Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML03310017325 April 2002Note to Telephone Conversation - Robert O'Connell - NMSS 2002-A-0002
ML0331001847 May 2002Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002
ML0331001977 May 2002Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002
ML0331001988 May 2002Noie to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002
ML0331002437 August 2002Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002
ML03310027019 August 2002Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002
ML05285006524 October 2005Minutes of Conference Call Regarding Dresden MSSV Setpoint Tolerance (Response to License Condition 4 from July 30, 2004 Amendment)
ML17037C5539 April 1973Note Confirming a Conversation Concerning High Activity Water in 2/3 Waste Surge Tank
ML17252A44631 July 1975Incident Notification Concerning Location of Broken Tack Welds on Jet Pump Restrainer Clamp Bolt Keepers During Tv Camera Examination of Unit 3 Jet Pumps - Dresden Unit 3
ML17252A4846 December 1974Letter Confirming a 12/02/1974 Conversation Concerning the Discovery of Minor Leaks on the Minimum Flow Lines for 3A and 3B Reactor Feed Pumps - Dresden Unit 3
ML17252A49123 October 1974Letter Confirming a 08/28/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition - Dresden Unit 3
ML17252A4954 October 1974Letter Confirming a 10/04/1974 Conversation Concerning the Discovery of DPI83-2352 with a Setpoint Greater than the Technical Specification
ML17252A49730 September 1974Letter Confirming a 09/30/1974 Conversation Concerning Discovery of Lits 3-263-72A and the Set Points Exceeding Technical Specifications
ML17252A50024 September 1974Letter Confirming a 09/24/1974 Conversation Concerning a Through Wall Crack Discovered on Torus Purge Inlet Line 3-8506-18 - Dresden Unit 3
ML17252A50124 September 1974Letter Confirming a 09/21/1974 Conversation Concerning a Minor Leak from Feed Water Pressure Tap 3241-12A - Dresden Unit 3
ML17252A5059 September 1974Letter Confirming a 09/09/1974 Conversation Concerning Failure of E Tip Valve to Close - Dresden Unit 3
ML17252A50714 August 1974Letter Confirming a 08/08/1974 Conversation Concerning a Failure of the Solenoid Operated Isolation Valve Associated with the 3B Traversing Encore Probe to Close - Dresden Unit 3
ML17252A5086 August 1974Letter Confirming a 07/26/1974 Conversation Concerning Failure of the Seat Material of the Air Operated Primary Containment Isolation Valve A03-1601-22 - Dresden Unit 3
ML17252A51129 July 1974Letter Confirming a 07/29/1974 Conversation Concerning Failure of the Seat Material of Air Operated Isolation Valve AO-3-1601-21 - Dresden Unit 3
ML17252A51229 July 1974Letter Confirming a 07/26/1974 Conversation Concerning the Failure of the Seat Material of Air Operated Primary Containment Valve A03-1601-22 - Dresden Unit 3
ML17252A51523 July 1974Letter Confirming a 07/19/1974 Conversation Concerning the Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3
ML17252A51619 July 1974Letter Confirming a 07/19/1974 Conversation Concerning Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3FLEX
ML17252A51716 July 1974Letter Confirming a 07/16/1974 Conversation Concerning the Failure to Reach the Required Containment Oxygen Concentration of 4 Percent within 24 Hours of Placing Mode Switch in Run Position - Dresden Unit 3
ML17252A5194 June 1974Letter Confirming a 06/04/1974 Conversation Concerning the Discovery That the Setpoints of the Switches Which Isolate the High Pressure Coolant Injection System Needed to Be Reset - Dresden Unit 3
ML17252A5216 June 1974Letter Confirming a 06/06/1974 Conversation Concerning a Failure to Open HPCI Steam Isolation Valve M03-2301-3 While Operating the Reactor at 180 PSIG - Dresden Unit 3
ML17252A52210 June 1974Letter Confirming a 06/10/1974 Conversation Concerning Failure of a Three Quarter Inch Nipple on Reactor Feed Pump Dispatch Line 3-3201-24 - Dresden Unit 3
ML17252A52311 June 1974Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3
ML17252A52412 June 1974Letter Confirming a 06/12/1974 Conversation Concerning the Discovery of 2 Reactor High Pressure Scram Switches (PS-3-263-55A and C) with Set Points Above the Technical Specification Limit - Dresden Unit 3
ML17252A52517 June 1974Letter Confirming a 06/17/1974 Conversation Concerning the Failure of Main Steam Drain Valve M03-220-2 to Operate Properly on 05/22/1974 - Dresden Unit 3
ML17252A52624 June 1974Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3
ML17252A5275 July 1974Letter Confirming a 05/24/1974 Conversation Concerning the Discovery of a Set Point Drift of L.I.T.S. 3-263-72A Beyond the Technical Specification - Dresden Unit 3
ML17252A52924 June 1974Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3
ML17252A53617 June 1974Letter Confirming a 06/17/1974 Conversation Concerning a Failure of Main Steam Valve M03-220-2 to Operate on 05/22/1974 - Dresden Unit 3
ML17252A54011 June 1974Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3
ML17252A78719 March 1975Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points in Excess of Technical Specification Values - Dresden Unit 3
ML17252A78919 March 1975Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points Exceeding the Techspec Value of 3 Times Background - Dresden Unit 3
ML17252A82310 February 1975Note to Confirm a Conversation Concerning a Leak in a 3/4 Inch Vent Line at a Well on 3C Reactor Feed Pump Casing - Dresden Unit 3
ML17252A82418 February 1975Note to Confirm a Conversation Concerning Discovery of a Leaking Containment Inerting Isolation Valve A03-1601-21 During Local Leak Rate Testing - Dresden Unit 3
ML17252A82518 February 1975Note Confirming a Conversation Concerning Failure of Bergen Patterson Piping Restraint Number 19 on the Unit 3 HPCI Main Steam Line in the Dry-Well - Dresden Unit 3
ML17252A8326 January 1975Note to Confirm a Conversation Concerning Excess Chloride Content in Unit 3 Reactor Coolant Water During a Extended Reactor Cleanup System Maintenance Outage - Dresden Unit 3
ML17252A8377 January 1975Note Confirming a Conversation Concerning a Xenon Transient Experienced on Unit 3 During a Control Rod Pattern Alteration - Dresden Unit 3
ML17252A90424 May 1974Letter Concerning the Discovery of a Set Point Drift of L.I.T.S. 3-263-72A Beyond the Permissible Value of the Technical Specification - Dresden Unit 3
ML17252A90529 April 1974Letter Confirming a Conversation Concerning Low Levels in the Torus Due to Faulty Indication While Pumping the Level Down - Dresden Unit 3
ML17252A90717 May 1974Letter Confirming a 05/17/1974 Conversation Concerning the Discovery of Leakage Past the 1B Main Steam Line Isolation Valve in Excess of Technical Specification Surveillance Requirements - Dresden Unit 3
ML17252A90815 May 1974Letter Confirming a 05/15/1974 Conversation Concerning Main Steam Area Temperature Switches Being Out of Calibration - Dresden Unit 3
ML17252A91225 April 1975Letter Confirming a 04/25/1975 Conversation Concerning Excessive Leakage Through Torus to Drywell Vacuum Breaker 3-1601-32B During Refuel Outage Local Leak Testing - Dresden Unit 3
ML17252A91323 April 1975Letter Confirming a 04/23/1975 Conversation Concerning Failure of Feedwater Check Valves, 3-220-58A and 62A, and 3A Feedwater Line to Pass Local Leak Rate Test During Refuel Outage Surveillance - Dresden Unit 3
ML17252A91429 April 1974Letter Confirming a 04/29/1974 Conversation Concerning Low Level in the Torus Due to Faulty Indication While Pumping the Level Down - Dresden Unit 3
ML17252A91517 April 1974Letter Confirming a 04/02/1974 Conversation Concerning a Through Wall Crack on the 3/4 Inch Drain Line 3-4802B for 3B Control Rod Drive Water Filter - Dresden Unit 3
ML17252A9164 April 1974Letter Informing of 04/02/1974 Occurrence Relating to a Crack in the 3B Control Rod Drive Water Filter Drain Line - Dresden Unit 3