Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20125B40026 April 1970Discusses Items Re Request for Div of Compliance Insp Repts for Util
ML20125B4093 August 1972Provides Response to Inquiry Re Bypassing of Engineered Safety Feature at PlantReactor Vessel Water Level
ML20125B41211 July 1972Lists Facility Licensees Due to Be Billed for Annual Fees for Months of Jul,Aug & Sept 1972
ML20125B87314 June 1972Discusses Review of Facility Preliminary Detailed Environ Statement.No Gross Errors Uncovered in Dose Evaluations
ML20125B87618 July 1972Requests Assistance in Resolving Certain Comments Received on Draft Environ statement,specifically,720710 Ltr from EPA
ML20125B87818 December 1972Forwards Review of QA Program for Operations
ML20125B88219 May 1972Informs That Only Item Needed for Preparation of Radiological Impact Portion of Environ Statement Is Numerical Source Term
ML20125B88624 August 1972Forwards Special Rept on Operation of Northern States Power Co,Monticello Reactor Facility, Conducted on 720804
ML20125B8914 May 1972Forwards Realistic Accident Section for Plant Des.Changes Should Be Communicated to E AdensamFuel cladding
ML20125B90512 May 1972Forwards Radwaste Section for Environ Statement
ML20125B90920 March 1973Forwards Second Draft of full-term OL for Plant.Conditions for Protection of Environ Not Included in Draft
ML20125B91321 December 1973Requests Comments on Encl Proposed ETS by 740125.W/o Encl
ML20125B91424 August 1973Forwards Orders & Notices of Availability W/O TS Changes Re Fuel Densification for Listed Plants.W/O Encls
ML20125B91717 January 1973Discusses Conversion of Provisional Operating License to full-term Operating License Under Provisions of 10CFR20.57(a)
ML20125B92126 December 1973Requests That Listed Actions Be Taken Re Radiological Monitoring Program
ML20125B92216 September 1974Discusses Review of Applicant Proposed ETS for Plant. Deficient Areas within TS Noted
ML20125B92412 September 1974Forwards Proposed Meteorological Section for ETS Being Developed for Plant
ML20125B9304 January 1973Informs That an Evaluation & Finding Re Financial Qualifications Was Necessary Re Review of full-term License for Util
ML20125B93820 November 1969Comments on General Conclusion Re Problems Involved in Complying W/Mpca Water Disposal Permit for Util
ML20125B94623 June 1970Forwards Suppl Insp Program for Sensitized Stainless Steel Matls & Welds
ML20125B9599 March 1978Notification of 780314 Meeting W/Util & GE in Bethesda,Md to Resolve Structural Issues Re Review of GE High Density Fuel Storage Sys at Plant
ML20125B96214 November 1969Forwards Evaluation of Instrumentation,Control & Auxiliary Electric Power Sys for Inclusion in Rept Being Prepared for Consideration at Dec Meeting
ML20125B96715 May 1978Discusses Staff Actions in Response to Deficiencies in Connector Splices at Plant on 780510
ML20125B97210 May 1978Discusses Status of Facility Electrical Splice Upgrade
ML20125B97926 April 1978Discusses Staff Actions in Response to Deficiencies in Connector Splices at Facility
ML20125B98519 November 1970Discusses Burial of Radwaste in Minnesota
ML20125B99411 May 1971Forwards Change 1 to TS for Util Re Protection Factors for Use of Respiratory EquipmentHigh Radiation Area
ML20125B99716 January 1978Notification of 780209 Meeting W/Util & GE in Bethesda,Md to Discuss Selection of Fuel Parameter to Appear in TS
ML20125C47516 February 1973Informs That Listed Changes Should Be Indicated on Errata List for Plant Fes
ML20125C48613 July 1978Discusses Proposed ETS for Plant.Failure to Follow Up on Fes Recommendations Could Make Agency Vulnerable in Hearing Situation Associated W/Ftol Issuance
ML20125C51012 October 1976Notification of 921028 Meeting W/Util in Bethesda,Md to Discuss Requested Exemption to Requirements of 10CFR50, App J
ML20125C5212 March 1978Notification of 790309 Meeting W/Mark I Owners Group in Bethesda,Md to Discuss Changes in Mark I Long Term Plan as Reflected in Rev 3 to Mark I Owners Group Program Action Plan
ML20125C52314 June 1967Forwards Ltr W/Newspaper Clipping from FE Klein Submitting Action Deemed Necessary
ML20125C55116 January 1978Notification of 780126 Meeting W/Util & GE in Bethesda,Md to Discuss Selection of Fuel Parameter to Appear in TS
ML20125C55328 January 1971Forwards Amend 1 to Indemnity Agreement B-42.W/o Encl
ML20125D69319 February 1970Informs of Proposed Addl TS That Could Be Included in Plant Provisional OL
ML20126A26410 December 1992Advises That Response to Suppl 1 to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys AcceptableHigh Radiation Area
Fire Barrier
ML20126B17427 September 1973Discusses Util Response to AEC Concern for Possibility That Flooding Could Prevent Safe Shutdown of Reactor or Prevent Engineered Safety Sys from Performing Emergency Function Following Postulated AccidentsSafe Shutdown
ML20126C13326 February 1976Requests Technical Assistance Re Acceptability of Util Radiological Assessment of Cask Drop
ML20126C1372 March 1976Requests Addl Info Re Rept Entitled, Analysis & SE of Spent Fuel Shipping Cask Handling at Monticello Generating PlantSafe Shutdown Earthquake
Earthquake
ML20126C14624 July 1978Suggests Board Be Informed of Monticello Exemption RequestsSafe Shutdown
Anticipated operational occurrence
Hydrostatic
Operating Basis Earthquake
Exemption Request
Earthquake
ML20126C1632 April 1976Forwards SE Accepting Util Request for Change in Main Steam Isolation Pressure Setpoint Value & Operating Min Critical Power Ratio Limits
ML20126C1684 March 1976Forwards Draft Rept, Air Pathway Exposure Model Validation Study at Monticello Nuclear Generating Plant. W/O Encl
ML20126C1878 March 1977Forwards SE Accepting Proposed Pumpback Sys for Plant
ML20126C20611 March 1976Discusses Evaluation of Meteorological Assumptions Made by Util in Cask Drop Analysis for Plant & Concludes That Util Use of Atmospheric Conditions Described in Reg Guide 1.3 Will Result in Conservative X/Q Values
ML20126C20817 March 1976Requests Technical Assistance Re Util Proposed Change to TS to Permit Permit Installation of New Containment Isolation Valve as Part of Proposed Nitrogen Recirculation Sys
ML20126C21118 March 1976Forwards Comments on EPA Draft Rept, Air Pathway Exposure Model Validation Study at Monticello Nuclear Generating Plant
ML20126C21319 March 1976Forwards Comments from Review of Draft Rept of EPA Plume at Plant
ML20126C21622 March 1976Responds to Continuation of ORB-2-210 - Monticello Spent Fuel Cask Drop
ML20126C2238 April 1976Forwards 760325 Memo Which Identifies Potential for Fuel Damage by Operator Error in Either Reactor Cavity of Fuel Pool of GE Bwrs,For Review