Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
GO2-04-174, Resubmittal of Revisions to Physical Security Plan for Columbia Generating Station Pursuant to Order EA-03-0867 October 2004Resubmittal of Revisions to Physical Security Plan for Columbia Generating Station Pursuant to Order EA-03-086
GO2-04-177, License Amendment Request: Control Rod Drop Accident Analysis12 October 2004License Amendment Request: Control Rod Drop Accident AnalysisSafe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Safe Shutdown Earthquake
Enforcement Discretion
Probabilistic Risk Assessment
GO2-04-188, Confirmation of Verbal Agreement for Extension of Response Due Date28 October 2004Confirmation of Verbal Agreement for Extension of Response Due DateSignificance Determination Process
GO2-04-204, Additional Information to Include with Request to Implement 2ISI-29 Addressing ASME Section XI, IWA-5213, Test Condition Holding Times, for the Second Inservice Inspection Interval6 December 2004Additional Information to Include with Request to Implement 2ISI-29 Addressing ASME Section XI, IWA-5213, Test Condition Holding Times, for the Second Inservice Inspection Interval
GO2-05-009, Corrected Page for the License Amendment Request to Revise the Reactor Pressure Vessel Material Surveillance Program13 January 2005Corrected Page for the License Amendment Request to Revise the Reactor Pressure Vessel Material Surveillance ProgramAnticipated operational occurrence
Hydrostatic
GO2-05-020, Request to Implement 2ISI-31 Addressing Use of Subsequent ASME Section XI Edition and Addenda for Code Category C-H4 February 2005Request to Implement 2ISI-31 Addressing Use of Subsequent ASME Section XI Edition and Addenda for Code Category C-HNondestructive Examination
VT-2
Incorporated by reference
GO2-05-030, 2004 Annual Environmental Operating Report15 February 20052004 Annual Environmental Operating Report
GO2-05-032, Changes to Distribution List16 February 2005Changes to Distribution List
GO2-05-044, Notification of Qualification for Performing Neutronic Calculations3 March 2005Notification of Qualification for Performing Neutronic Calculations
GO2-05-050, February 2005 Monthly Operating Report for Columbia Generating Station9 March 2005February 2005 Monthly Operating Report for Columbia Generating Station
GO2-05-054, Response to Request for Additional Information Addressing Chemistry Issues Associated with the Alternative Source Term License Amendment Request16 March 2005Response to Request for Additional Information Addressing Chemistry Issues Associated with the Alternative Source Term License Amendment RequestBoric Acid
Maintenance Rule Program
GO2-05-057, Emergency Technical Specification Change Request for One-Time Extension of Completion Time for Limiting Condition for Operation Condition 3.5.1.B23 March 2005Emergency Technical Specification Change Request for One-Time Extension of Completion Time for Limiting Condition for Operation Condition 3.5.1.BProbabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
GO2-05-061, Submittal of Level of Financial Protection, Annual Reporting Requirement30 March 2005Submittal of Level of Financial Protection, Annual Reporting Requirement
GO2-05-062, Decommissioning Fund Status Report30 March 2005Decommissioning Fund Status Report
GO2-05-065, Review of NRC Violation 50-397/04-05-024 April 2005Review of NRC Violation 50-397/04-05-02
GO2-05-098, Response to NRC Guidance Regarding Mitigation Strategies31 May 2005Response to NRC Guidance Regarding Mitigation StrategiesB.5.b Mitigating Strategies
GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power31 May 2005License Amendment Request to Technical Specifications Associated with AC and DC Electrical PowerSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Hydrostatic
Qualified Offsite Circuit
Emergency Lighting
Incorporated by reference
Battery sizing
Fuel cladding
Offsite Circuit
GO2-05-105, Emergency Response Data System, Change to Data Point Library9 June 2005Emergency Response Data System, Change to Data Point Library
GO2-05-108, CFR 50.46 Report of Significant Changes in Cycle 17 and 18 Emergency Core Cooling System Evaluation Analysis16 June 2005CFR 50.46 Report of Significant Changes in Cycle 17 and 18 Emergency Core Cooling System Evaluation Analysis
GO2-05-126, Emergency Response Data System, Change to Data Point Library19 July 2005Emergency Response Data System, Change to Data Point LibraryMet Tower
GO2-05-138, Notification of Intent to Comply with Order EA-05-0078 August 2005Notification of Intent to Comply with Order EA-05-007RAMQC
GO2-05-142, Response to Inspection Report 05000397-05-00715 August 2005Response to Inspection Report 05000397-05-007
GO2-05-144, Generation Station Physical Security Plan, Revision 217 August 2005Generation Station Physical Security Plan, Revision 2
GO2-05-145, Response to Request for Additional Information Regarding the License Amendment Request for a One-time Extension to Technical Specification 3.7.13 November 2005Response to Request for Additional Information Regarding the License Amendment Request for a One-time Extension to Technical Specification 3.7.1Hot Short
Probabilistic Risk Assessment
Large early release frequency
GO2-05-148, Cycle 18 Core Operating Limits Report Revision 130 August 2005Cycle 18 Core Operating Limits Report Revision 1Anticipated operational occurrence
GO2-05-153, Analytical Evaluation of Inservice Inspection Examination Results15 September 2005Analytical Evaluation of Inservice Inspection Examination Results
GO2-05-157, Voluntary Response to Regulatory Issue Summary 2005-1922 September 2005Voluntary Response to Regulatory Issue Summary 2005-19Generic Fundamentals Examination
GO2-05-166, Submittal of the Third Ten-Year Interval Pump and Valve Inservice Testing (IST) Program Plan10 October 2005Submittal of the Third Ten-Year Interval Pump and Valve Inservice Testing (IST) Program PlanIncorporated by reference
GO2-05-171, Response to Request for Additional Information Regarding February 2002, Order Section B.5.b14 October 2005Response to Request for Additional Information Regarding February 2002, Order Section B.5.bB.5.b Mitigating Strategies
GO2-05-179, Changes to Distribution List4 November 2005Changes to Distribution List
GO2-05-183, 2005 Annual Financial Report11 November 20052005 Annual Financial Report
GO2-05-184, Supplement to the License Amendment Request for a One-Time Extension to Technical Specification 3.7.115 November 2005Supplement to the License Amendment Request for a One-Time Extension to Technical Specification 3.7.1Ultimate heat sink
GO2-05-186, Supplement to the License Amendment Request for a One-Time Change to Technical Specifications30 November 2005Supplement to the License Amendment Request for a One-Time Change to Technical SpecificationsUltimate heat sink
Offsite Circuit
GO2-05-194, Guarantee of Payment of Deferred Premium14 December 2005Guarantee of Payment of Deferred Premium
GO2-05-196, Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-0715 December 2005Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-07Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Scram Discharge Volume
Moisture barrier
Liquid penetrant
Dissimilar Metal Weld
GO2-06-004, Clarification of Response to Request for Additional Information Regarding License Amendment Request for Extension of Diesel Generator Completion Time9 January 2006Clarification of Response to Request for Additional Information Regarding License Amendment Request for Extension of Diesel Generator Completion TimeSafe Shutdown
Fire Protection Program
GO2-06-019, Response to Request for Additional Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power8 February 2006Response to Request for Additional Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical PowerOffsite Circuit
GO2-06-029, Clarification Regarding a Commitment Associated with the License Amendment Request for Extension of Diesel Generator Completion Time23 February 2006Clarification Regarding a Commitment Associated with the License Amendment Request for Extension of Diesel Generator Completion Time
GO2-06-042, Revised Technical Specification Bases Change (for Information) and Summary of Commitments Associated with the License Amendment Requests for Extension of Diesel Generator Completion Time20 March 2006Revised Technical Specification Bases Change (for Information) and Summary of Commitments Associated with the License Amendment Requests for Extension of Diesel Generator Completion TimeSafe Shutdown
Fire Protection Program
GO2-06-043, Response to Request for Additional Information Related to Alternative Source Term License Amendment Request21 March 2006Response to Request for Additional Information Related to Alternative Source Term License Amendment RequestTornado-Generated Missile
Power Operated Valves
Power Uprate
Affidavit
GO2-06-049, Level of Financial Protection Annual Reporting Requirement28 March 2006Level of Financial Protection Annual Reporting Requirement
GO2-06-059, License Amendment Request to Adopt Origen-ARP for Calculating Fuel Pool Decay Heat Load17 April 2006License Amendment Request to Adopt Origen-ARP for Calculating Fuel Pool Decay Heat LoadFunctionality Assessment
Recently irradiated fuel
GO2-06-060, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process17 April 2006Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement ProcessTime of Discovery
Incorporated by reference
GO2-06-061, Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test18 April 2006Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test
GO2-06-062, Correction to Third Ten-Year Interval Inservice Inspection Program Plan27 April 2006Correction to Third Ten-Year Interval Inservice Inspection Program Plan
GO2-06-064, Annual Environmental Operating Report28 April 2006Annual Environmental Operating Report
GO2-06-065, Annual Report of Individual Monitoring28 April 2006Annual Report of Individual Monitoring
GO2-06-073, Transmittal of Columbia Generating Station, 2005 Annual Radiological Environmental Operating Report11 May 2006Transmittal of Columbia Generating Station, 2005 Annual Radiological Environmental Operating ReportAnnual Radiological Environmental Operating Report
GO2-06-080, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Emergency Diesel Generator Surveillance Testing22 May 2006Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Emergency Diesel Generator Surveillance TestingSafe Shutdown
Reactor Vessel Water Level
Fuel cladding
Offsite Circuit
GO2-06-081, Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment22 May 2006Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator EquipmentMururoa