Issue date | Title | Topic | |
---|---|---|---|
IR 05000245/2009007 | 7 April 2009 | IR 05000245-09-007, on 03/11/09, Dominion Nuclear Connecticut, Inc., Millstone Power Station Unit 1, Waterford, CT | |
IR 05000336/2009002 | 14 May 2009 | IR 05000336-09-002, 05000423-09-002; on 01/01/09 - 03/31/09, Millstone Power Station Integrated Inspection Report and Exercise of Enforcement Discretion | High Radiation Area Non-Destructive Examination Fire Barrier Internal Flooding Enforcement Discretion Reserve Station Service Transformer Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Job Performance Measure Operability Determination Fire Protection Program Downpower |
IR 05000336/2009301 | 18 May 2009 | Er 05000336/2009301, January 26 - February 24, 2009, Millstone Power Station, Unit 2, Initial Operator Licensing Examination Report | Job Performance Measure |
ML090750375 | 13 April 2009 | Review of Steam Generator Tube Inspection Report for 2008 Refueling Outage | |
ML090830485 | 6 April 2009 | Request for Additional Information Regarding Temporary Non-Code Repair of the Class 3 Service Water System Emergency Diesel Generator Jacket Water Heat Exchanger and Air Coller Heat Exchanger | |
ML090970397 | 1 April 2009 | Units, 1, 2 & 3; North Anna Units 1 & 2; Surry, Units 1 & 2 and Associated ISFSIs - Submittal of Dominion'S Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage. | |
ML090980064 | 8 April 2009 | Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process | |
ML090980084 | 8 April 2009 | Notice of Public Meeting with Dominion Nuclear Connecticut, Inc. Regarding the Safety Performance of the Millstone Power Station for Calendar Year 2008 | |
ML091050623 | 23 April 2009 | NRC & Neac Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides | |
ML091050660 | 15 April 2009 | Notice of Public Meeting with Nuclear Energy Advisory Council, to Discuss Nrc'S Assessment of Safety Performance of Millstone for Cy 2008 | |
ML091100403 | 8 April 2009 | Comment (1) of Chris L. Funderburk, on Behalf of Dominion Resources Services, Inc., Opposing NRC Regulatory Issue Summary 2009-XX on Implementation of the New Final Rule on Protection of Safeguards Information | |
ML091120006 | 17 April 2009 | NRC Operator Licensing Initial Exam Results, Millstone Power Station, Unit 2 (Cover Letter Publicly Available; Enclosures Non-Public) | |
ML091120121 | 15 April 2009 | Letter Dtd. 4/15/09 from J. T. Spence, Millstone Power Station, Unit 2, Withdrawal of Comments Regarding Question #35; Post Exam Comments and Technical References (Folder 1) | |
ML091170138 | 20 April 2009 | Test Results for Gas-Water Transport Tests | |
ML091200167 | 27 April 2009 | Units 1, 2 & 3; North Anna, Units 1 & 2 and Surry Power, Units 1 & 2 - Submittal of Dominion'S Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, & Independent Spent Fuel Storage Installation (Isfsi). | |
ML091250240 | 5 May 2009 | Response to Request for Additional Information Regarding 10 CFR 50.55a Relief Request 89-65 and 89-66; Temporary Non-Code Repair of the Class 3 Service Water System Emergency Diesel Generator Jacket Water Heat Exchanger and Cooler. | Time of Discovery Nondestructive Examination |
ML091260159 | 6 May 2009 | Senior Reactor and Reactor Operator Initial Examinations - (Millstone Power Station, Unit 3) | |
ML091270250 | 30 April 2009 | Final Qa/Related Forms (Folder 1) | |
ML091280232 | 7 May 2009 | Summary of April 23, 2009, Annual Assessment Meeting with Dominion Nuclear Connecticut, Inc. and the Connecticut Nuclear Energy Advisory Council (Neac) | |
ML091310428 | 5 June 2009 | Request for Withholding Information from Public Disclosure | |
ML091310666 | 28 April 2009 | Third 10-year Interval Inservice Inspection Program and Associated Proposed Alternatives and Relief Requests | Boric Acid High Radiation Area Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld DM weld Scaffolding Weak link |
ML091320343 | 4 April 2009 | Independent Spent Fuel Storage Installation, Submittal of Cask Registration for Spent Fuel Storage | |
ML091320460 | 28 April 2009 | 2008 Occupational Radiation Exposure Information | |
ML091320561 | 27 April 2009 | Annual Environmental Protection Plan Operating Report | Grab sample |
ML091330240 | 30 April 2009 | 2008 Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Power change |
ML091330638 | 13 May 2009 | Ltr. to Mr. John Caruso, Dated 5/13/09, Plan for Reactor Operators Return to Active Status | |
ML091340133 | 15 May 2009 | Notice of Forthcoming Meeting with Dominion Nuclear Connecticut, Inc. to Discuss the Submittal of a License Amendment Request Regarding the Removal of Charging Pumps from the Technical Specifications for Millstone Power Station, Unit No. 2 | |
ML091340263 | 23 April 2009 | ISFSI - Major Revision 005, Minor Revision 0 to Emergency Plan Procedure, MP-26-EPI-FAP02, Technical Support Center Activation and Operation | Severe Accident Management Guideline Minimum staff |
ML091350217 | 30 April 2009 | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl Fuel cladding |
ML091380505 | 6 May 2009 | Burton V. USNRC; No. 09-1901-ag - Petition to Review an Order | |
ML091410449 | 11 May 2009 | Correction to Date of Letter Serial No. 09-248 Independent Spent Fuel Storage Installation Submittal of Cask Registration for Spent Fuel Storage | |
ML091520618 | 28 May 2009 | ISFSI, Proposed Change to Emergency Plan | |
ML091540017 | 27 May 2009 | ISFSI - Major Revision 007, Minor Revision 0, to Emergency Plan Procedure, MP-26-EPI-FAP07, Notifications and Communications | Fitness for Duty Met Tower Earthquake |
ML091540203 | 20 May 2009 | Response to Request for Additional Information 2008 Steam Generator Tube Inspections | |
ML091540204 | 29 May 2009 | Comment (1) of Raymond A. West on Behalf of Dominion Resources Services, Inc., on Draft Regulatory Guide DG-1192 - Request for Inclusion of ASME Code Case N-513-3 - (Proposed Revision 16 of Regulatory Guide 1.147, Dated October 2007) | Functionality Assessment |
ML091590226 | 25 June 2009 | Summary of May 26, 2009, Category 1 Pre-Application Meeting with Dominion to Discuss the Proposed License Amendment Request Regarding Charging Pumps at Millstone Power Station, Unit No. 2 | |
ML091590236 | 4 June 2009 | ISFSI, North Anna, Units 1, 2, & ISFSI, Surry, Units 1, 2, & ISFSI, Kewaunee & ISFSI, Correspondence Distribution Request Change Update | |
ML091600055 | 5 June 2009 | Requalification Program Inspection Millstone Power Station, Unit 3 | |
ML091690652 | 18 June 2009 | Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 | |
ML091740450 | 23 June 2009 | Email Regarding Electronic Copy of Presentation Material for MPS2 | |
ML091740456 | 22 June 2009 | Request to Return Electronic Copy of Presentation | |
ML091750997 | 25 June 2009 | Acceptance Review Regarding Third 10 Year Inservice Inspection Program Interval | |
ML091751014 | 24 June 2009 | Acceptance Review for RR for Temporary Non-Code Repair | |
ML091801066 | 25 June 2009 | ISFSI, Millstone, Units 1, 2, 3 and ISFSI, North Anna, Units 1, 2 and Isfsl, Surry, Units 1 and 2 and Isfsl, SGI and OUO Correspondence Distribution Request Update | |
ML091810677 | 30 June 2009 | Clarification Needed on MPS3 ISI Intervak RR No. IR-3-08 | |
ML091820272 | 30 June 2009 | Submittal of 2008 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 | Loop seal |
ML091870823 | 22 May 2009 | Fauske and Associates LLC Letter from Robert E. Henry, 05/22/2009 Response to NRC Request for Fai Proprietary Report (09-44) and Non-Proprietary Version (09-44R) Dated 03/20/2009 | |
ML091880510 | 25 June 2009 | Update of Information Pertaining to Foreign Interests | |
ML091900366 | 23 June 2009 | Comment (36) of C.L. Funderburk on Behalf of Dominion on Draft Regulatory Guide DG-4014, Radiological Surveys and Monitoring During Operations. in Regards to Pr 20,30,40,50,70 and 72, Decommissioning Planning | |
ML091910459 | 22 May 2009 | Enclosure 3 - Fauske and Associates LLC Letter from Robert E. Henry, May 22, 2009 Application for Withholding AW-09-01 with Proprietary Information Notice and One Copy of Affidavit |