Summary of May 26, 2009, Category 1 Pre-Application Meeting with Dominion to Discuss the Proposed License Amendment Request Regarding Charging Pumps at Millstone Power Station, Unit No. 2
ML091590226
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/25/2009
From: Sanders C
Plant Licensing Branch 1
To: Heacock D
Dominion Nuclear Connecticut
Sanders, Carleen, NRR/DORL 415-1603
References
FOIA/PA-2011-0115
Download: ML091590226 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 June 25, 2009 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glenn Allen, VA 23060

SUBJECT:

SUMMARY

OF MAY 26,2009, CATEGORY 1 PRE-APPLICATION MEETING WITH DOMINION TO DISCUSS THE PROPOSED LICENSE AMENDMENT REQUEST REGARDING CHARGING PUMPS AT MILLSTONE POWER STATION, UNIT NO.2

Dear Mr. Heacock:

On May 26,2009, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) staff and representatives of Dominion Nuclear Connecticut, Inc. (DNC) at the NRC Headquarters, 11555 Rockville Pike, Rockville, Maryland. The purpose of the pre application meeting was to discuss a planned license amendment request (LAR) regarding the removal of a charging pump surveillance requirement from the Technical Specifications (TSs) currently in place at the Millstone Power Station, Unit NO.2 (MPS2). A notice for this meeting was issued on May 15, 2009, and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML091340133. A list of attendees is enclosed.

DNC's presentation can be found at ADAMS Accession No. ML091590175.

The presentation to the NRC staff included a description of the recent history of the charging pump TSs, including the withdrawal of a 2007 LAR regarding the removal of the same charging pump surveillance requirement. DNC discussed how the charging pumps are credited in the Updated Final Safety Analysis Report (UFSAR) accident analysis and how the accident types can be handled without the use of the charging pumps. DNC discussed removing the charging pump from the UFSAR without prior NRC approval using chapter 10 of the Code of Federal Regulation Section 50.59 (10 CFR 50.59). DNC also discussed their intention to move the charging pump surveillance requirement to the Technical Requirements Manual, using the license amendment process, which they stated would lessen the confusion about the charging pump surveillance requirement.

The NRC staff gave DNC feedback on the presentation. The NRC staff expressed concerns with the accident scenario calculations, in particular the calculations used as the basis for the revision of the UFSAR accident analysis. The NRC staff's concerns were focused on the methodology used to complete the updated calculations. NRC staff cautioned that removing the credit for the charging pumps from the UFSAR may not be able to be done without prior NRC approval. No regulatory decisions were made at the meeting by the NRC.

Several members of the public were present for the meeting via telecon. No attendees chose to complete the Public Meeting Feedback Forms (NRC Form 659), which were available at the meeting.

D. Heacock -2 Please direct any inquiries to Carleen J. Sanders at 301-415-1603.

Sincerely, Carleen J. anders, Project Manager Plant Lice ing Branch 1-2 Division of perating Reactor Licensing Office of Nuclear Reactor Regulation

Enclosure:

As stated cc/encl: Distribution via Listserv

LIST OF ATTENDEES CATEGORY 1 PRE-APPLICATION MEETING WITH DOMINION NUCLEAR CONNECTICUT, INC.

REGARDING MILLSTONE POWER STATION, UNIT NO.2 CHARGING PUMPS May 26,2009 Organization John Hughey NRC Andrew Howe NRC Erika Lee NRC Jeff Whited NRC Harold Chernoff NRC Len Ward NRC Sam Miranda NRC David Beaulieu NRC Matthew Hamm NRC Carleen Sanders NRC Brian Haagensen NRC Anthony Markley NRC David Bucheit DNC Richard MacManus DNC Chris Funderburk DNC Delbert Horn DNC Dave Bajumpaa DNC William Bartron DNC Wanda Craft DNC Rich Mcintosh DNC Pat Daddona New London Day Nancy Burton Connecticut Coalition Against Millstone

D. Heacock -2 Please direct any inquiries to Carleen J. Sanders at 301-415-1603.

Sincerely,

/raj Carleen J. Sanders, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Enclosures:

As stated cc/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL 1-2 R/F RidsAcrsAcnw_MailCTR Resource LTrocine, EDO R-1 RidsNrrDorl Resource RidsNrrDorlLpl1-2 Resource RidsNrrPMCSanders Resource RidsNrrPMJHughey Resource RidsNrrLAABaxter Resource RidsOgcMailCenter Resource RidsRgn1 MailCenter Resource RBellamy, RI DHarrison, NRR AMendiola, NRR GCranston, NRR MMurphy, NRR CTucci, NRR AHowe, NRR ELee, NRR JWhited, NRR LWard, NRR SMiranda, NRR MHamm, NRR DBeaulieu, NRR ADAMS Accession No ML091590226 OFFICE LPL1-2/PM LPL 1-2/LA SRXB/BC LPL 1-2/BC NAME CSanders ABaxter GCranston HChernoff DATE 06/15/2009 06/15/2009 6123109 6/25/09 Official Agency Record