Semantic search

Jump to navigation Jump to search
 Start dateReporting criterionEvent description
05000254/LER-1991-003, Forwards LER 91-003-02.Containment Atmosphere Monitoring Piping & Mark I Support Installation Work Will Be Completed Prior to Startup from Current Forced Outage Q2F4129 May 1996
05000254/LER-1993-00811 August 1993
05000254/LER-1993-00913 August 1993
05000254/LER-1993-01019 August 1993
05000254/LER-1993-01118 August 1993
05000254/LER-1993-01224 August 1993
05000254/LER-1993-01327 August 1993
05000254/LER-1994-002, Forwards LER 94-002-01 Re B CR HVAC Inoperable,Due to Failure of Compressor Motor Contactor.Listed Commitments Made by Ltr19 January 1998
05000254/LER-1994-003, Forwards LER 94-003,Rev 0 Re Not Establishing Continuous Firewatch Following Impairment of Safe Shutdown Path. Commitments Listed18 February 1994
05000254/LER-1994-004, Submits Reproduction of Original Text of LER 94-004 & Suppl Info5 December 1995
05000254/LER-1994-005, Forwards LER 94-005-00.Suppl Rept Will Be Issued,Documenting Valves & Penetrations That Had Excessive Leakage,What Caused Leakage & Corrective Actions11 April 1994
05000254/LER-1994-015, Forwards LER 94-015-00:on 941002,single Loop Operation in Unanalyzed Condition Occurred1 November 1994
05000254/LER-1994-016, Forwards LER 94-016,Rev 0 for Plant.Licensee Commitments Listed22 December 1994
05000254/LER-1995-001, Informs of Two Addl Commitments to Be Made Re LER 95-001,rev 031 January 1995
05000254/LER-1995-004, Forwards LER 95-004.Listed Commitments Made,Including Updating Vendor Technical Manual CO099, GE Protective Relays & Accessories28 April 1995
05000254/LER-1996-003, Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure20 March 1996
05000254/LER-1996-008, Forwards LER 96-008,Rev 00 & Makes Following Commitment: Procedure Qcts 0600-34 Will Be Revised to Ensure Appropriate Vent Path Exists When Leak Rate Testing 2251(2)-81A/B Panels27 June 1996
05000254/LER-1996-011, Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated6 August 1996
05000254/LER-1996-012, Forwards LER 96-012-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items within Component Classification Program & Ensure Resolution of Items.Plan Will Be Completed by 97030130 August 1996
05000254/LER-1996-013, Forwards LER 96-013,Rev 0 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed11 September 1996
05000254/LER-1996-014, Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed24 October 1996
05000254/LER-1996-015, Forwards LER 96-015-00.Commits to Completion Review of All Pipe Whip & Vibration Restraint Configuations by 96123111 September 1996
05000254/LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items13 September 1996
05000254/LER-1996-018, Forwards Supplemental Info Re LER 96-018-00,correcting Editorial Error4 October 1996
05000254/LER-1996-019, Forwards LER 96-019 IAW Requirements of 10CFR50.73(a)(2)(ii)(B) & Discusses Listed Commitments4 October 1996
05000254/LER-1996-020, Forwards LER 96-020-00.Commitments Included in LER & Submitted7 October 1996
05000254/LER-1996-021, Forwards LER 96-021-00,for Quad Cities Nuclear Power Station.No Commitments Being Made6 November 1996
05000254/LER-1996-022, Submits Corrective Action Plan for LER 96-022-00 Re Inoperable Control Room Emergency Ventilation Sys17 March 1997
05000254/LER-1996-023, Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated23 December 1996
05000254/LER-1996-025, Forwards LER 96-025-00 Re Operability Calculations Performed on ECCS Suction Strainers W/Incorrect Head Loss Values22 January 1997
05000254/LER-1997-002, Forwards LER 97-002-00 Documenting Condition That Was Discovered at Quad Cities Nuclear Power Station.Util Commitments Made within Ltr,Listed24 February 1997
05000254/LER-1997-003, Forwards LER 97-003-00 IAW 10CFR50.73(a)(2)(v)(B)(D). Procedure Qcap 0307-02, ASME Section XI Repair & Replacement Program Preparation, Attachment a, Section XI Repair/Replacement Program Will Be Revised Re VT-229 May 1997
05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments15 April 1997
05000254/LER-1997-006, Forwards LER 97-006,Rev 00 & Submits Commitments Related to LER23 April 1997
05000254/LER-1997-008, Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes29 April 1997
05000254/LER-1997-009, Forwards LER 97-009-00 Per 10CFR50.73(a)(2)(v)(D).Commitment Included in Ltr22 May 1997
05000254/LER-1997-010, Forwards LER 97-010-00 Which Repts Event That Occurred at Quad Cities Nuclear Station,Per 10CFR50.73(a)(2)(v)(D). Commitment Made by Ltr,Submitted2 May 1997
05000254/LER-1997-011, Forwards LER 97-011-00 Re an Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures or Sys That Are Needed to Remove Residual Heat. Commitments Made by Ltr,Submitted1 May 1997
05000254/LER-1997-012, Forwards LER 97-012-01,re Issue That It Is Physically Possible for Units 1 & 2 Refuel Bridge Monorail Auxiliary Hoists to Perform Core Alterations.Commitments Made in Rept, Listed5 January 1998
05000254/LER-1997-013, Forwards LER 97-013-00 Re Any Single Cause of Inoperable Independent Train or Channel in Single Sys Designed to Remove Residual Heat.Commitments Made by Ltr,Listed8 May 1997
05000254/LER-1997-014, Forwards LER 97-014-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitment Made by Ltr15 May 1997
05000254/LER-1997-015, Informs NRC of Change of Committed Due Date Contained in LER 97-015,dtd 970812.Station Changing Due Date of Commitment to 9905285 May 1998
05000254/LER-1997-016, Forwards LER 97-016-00 Re DG Cw IST Requirements Not Being Completed When Inaccurate Predefined Work Request Was Implemented3 September 1997
05000254/LER-1997-017, Forwards LER 97-017-00.Commitment Made by Ltr,Listed12 August 1997
05000254/LER-1997-019, Forwards LER 97-019-00 Re Event That Occurred at Plant,Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Ltr,Listed3 September 1997
05000254/LER-1997-020, Forwards LER 97-020-00,reporting Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures.No Commitments Being Made by Ltr17 June 1997
05000254/LER-1997-021, Forwards LER 97-021-00 IAW 10CFR50.73(a)(2)(v)(A). Commitments Made by Util,Listed25 September 1997
05000254/LER-1997-022, Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed12 November 1997
05000254/LER-1997-023, Forwards LER 97-023-00,which Documents Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed25 November 1997
05000254/LER-1997-024, Forwards LER 97-024-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Submitted22 December 1997