuclear Power Plant Unit Two,Beaver Valley Power Station Unit One & Beaver Valley Power Station Unit Two ML17352A8691993-05-31031 May 1993 Technical Rept, Assessment of Aging Degradation of Civil/ Structural Features at Selected Operating Nuclear Power Plants. ML20116G5891992-09-28028 September 1992 SFP Mod for Increased Storage Capacity BVPS Unit 1 ML20090M5281992-03-17017 March 1992 Rev 0 to PRA Individual Plant Exam Summary Rept ML20100P9581992-01-27027 January 1992 Rev 0 to Assessment of Doses in Unit 2 Control Room Due to Locked Rotor Accident at Unit 2 Assuming 18% Failed Fuel ML20090B3081991-12-31031 December 1991 Control Room X/Q Values for Beaver Valley Power Station ML20087A1661991-12-30030 December 1991 Simulator Certification Rept,Beaver Valley Power Station, Unit 2 ML20094G7521991-09-0404 September 1991 Offsite Dose Consequences of Locked Rotor Accident at Unit 2 w/18% Failed Fuel Analysis ML20079L1761991-08-31031 August 1991 Plant Safety Evaluation for Beaver Valley Power Station, Unit 2,VANTAGE 5H Fuel Upgrade, for Aug 1991 ML20079A9671991-05-31031 May 1991 Evaluation of Adequacy of Existing Neutron Flux Instrumentation for NUREG-0737,Suppl 1 ML20067E4001991-01-17017 January 1991 Evaluation of Main Feedwater Piping Misalignment & Steam Generator Nozzle Cracking Final Rept ML20066C4861990-12-18018 December 1990 Simulator Certification Rept ML20077Q3241990-11-30030 November 1990 Development of Pressure-Temp Limit Curves for Loop Isolated from Reactor Vessel:Beaver Valley Units 1 & 2 ML17347B4621989-12-31031 December 1989 App a to USI A-46 & Generic Ltr 87-02. ML20246D6871989-08-14014 August 1989 Rev 1 to Criticality Analysis of Byron & Braidwood Station High Density Fuel Racks ML19327B4011989-07-31031 July 1989 Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel. ML18008A0311989-07-31031 July 1989 NTH-TR-01 Decrease in Heat Removal by Secondary Sys. ML20247H0711989-06-30030 June 1989 Description & Verification Summary of Computer Program, Gappipe ML20246D6711989-06-30030 June 1989 Criticality Analysis of Byron/Braidwood Fresh Fuel Racks ML20247H0791989-06-22022 June 1989 App to Description & Verification Summary of Computer Program,Gappipe ML20247N0621989-05-31031 May 1989 Production Training Dept,Braidwood,Malfunctions & Initial Conditions ML20247K3011989-05-12012 May 1989 Leak-Before-Break Evaluation for Carbon Steel Piping ML20247L1841989-05-12012 May 1989 Leak-Before-Break Evaluation for Stainless Steel Piping, Byron & Braidwood Nuclear Power Stations Units 1 & 2 ML20246E8281989-05-0404 May 1989 Dcrdr Second Supplemental Summary Rept ML18094A3551989-04-30030 April 1989 Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles. ML20246K4541989-04-30030 April 1989 Plant Safety Evaluation for Beaver Valley Power Station Unit 1 Fuel Upgrade & Increased Peaking Factors. Related Info,Including Recommended Mods to Facility Fsar,Encl ML20247F1321989-03-23023 March 1989 Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment ML20005G4211989-02-28028 February 1989 Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation. ML17251A4811989-02-28028 February 1989 Ultrasonic Indication Sizing Technique Development. Related Info Encl ML20206C7451988-11-30030 November 1988 ATWS Mitigation Sys Specific Design for Byron/Braidwood Stations, Rev 5 ML20205T7501988-11-0404 November 1988 Detection & Skin Dose Evaluation for Characteristic X-Ray in Activation Product Contamination ML20206K3021988-10-31031 October 1988 Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Peach Bottom Atomic Power Station Unit 3 1999-01-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
,
y x
.s .
[ ,
BEAVER VALLEY PC',:ER STATION
' '""'?
HHSI C0te10ti SUCTION VALVE MISPOSIT10NED SE0UENCE OF EVENTS ., ,
Friday, 6/5/81 ,,
, 0900(approx) Routine operator tour finds chabs and locks removed from Auxiliary Feedwater Pump local, manual suction valves. Valves found in proper (open) position.
DLC investigation. Valves immediately relocked. Considered as possible operator oversight.
1630(approx) Auxiliary operator observes HHSI common suction valve (SI-26) open. Does not recall if valve handwheel was chained and locked 1630-1645 Same auxiliary operator participates in SI accumulator fill .
(approx) from same building area as contains SI-26. Accumulator fill flowpath is through SI-26. Added about 45 gallons to accumulator from RWST.
4 -Saturday, 6/6/81 0100 Auxiliary Operator finds SI-26 shut, chain and padlock missing; notifies control room. SR0 dispatched to scene, valve reopened
~
and relocked.
4 0115 Shift Supervisor notifies station Operations Supervisor at home.
Operators initiate valve alignment checks for all ESF manual valves.
0120 Security force notified by Shift Supervisor and is directed to isolate Auxiliary Building.
0140 HQ:D0 and SRI notified by Shift Supervisor l 0145 Shift Supervisor implements "two man rule" for access to auxiliary building.
, 0215(approx) Doors to auxiliary building, switchgear rooms, EDGs locked out on computer; guard posted'at auxiliary building door to restrict
-access to operations and security personnel only.
[ 0220 Operators verify alignment of main control board valve iridicaticns I 0300 Check of ESF valve alignments for containment spray and HHSI systems complete. No misalignments identified 0338 Security search of auxiliary building complete; nothing abnonnal i
found.
l 0430 AFW system valves verified in proper ' alignment.
. S!.b ~3 34 0 0 - y r 2. 8307250025 830505 PDR FOIA SHOLLY82-530 PDR
~
/
f&
[;g SEQUETCE OF EVENTS 0630 (approx) - SRI arrives onsite, briefed by Shift Supervisor, reviews 0800 plant status and licensee response. ..
0800 (est) SRI informs HQ;D0 that he is onsite for followup and will contact RI management 0820 (approx) SRI briefs RPS No. 2A Section Chief 0840 (approx) SRI briefs Security Section Chief Licensee management arrives onsite & begin review. SRI advises 0900 - 1030 (approx) licensee of need for' prompt FBI notification and licensee followup actions. SRI has further update telecons with RI management 1030-1130 SRI offsite 1130-1330 Additional SRI discussions with RI management and licensee managemen re licensee need to notify FBI.
SRI reviews licensee actions / verifies completion of valve lineup checks, establishment of additional security tours, implementation of two man rule, lockout of vital area doors, performarice of supplemental operator tours.
1330 (approx) Licensee notifies FBI. SRI informs RI management of notification.
1530(approx) FBI arrives onsite.
1530-2030 SRI and licensee management brief agents, escort to valve locations. Agents collect possible physical evidence.
DLC and FBI review licensee search and security measures; I SRI monitors.
Sunday, 6/7/81 0830-0930 SRI arrives onsite. Confirms plant and security status, (approx) reviews logs and receives update br.iefing from Shift Super-visor.
1000-1300 SRI tours plant with Shift Supervisor. Verifies manual locked (approx) ESF valves properly positioned, emergency bus MCCs properly aligned, selected instrumentation valved in for ECCS and AFW systems, visually checked containment isolation valves and electrical penetration integrity, visually checked main control board instrumentation and equipment status lites, inspected cable tunnels, switchgear rooms, auxiliary building for abnormal conditions, verified security measures implemented in auxiliary building. Reviewed scope of licensee equipment verifications with plant operators.
y-1400 SRI updates R1 manacement and departs site ,
O s
l y-C BVPS-1 SE0DENCE OF EVENTS-
~ -
3630-1730 RI Investigator briefed by SRI- .
(approx) 1730 -1900 Investigator and SRI inspect valve areas with licensee (approx) security supervisor. Discuss incident and plant status with operators. .
-Investigator and SRI brief RI managemen.t, depart site.
1900-1920 (ePprox) 9
!k:nday, 6/8/81 .
SRI and RRI verify security measures [, door lockouts, two maumle'talcSritYus switch
/ patrol ~ tours.
Verify proper alignment / normal conditions for vi gear, process and protection instrumentation racks, main control board;instru-
- mentation 'and indications, RWST area conditions and valves. -
Tuesday, 6/9/81 SRP and RRI verify licensee compliance with I AL 81-25, valve alignments and breaker positions'in EDG rooms, RWST area, main intake structure, main Cardox room, primary makeup pump room, chemical addition (containment spray) room, control room, various MCC rooms.
Wednesday, 6/30/81 ,
SRI and RRI verify licensee compliance with I AL 81-25, valve alignments and breaker positions in auxiliary building (ECCS, AFW, vital switchge
! board instrumentation and indications.