Acceptance Review for RR for Temporary Non-Code Repair
ML091751014
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/24/2009
From: Sanders C
Plant Licensing Branch 1
To: Chernoff H
Plant Licensing Branch 1
Sandeers, Carleen, NRR/DORL, 415-1603
References
FOIA/PA-2011-0115
Download: ML091751014 (2)


Text

From:

Sanders, Carleen Sent:

Wednesday, June 24, 2009 3:46 PM To:

Chernoff, Harold

Subject:

FW: Acceptance Review for RR for Temporary Non-Code Repair ADAMSAccessionNumber:

ML091750205 See acceptance review below Carleen From: Carleen Sanders Sent: Thursday, February 19, 2009 1:28 PM To: William.D.Bartron@dom.com Cc: 'Wanda.D.Craft@dom.com'

Subject:

Acceptance Review for RR for Temporary Non-Code Repair

Dear Mr. Bartron:

By letter dated January 20, 2009, Dominion Nuclear Connecticut, Inc., submitted a relief request for Millstone Power Station, Unit No. 2. The proposed relief request is for temporary non-code repair of the class 3 service water system emergency diesel generator jacket water heat exchanger and the class 3 service water system emergency diesel generator air cooler heat exchanger. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence If you have any questions, please contact me at 301-415-1603 Sincerely, Carleen J. Sanders, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-336

E-mail Properties Mail Envelope Properties (B4ECC0E252653F48B3F57C3B833465E810190E1CF9)

Subject:

FW: Acceptance Review for RR for Temporary Non-Code Repair Sent Date: 06/24/2009 3:45:55 PM Received Date: 06/24/2009 3:45:55 PM From: Sanders, Carleen Created By: Carleen.Sanders@nrc.gov Recipients:

Harold.Chernoff@nrc.gov (Chernoff, Harold)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 14830 06/24/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: