05000254/LER-1994-016, Forwards LER 94-016,Rev 0 for Plant.Licensee Commitments Listed | 22 December 1994 | Forwards LER 94-016,Rev 0 for Plant.Licensee Commitments Listed | |
05000254/LER-1995-001, Informs of Two Addl Commitments to Be Made Re LER 95-001,rev 0 | 31 January 1995 | Informs of Two Addl Commitments to Be Made Re LER 95-001,rev 0 | |
05000254/LER-1995-004, Forwards LER 95-004.Listed Commitments Made,Including Updating Vendor Technical Manual CO099, GE Protective Relays & Accessories | 28 April 1995 | Forwards LER 95-004.Listed Commitments Made,Including Updating Vendor Technical Manual CO099, GE Protective Relays & Accessories | |
05000254/LER-1996-003, Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure | 20 March 1996 | Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure | |
05000254/LER-1996-008, Forwards LER 96-008,Rev 00 & Makes Following Commitment: Procedure Qcts 0600-34 Will Be Revised to Ensure Appropriate Vent Path Exists When Leak Rate Testing 2251(2)-81A/B Panels | 27 June 1996 | Forwards LER 96-008,Rev 00 & Makes Following Commitment: Procedure Qcts 0600-34 Will Be Revised to Ensure Appropriate Vent Path Exists When Leak Rate Testing 2251(2)-81A/B Panels | |
05000254/LER-1996-011, Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated | 6 August 1996 | Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated | Hot Short Safe Shutdown |
05000254/LER-1996-012, Forwards LER 96-012-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items within Component Classification Program & Ensure Resolution of Items.Plan Will Be Completed by 970301 | 30 August 1996 | Forwards LER 96-012-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items within Component Classification Program & Ensure Resolution of Items.Plan Will Be Completed by 970301 | |
05000254/LER-1996-013, Forwards LER 96-013,Rev 0 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed | 11 September 1996 | Forwards LER 96-013,Rev 0 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed | Zebra Mussel |
05000254/LER-1996-014, Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed | 24 October 1996 | Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed | |
05000254/LER-1996-015, Forwards LER 96-015-00.Commits to Completion Review of All Pipe Whip & Vibration Restraint Configuations by 961231 | 11 September 1996 | Forwards LER 96-015-00.Commits to Completion Review of All Pipe Whip & Vibration Restraint Configuations by 961231 | |
05000254/LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items | 13 September 1996 | Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items | |
05000254/LER-1996-018, Forwards Supplemental Info Re LER 96-018-00,correcting Editorial Error | 4 October 1996 | Forwards Supplemental Info Re LER 96-018-00,correcting Editorial Error | Missed surveillance |
05000254/LER-1996-019, Forwards LER 96-019 IAW Requirements of 10CFR50.73(a)(2)(ii)(B) & Discusses Listed Commitments | 4 October 1996 | Forwards LER 96-019 IAW Requirements of 10CFR50.73(a)(2)(ii)(B) & Discusses Listed Commitments | |
05000254/LER-1996-020, Forwards LER 96-020-00.Commitments Included in LER & Submitted | 7 October 1996 | Forwards LER 96-020-00.Commitments Included in LER & Submitted | |
05000254/LER-1996-021, Forwards LER 96-021-00,for Quad Cities Nuclear Power Station.No Commitments Being Made | 6 November 1996 | Forwards LER 96-021-00,for Quad Cities Nuclear Power Station.No Commitments Being Made | |
05000254/LER-1996-022, Submits Corrective Action Plan for LER 96-022-00 Re Inoperable Control Room Emergency Ventilation Sys | 17 March 1997 | Submits Corrective Action Plan for LER 96-022-00 Re Inoperable Control Room Emergency Ventilation Sys | |
05000254/LER-1996-023, Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated | 23 December 1996 | Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated | |
05000254/LER-1996-025, Forwards LER 96-025-00 Re Operability Calculations Performed on ECCS Suction Strainers W/Incorrect Head Loss Values | 22 January 1997 | Forwards LER 96-025-00 Re Operability Calculations Performed on ECCS Suction Strainers W/Incorrect Head Loss Values | |
05000254/LER-1997-002, Forwards LER 97-002-00 Documenting Condition That Was Discovered at Quad Cities Nuclear Power Station.Util Commitments Made within Ltr,Listed | 24 February 1997 | Forwards LER 97-002-00 Documenting Condition That Was Discovered at Quad Cities Nuclear Power Station.Util Commitments Made within Ltr,Listed | Unanalyzed Condition |
05000254/LER-1997-003, Forwards LER 97-003-00 IAW 10CFR50.73(a)(2)(v)(B)(D). Procedure Qcap 0307-02, ASME Section XI Repair & Replacement Program Preparation, Attachment a, Section XI Repair/Replacement Program Will Be Revised Re VT-2 | 29 May 1997 | Forwards LER 97-003-00 IAW 10CFR50.73(a)(2)(v)(B)(D). Procedure Qcap 0307-02, ASME Section XI Repair & Replacement Program Preparation, Attachment a, Section XI Repair/Replacement Program Will Be Revised Re VT-2 | VT-2 |
05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments | 15 April 1997 | Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments | |
05000254/LER-1997-006, Forwards LER 97-006,Rev 00 & Submits Commitments Related to LER | 23 April 1997 | Forwards LER 97-006,Rev 00 & Submits Commitments Related to LER | Safe Shutdown |
05000254/LER-1997-008, Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes | 29 April 1997 | Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes | |
05000254/LER-1997-009, Forwards LER 97-009-00 Per 10CFR50.73(a)(2)(v)(D).Commitment Included in Ltr | 22 May 1997 | Forwards LER 97-009-00 Per 10CFR50.73(a)(2)(v)(D).Commitment Included in Ltr | |
05000254/LER-1997-010, Forwards LER 97-010-00 Which Repts Event That Occurred at Quad Cities Nuclear Station,Per 10CFR50.73(a)(2)(v)(D). Commitment Made by Ltr,Submitted | 2 May 1997 | Forwards LER 97-010-00 Which Repts Event That Occurred at Quad Cities Nuclear Station,Per 10CFR50.73(a)(2)(v)(D). Commitment Made by Ltr,Submitted | |
05000254/LER-1997-011, Forwards LER 97-011-00 Re an Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures or Sys That Are Needed to Remove Residual Heat. Commitments Made by Ltr,Submitted | 1 May 1997 | Forwards LER 97-011-00 Re an Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures or Sys That Are Needed to Remove Residual Heat. Commitments Made by Ltr,Submitted | |
05000254/LER-1997-012, Forwards LER 97-012-01,re Issue That It Is Physically Possible for Units 1 & 2 Refuel Bridge Monorail Auxiliary Hoists to Perform Core Alterations.Commitments Made in Rept, Listed | 5 January 1998 | Forwards LER 97-012-01,re Issue That It Is Physically Possible for Units 1 & 2 Refuel Bridge Monorail Auxiliary Hoists to Perform Core Alterations.Commitments Made in Rept, Listed | |
05000254/LER-1997-013, Forwards LER 97-013-00 Re Any Single Cause of Inoperable Independent Train or Channel in Single Sys Designed to Remove Residual Heat.Commitments Made by Ltr,Listed | 8 May 1997 | Forwards LER 97-013-00 Re Any Single Cause of Inoperable Independent Train or Channel in Single Sys Designed to Remove Residual Heat.Commitments Made by Ltr,Listed | |
05000254/LER-1997-014, Forwards LER 97-014-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitment Made by Ltr | 15 May 1997 | Forwards LER 97-014-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitment Made by Ltr | |
05000254/LER-1997-015, Informs NRC of Change of Committed Due Date Contained in LER 97-015,dtd 970812.Station Changing Due Date of Commitment to 990528 | 5 May 1998 | Informs NRC of Change of Committed Due Date Contained in LER 97-015,dtd 970812.Station Changing Due Date of Commitment to 990528 | |
05000254/LER-1997-016, Forwards LER 97-016-00 Re DG Cw IST Requirements Not Being Completed When Inaccurate Predefined Work Request Was Implemented | 3 September 1997 | Forwards LER 97-016-00 Re DG Cw IST Requirements Not Being Completed When Inaccurate Predefined Work Request Was Implemented | |
05000254/LER-1997-017, Forwards LER 97-017-00.Commitment Made by Ltr,Listed | 12 August 1997 | Forwards LER 97-017-00.Commitment Made by Ltr,Listed | |
05000254/LER-1997-019, Forwards LER 97-019-00 Re Event That Occurred at Plant,Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Ltr,Listed | 3 September 1997 | Forwards LER 97-019-00 Re Event That Occurred at Plant,Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Ltr,Listed | |
05000254/LER-1997-020, Forwards LER 97-020-00,reporting Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures.No Commitments Being Made by Ltr | 17 June 1997 | Forwards LER 97-020-00,reporting Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures.No Commitments Being Made by Ltr | |
05000254/LER-1997-021, Forwards LER 97-021-00 IAW 10CFR50.73(a)(2)(v)(A). Commitments Made by Util,Listed | 25 September 1997 | Forwards LER 97-021-00 IAW 10CFR50.73(a)(2)(v)(A). Commitments Made by Util,Listed | Safe Shutdown |
05000254/LER-1997-022, Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed | 12 November 1997 | Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed | |
05000254/LER-1997-023, Forwards LER 97-023-00,which Documents Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed | 25 November 1997 | Forwards LER 97-023-00,which Documents Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed | |
05000254/LER-1997-024, Forwards LER 97-024-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Submitted | 22 December 1997 | Forwards LER 97-024-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Submitted | |
05000254/LER-1997-025, Forwards LER 97-025-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed | 5 December 1997 | Forwards LER 97-025-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed | |
05000254/LER-1997-026, Forwards LER 97-026-01,re Event That Took Place at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr, Listed | 3 February 1998 | Forwards LER 97-026-01,re Event That Took Place at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr, Listed | |
05000254/LER-1997-027, Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed | 16 January 1998 | Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed | |
05000254/LER-1997-029, Forwards LER 97-029-00 Per 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr Listed | 9 January 1998 | Forwards LER 97-029-00 Per 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr Listed | |
05000254/LER-1997-030, Forwards LER 97-030-01 Re Instrument Line Excess Flow Valves Testing Performed at Less than Nominal Reactor Pressure Due to Inadequate Procedures.Ler Provides Addl Info Re Root Cause Analysis.Commitments Made by Util,Listed | 27 March 1998 | Forwards LER 97-030-01 Re Instrument Line Excess Flow Valves Testing Performed at Less than Nominal Reactor Pressure Due to Inadequate Procedures.Ler Provides Addl Info Re Root Cause Analysis.Commitments Made by Util,Listed | |
05000254/LER-1998-001, Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures | 20 March 1998 | Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures | |
05000254/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B),stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Ts.Commitment Made by Ltr Provided | 27 January 1998 | Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B),stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Ts.Commitment Made by Ltr Provided | |
05000254/LER-1998-003, Forwards LER 98-003-00,which Describes Condition Prohibited by Plant Ts.Commitments Made by Ltr,Listed | 3 February 1998 | Forwards LER 98-003-00,which Describes Condition Prohibited by Plant Ts.Commitments Made by Ltr,Listed | |
05000254/LER-1998-004, Forwards LER 98-004-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Listed | 12 February 1998 | Forwards LER 98-004-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Listed | |
05000254/LER-1998-005, Forwards LER 98-005-00 Re Event Which Occurred at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed | 6 March 1998 | Forwards LER 98-005-00 Re Event Which Occurred at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed | |
05000254/LER-1998-006, Forwards LER 98-006-01,re RB Post LOCA Temps.Actions Listed Are Required for Closure of Issue But Are Not Required Prior to Startup | 29 May 1998 | Forwards LER 98-006-01,re RB Post LOCA Temps.Actions Listed Are Required for Closure of Issue But Are Not Required Prior to Startup | |
05000254/LER-1998-007, Forwards LER 98-007-00,re Condition That Was Outside Design Basis of Plant,Per 10CFR50.73(a)(2)(ii)(B).Commitments Made by Ltr,Listed | 11 February 1998 | Forwards LER 98-007-00,re Condition That Was Outside Design Basis of Plant,Per 10CFR50.73(a)(2)(ii)(B).Commitments Made by Ltr,Listed | |